Loading...
HomeMy WebLinkAboutS-0590-A Staff AnalysisSeptember 10, 1985 SUBDIVISIONS Item No. B NAME: LOCATION: DEVELOPER: The Linkous Co. 12115 Hinson Road Little Rock, AR 72212 Phone: 224-1234 AREA: 4.54 acres Country Club Corporate Center "Short -Form PCD" (Z=4479) ENGINEER: Edward G. Smith & Associates 401 S. Victory Little Rock, AR 72201 Phone: 374-1666 NO. OF LOTS: 9 FT. NEW ST.: 330 ZONING: "R-2" to "PCD" PROPOSED USE: Office The applicant requested that this item be -deferred for 30 days. PLANNING COMMISSION ACTION: (7-10-85) The Planning Commission responded to this owner's request by deferring the matter to August 13, 1985. The motion to defer was passed --by a vote of: 8 ayes, 0 noes and 3 absent. A. Site History A portion of this site has been considered by the Commission for an office development' in the past. B. Developmental Concept 1. To provide a high quality, aesthetically coordinated professional office setting for owner/tenants. 2. To achieve the high quality implied by the-"0-2" zoning while addressing a market which requires lot sizes smaller than two acres. C. Proposal 1. The construction of nine office buildings on approximately 5.0 acres. September 10, 1985 SUBDIVISIONS Item No. B - Continued 2. Project Data Building Size Height 1 10,200 sq. ft. 2-Story 2 10,22.0 sq. ft. 2-Story 3 9,600 sq. ft. 2-Story 4 9,600 sq. ft. 2-Story 5 4,800 sq. ft. 2-Story 6 4,800 sq. ft. 2-Story 7 7,200 sq. ft. 2-Story 8 7,200 sq. ft. 2-Story 9 5,600 sq. ft. 2-Story Total 69,200 sq. ft. 3. Project Features/Amenities a. Improve Hinson Road to City specifications. This includes paving an additional lane and adding improvement such as gutters as sidewalks. b. Heavily landscaped private street: The main access to each lot will be by a 27' street in a 45' right-of-way. A 25' landscape setback will be required from the right-of-way. No parking will be allowed in the setback. C. Parking courts: Parking for each lot will be accommodated in parking courts which will be shielded from the street. d. Common Material and Colors: A palette of materials and colors will be selected from which all buildings will be constructed. e. Sidewalls: The building walls will extend onto the site to unify the various buildings into a coordinated whole. f. The continuance of a pattern of sloped roofs that has been established by developments to the east and west. September 10, 1985 SUBDIVISIONS Item No. B - Continued D. Engineering Comments None at this time. E. Analysis No problems of significance have been found. Parking exceeds the requirements of the Zoning Ordinance. F. Staff Recommendation Approval. SUBDIVISION COMMITTEE REVIEW: The applicant was present. Engineering pointed out that the 27' street was acceptable, even though a 36' street is usually required in a commercial office subdivision. The applicant agreed to restrict the uses to "O-2" only. Engineering agreed to examine the relationship between Greenbriar Drive to the north and Country Club Circle. PLANNING COMMISSION ACTION: The applicant and his architect were present. Several concerned residents of the neighborhood were also in attendance. Their spokesperson was Mr. George Plastiras of 545 Valley Club Circle and the Pleasant Valley Property Owners Association. He requested deferral based on several concerns: (1) The neighborhood was not knowledgeable enough about the project to ask questions. (2) Existing water problems in the neighborhood which could worsen. (3) Unfamiliarity with the proposed drainage plan. (4) Invasion of privacy from proposed two-story buildings. (5) Orientation of lighting and drives. (6) That setbacks be 50' or 70' as currently exist along Hinson Road. (7) Adequacy of screening. The applicant's architect explained the right-of-way would be dedicated for the construction of Hinson as an 801 street, the drainage would be approved by the City's engineers and that the building orientation could be modified and the drives could be internalized. A motion for a 30-day deferral was made and passed by vote of 9 ayes, 0 noes and 2 absent. September 10, 1985 SUBDIVISIONS Item No. B - Continued 5 SUBDIVISION COMMITTEE REVIEW: (8-29-85) Mr. Mike McQueen, the architect, reported that the owner was still trying to resolve the various issues regarding drainage, parking, setbacks and screening with the neighborhood. i