HomeMy WebLinkAboutPC Action Letter - Recommended Approval With ConditionsDepartment of Planning and Development Planning
723 West Markham Street
Little Rock, Arkansas 72201-1334 Development
Phone: (501 )371A790 Fax: (501)399-3435 Building Codes
January 13, 2023
Ed Hankins
McClelland Engineers
7302 Kanis Road
Little Rock, AR 72204
Re: File No. Z-9749
Artspace — PCD
Dear Mr. Hankins:
This is to advise you that in connection with your request concerning the above
referenced file number the following action was taken by the Planning Commission at
its meeting on January 12, 2023:
Approved with conditions.
X Recommended approval with conditions.
Recommended approval as submitted.
Denied your request as submitted.
Deferred to the
Other:
Meeting.
This item will be forwarded to the Little Rock Board of Directors for final action. You or
your representative will need to be present at the Board of Directors meeting to
address any questions which may arise. The meeting date has tentatively been set
for February 21, 2023. The meeting begins at 6:00 pm and is held in the Centre at
University Park, 6401 West 12th Street. If you have any questions please do not hesitate
to contact me at 371-4792.
Respectfully,
Monte Moore
Development Administrator
January 12, 2023
ITEM NO.: 10
NAME: Artspace - PCD
LOCATION: Southwest corner of E 7' and College Streets
Little Rock, AR 72206
DEVELOPER:
Artspace Projects, Incorporated
250 Third Avenue North, #400
Minneapolis, MN 55401
OWNER/AUTHORIZED AGENT:
One Financial Centre Limited Partnership, LLLP (Owner)
Ed Hankins IV (Agent)
McClelland Consulting Engineers, Inc.
7302 Kanis Road
Little Rock, AR 72204
SURVEYOR/ENGINEER:
Aaron W. Musick
McClelland Consulting Engineers, Inc.
7302 Kanis Road
Little Rock, AR 72204
AREA: 1.13 acres
WARD: 1
RRENT ZONING
VARIANCE/WAIVERS
NUMBER OF LOTS: 8
PLANNING DISTRICT: 7
R-4/R-4A
None requested.
A. PROPOSAUREQUEST/APPLICANT'S STATEMENT:
FILE NO.: Z-9749
FT. NEW STREET: 0 LF
CENSUS TRACT: 46
The applicant proposes to rezone a 1.13 acre site from R-4/R-4A to PCD to allow
for the construction of a 4-story, mixed -use building which will contain 72 living
spaces for residents, commercial tenant spaces, multi -use studio space, art
gallery, community room, outdoor public areas including a roof top terrace garden
January 12, 2023
MIXTIVII91=111
FILE NO.: Z-9749
and a public porch for gathering. The site is located at the southwest corner of E
7th and College Streets.
B. EXISTING CONDITIONS:
The property is currently divided into eight (8) undeveloped tracts located between
E 7th and E 8th Street (north/south) and College Street and McLean Street
(east/west). North of the site contain R-4A zoning and uses. South of the site
contain R-4 zoning and uses. To the east across E 8th Street contain primarily
1-2/PD-1 zoning and uses. PRD and additional R-4 zoning and uses are located to
the west. The proposed development is located within the Presidential Park
Overlay District.
C. NEIGHBORHOOD NOTIFICATIONS:
All owners of property located within 200 feet of the site and all neighborhood
associations registered with The City of Little Rock were notified of the public
hearing.
D. ENGINEERING COMMENTS:
1. Boundary street improvements are required per master street plan for a
commercial/collector street standard along McLean Street, East 7th Street,
College Street, and East 8th Street. Boundary street improvements shall
include, but not be limited to, reconstruction of one-half section of the abutting
street if the existing street is not up to city standards. Repair, replace, or
extend existing damaged, missing, and noncompliant curb and gutter,
sidewalk, access ramps or concrete driveway aprons within the public right-
of-way adjacent to the site. Remove abandoned driveway cuts and replace
with curb, gutter, and sidewalk. All work within the public right-of-way shall
conform to City of Little Rock Public Works Standard Details and ADA
guidelines.
2. Additional right of way will be required to be dedicated to the City per master
street plan for a collector/commercial street standard along McLean Street,
East 7th Street, College Street, and East 8th Street.
3. On -site and parallel street accessible parking, accessible ramps, and
accessible route to the building entrance will be required to meet all
accessibility requirements per AR State Fire Prevention Code and ICC
a117.1 (2017).
4_ Provide accessible route from the accessible parking stalls' aisles to
proposed buildings' entrances in accordance with Section 402 & 502 of ICC
A117.1-2017 and 2012 Arkansas Fire Prevention Code Sections 1104.
f�
January 12, 2023
ITEM NO.: 10 FILE NO.: Z-9749
5. Contact Planning and Development Dept., Engineering Division at
501-371-4817 or at 501-918-5348 for inspections of any work in the public
right-of-way prior to placement of concrete or asphalt or for on -site
clarification of requirements prior to commencing work. Failure to do so can
result in removal of any improperly placed concrete or asphalt at the expense
of the owner or contractor.
6. A grading permit might be required prior to initiation of work. Grading permits
are issued by the Planning and Development Dept. at 723 West Markham
Street after approval of sediment and erosion control plans, grading and
drainage plans, land survey, drainage study, and soil loss calculations per
City's stormwater management and drainage manual. Contact Planning and
Development Dept., Engineering Division at 501-371-4817 or at
501-918-5348 or Permits - littlerock.gov to schedule an appointment for
issuance or to answer any questions. Permit cost is based on total project
area at $100.00 for the less than % acre, $200.00 for '/z to 1 acre, and $200.00
for the first acre and $100.00 for each additional acre for project greater than
1 acre.
7. Any work involving one (1) or more acres of disturbed area requires a
State of Arkansas NPDES permit. Contact the Arkansas Department of
Environmental Quality, NPDES branch at 501-682-0744 for applications and
information about General Stormwater Discharge Construction Permit
#ARR150000.
8. Damage to public and private property due to hauling operations or
operations of construction related equipment from a construction site shall be
repaired by the responsible party prior to the issuance of a certificate of
occupancy.
9. Provide as -built plans and data entry template of newly installed or modified
public and private stormwater drainage system prior to issuance of the
certificate of occupancy. Provide the as -built plans and data entry template
to Planning and Development Department, Engineering Division by email to
csmith Jitt€erack.gov and cc dwarner littlerock.gov. If you have any
questions or desire additional information, please do not hesitate to contact
Planning and Development Department Engineering Division at 501-371-
4817 or at 501-918-5348 or email Permitsplittlerock.gov.
10. A maintenance bond for 50% of total construction costs for all completed
public street and drainage improvements within City right of way and as -built
storm drainage infrastructure plans shall be provided to the Department of
Planning and Development before the issuance of a final certificate of
occupancy.
11. The Department requires three (3) phase sediment and erosion control (SEC)
plans to be submitted for all construction projects showing best management
practices (BMPs) for mitigating sediment runoff and erosion along with
January 12, 2023
ITEM NO.: 10 FILE NO.: Z-9749
vegetation specifications for temporary and permanent soil stabilization.
Phase 1 SEC plans shall show SEC BMPs during the stripping, clearing,
grubbing, and rough grading of the site. Phase 2 SEC plans shall show SEC
BMPs during construction of utilities, buildings, roadway infrastructure and
drainage infrastructure. Phase 3 SEC Plans shall show SEC BMPs for final
grading, seeding, and landscaping of the site.
12. Sediment and Erosion Control plans shall also show the pertinent information
as outlined in ADEQ ARR150000 Permit Part II section A-4-H (1-14) and Part
II section A-4-1-2 (A-B).
13. Per City Rev. Code 29-99, stormwater detention for developments is
required. Provide stormwater detention infrastructure to satisfy this
requirement.
14. A drainage study showing all hydrologic calculations for the site and all
hydraulic calculations for the proposed storm sewer pipe system, swales and
ditches, detention ponds, outlet structures, and inlets is required per City's
stormwater management and drainage manual. For final drainage report,
sign, date, and seal the report per AR State Board of Professional Engineers
and Professional Surveyors rules Article 12, Section B (1) (a). Provide
engineer's certification statement saying this drainage report was conducted
by yourself or directly under your supervision and attesting to the accuracy of
the information within this report.
E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation Authority:
1. Submit plans and specifications for proposed sewer infrastructure to LRWRA
for review and approval.
EnterQv: No comments received.
Summit Utilities: No comments.
AT & T: No comments received.
Central Arkansas Water:
All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. There is an existing 20-inch water main on the west side of College St. Field
locate the water main and place on the plans. Provide a minimum of 10-ft
4
January 12, 2023
ITEM NO.: 10 FILE NO.: Z-9749
clearance between the water line and building footing. Special care shall be
taken to avoid disruption of the water line during construction.
3. Provide 20-ft water easement centered on the 20-inch water line.
4. Please submit plans for water facilities to Central Arkansas Water for review.
Plan revisions may be required after additional review. Contact Central
Arkansas Water regarding procedures for installation of water facilities.
Approval of plans by Central Arkansas Water, the Arkansas Department of
Health Engineering Division and Little Rock Fire Department is required.
5. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
Fire Department:
Maintain Access:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per Appendix D
of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road
width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1 Section 10103.2 Grade. Fire apparatus access roads
shall not exceed 10 percent in grade except as approved by the fire chief. If
the grade exceeds 10 percent, approval will be denied and the applicant must
submit request to be reviewed by Fire Chief for Approval.
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading.
Facilities, buildings or portions of buildings hereafter constructed shall be
accessible to fire department apparatus by way of an approved fire apparatus
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least 75,000 pounds.
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas
Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal's Office
5
January 12, 2023
ITEM NO.: 10 FILE NO.: Z-9749
(Capt. Tony Rhodes 501-918-3757, or Fire Marshal Derek N Ingram 501-918-3756
Number and Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comments received.
County Planning: No comments received.
F. BUILDING CODES/LANDSCAPE:
Building Code: No Comments Received.
Landscape:
All landscaping shall comply with Chapter 15 of the City of Little Rock
Landscaping Ordinance. Any variance from the landscape ordinance must be
approved by the Little Rock City Beautiful Commission.
G. TRANSPORTATION/PLANNING:
Rock Region Metro: No comments received.
Planning Division:
The request is in the 1-30 Planning District. The Land Use Plan shows Mixed Use
Urban (MXU) for the requested area. The Mixed Use Urban category provides for
a mix of residential, office and commercial uses not only in the same block but also
within the same structure. This category is intended for older "urban" areas to
allow dissimilar uses to exist, which support each other to create a vital area. Using
the Planned Zoning District or the Urban Use District, high and moderate density
developments that result in a vital (dense) pedestrian -oriented area are
appropriate. The application is to rezone from Low Density Residential District
(R-4A) to Planned Commercial Development (PCD) for a future mixed use
development with residential, office and commercial uses. This site is located
within the Presidential Park Overlay District.
Surrounding the application area, the Land Use Plan Map shows MXU in all
directions. North of E 7th Street are vacant tracts zoned Low Density Residential
District (R-4A). East of College Street is zoned Light Industrial District (1-2), with a
machine shop and metal recycler. To the south of E 8th Street is zoned Two Family
Residential District (R-4) with single family residences. West of McLean Street are
vacant tracts zoned R-4.
C:
January 12, 2023
ITEM NO.: 10 FILE NO.: Z-9749
Master Street Plan:
E 7th Street, E 8th Street, and McLean Street are Local Street on the Master Street
Plan Map. To the east is College Street which is shown as a Collector on the
Master Street Plan Map. Local Streets that are abutted by non-residential
zoning/use or more intensive zoning than duplexes are considered as "Commercial
Streets". These streets have the same design standard as a Collector. Collectors
are roads designed to connect traffic from Local Streets to Arterials or to activity
centers, with the secondary function of providing access to adjoining property.
Right of way is 60' unless otherwise stated. These streets may require dedication
of right-of-way and may require street improvements for entrances and exits to the
site.
Bicycle Plan:
There are no bike routes shown in the immediate vicinity.
Historic Preservation Plan:
There are no existing historic sites on, or in proximity to, this land.
H. ANALYSIS:
The applicant proposes to rezone a 1.13 acre site from R-4/R-4A to PCD to allow
for the construction of a 4-story, mixed -use building which will contain 72 living
spaces for residents, commercial tenant spaces, multi -use studio space, art
gallery, community room, outdoor public areas including a roof top terrace garden
and a public porch for gathering. The site is located at the southwest corner of
E 7th and College Streets.
The property is currently divided into eight (8) undeveloped tracts located between
E 7th and E 8th Street (north/south) and College Street and McLean Street
(east/west). North of the site contains R-4A zoning and uses. South of the site
contains R-4 zoning and uses. To the east across E 8th Street contain primarily
1-2/PD-1 zoning and uses. PRD and additional R-4 zoning and uses are contained
to the west. The proposed development is located within the Presidential Park
Overlay District.
The applicant notes a total building square footage of 108,395 square feet and will
contain four (4) stories with a building height of sixty (60) feet.
The site plan indicates setbacks for the north building to be from 5.69 feet to 6.5
feet along the north property line, 13.99 feet along the east property line and 5 feet
to 14 feet along the west property line. Setbacks for the south building, per the
7
January 12, 2023
ITEM NO.:
FILE NO.: Z-9749
site plan indicates, a 5 foot setback along the east property line, 17.35 feet along
the south property line and 2 foot setback along the west property line. Section
36-418(1) requires a fifteen (15) foot building setback along the west and south
property lines. Staff supports the setbacks for the proposed development and
believes they meet the intent of the DOD.
Section 36-417 of the City's Zoning Ordinance states buildings in the Presidential
Park Overlay Design District shall not exceed a building height of forty-five (45)
feet. Forty percent (40%) of the proposed buildings gross floor area is designated
for residential apartments, which allows an additional thirty (30) feet in in building
height. The proposed building height conforms with ordinance requirements.
The applicant provides the following uses for each level:
1. Level I will contain 8,176 square foot courtyard and spaces for professional
offices, studios, exercise room, gallery, music, classrooms, assembly rooms,
and residential apartments.
2. Level II will contain a 1,557 square foot terrace, community room, and
residential apartments.
3. Level III will contain only residential apartments.
4. Level IV will contain only residential apartments.
Access to the main building, north along E 7th Street, is provided via a concrete
drive apron leading to a parking garage located beneath the building. Parking
access for the building to the south, along E 8tn Street, is accessed via stairs
leading to the parking deck beneath the building.
Section 36-419 of the City's Zoning Ordinance does not require onsite parking for
uses within the Presidential Park Design Overlay District. However, the applicant
is providing 72 parking spaces with a 27,200 square foot ground -level parking
garage, four (4) accessible parking spaces are also provided and 32 parallel off -
site (street parking) is also provided for a total of 104 parking spaces.
The site plan notes an existing platted alley running east/west between 8th and
McLean Streets.
All landscaping shall comply with Chapter 15 of the City of Little Rock Landscaping
Ordinance. Any variance from the landscape ordinance must be approved by the
Little Rock City Beautiful Commission.
The applicant is proposing one (1) dumpster location inside the proposed building.
The dumpster area will be accessed from College Street, through a garage door.
E:3
January 12, 2023
M NO.: 10
O.: Z-9749
The applicant notes exterior signage to be located on the exterior of the building's
fagades only. All signage must comply with Section 36-420 of the City's Zoning
Ordinance.
Any sight lighting must be low-level and directed away from adjacent properties.
Staff is supportive of the requested PCD rezoning. The applicant's proposed use
of the site is similar to the intensity of other developments in the general area and
feels the proposed use will have no adverse impact on the surrounding properties.
Staff is supportive of the overall concept and agrees that this type of development
will be beneficial to the area.
STAFF RECOMMENDATION:
Staff recommends approval of the requested PCD rezoning, subject to compliance
with the comments and conditions outlined in paragraphs D, E, and F, and the staff
analysis, of the agenda and staff report.
PLANNING COMMISSION ACTION: (JANUARY 12, 2023)
The applicant was present. There were no persons present registered in opposition. Staff
presented the item and a recommendation of approval as outlined in the "staff
recommendation "above. There was no further discussion. The item remained on the
consent agenda for approval as recommended by staff, including all staff comments and
conditions. The vote was 10 ayes, 0 nays, 0 absent and 1 open position.
�67