Loading...
HomeMy WebLinkAboutS-0499-A Staff AnalysisOctober 18, 1994 ITEM NO.: 3 FILE NO.: 6-1037 NAME: RESERVOIR FLAT SUBDIVISION— PRELIMINARY PLAT LOCATIQN: On the east side of Reservoir Rd., approximately 0.7 _smile north of Rodney Parham Rd. DEVELOPER: JACK GARRISON 18 Corporate Hill Dr. Little Rock, AR 72205 225-5160 AREA• 2.56 ACRES O IN_G: R--2 P ING DISTRICT: 3 CENSUS TRACT: 22.03 ENQINEER: MCGETRICK ENGINEERING 11225 Huron Ln. Little Rock, AR 72211 223-9900 - MBER OF LOTS,: 6 FT, NEW STREET: 350 PRQPQSED 1JSES: Multi -Family Residential VARYANCES REQUESTED: None STATEMENT OF PROPQ�AL: The applicant proposes the subdivision of a 2.56 acre tract to include: the delineation of 6 lots, and 1 tract, the tract encompassing land in the floodplain which will not be developed; the dedication to the City of land within the subdivision but which is in the floodway; dedication of additional land for the Reservoir Rd. right-of-way and construction of the required Master Street Plan improvements in this right-of-way; and, construction of a cul-de-sac street which is approximately 350 feet in length. The applicant proposes to construct multi -family residential structures on the lots in conformance with the requirements of the R-5 zoning district regulations. No variances -are proposed. A. PRQPQSAWREQUEST: Approval from the Planning Commission is requested for a preliminary plat for a subdivision of a parcel of land to include 6 building sites, a tract in floodplain area which is not 'to- be developed, dedication of "floodway'property to the City, dedication of additional right-of-way for Reservoir Rd. and construction of the required one-half street improvements for Reservoir Rd., and construction of a 350 foot long cul-de-sac street. The subdivision is proposed to be for multi -family residential units, October 18, 1994 ITEM n in FILE -1037 constructed according to the regulations of the R-5 zoning district. No variances are requested. B. EXISTING. QoNa TI0M The site lies along the north bank of the Grassy Flat Creek, and is predominantly heavily wooded. The site was recently zoned R-5, with an OS strip being designated for the Grassy Flat Creek floodway. (Note: The area zoning map has not been updated, and does not show the change in zoning. The area is shown as R-2 on the area zoning map included with the agenda.) The land to the north is zoned R-5, as is land to the northwest across Reservoir Rd. To the east, south, and across Reservoir Rd. to the west is R-2 zoned land. C. E It ERI TILITY MMR T : Public Works reports that, prior to the issuance of a building permit, a complete grading and drainage plan must be submitted for approval. A floodplain development permit must be obtained. One-half street improvements will be required along Reservoir Rd. Little Rock Water Works reports that an acreage charge of $150 per acre applies. An existing 541, water main and its easement are not shown on the plat, and the main will interfere with construction in the proposed lots 2 and 3. Significant cuts or fills in the easement area may be prohibited. - Little Rock Wastewater Utility comments -that there is an existing sewer main located on the property, and that the sewer main and its easement must be shown. Arkansas Power and Light Co. will require 15 foot wide easements along the east, north, and west boundary of the site. Arkansas Louisiana Gas Co. approved the submittal without comment. Southwestern Bell Telephone Co. will require a 10 foot wide easement along the north and east boundary of the plat. The -Little-Rock'FireC-Department approved the submittal without comment. 2 October 18, 1994 BDIV z ITEM n in d FILE NO.: -1 7 D. r E LE(3AL TE H ICAI, DE I As noted by Water Works and Wastewater, there are existing water and Sewer mains located on -the property which are not shown, and which will significantly affect development of the property. Lots 2 and 3, as presently shown, are made, for all practical purposes, undevelopable. A reconfiguration of the lots is made necessary, and the final version of the plat will be different from the version reviewed. The floodway and the right-of-way for Reservoir Rd. were dedicated to the City as part of the rezoning of the property. These areas must not be included in the current plat. Tract A, the land that is in the floodplain, must be retained by the developer and provision for its maintenance must be made. The Subdivision Regulations require the following information, omitted from the submission, be furnished with a preliminary plat application: 1) the type of subdivision being developed; 2) the source of title of the owner; 3) any existing or Proposed covenants and restrictions; 4) the source of the contours, along with the source from which all elevations are derived; 5) natural and cultural features pursuant to Sections 31-89.4 and 31-89.8 of the Subdivision Regulations; 6) the naives of retarded subdivisions abutting the proposed subdivision, with plat book and page number or instrument number, the names of owners of unplatted tracts abutting the proposed subdivision, and the names of all owners of platted tracts in excess of 2 1/2 acres in size; 7) the physical description of all monuments; and, 8) the location of proposed PAGIS monuments. A storm drainage analysis and plan is to be provided. The.vicinity map must be corrected to properly designate the location of the proposed development. _The proposed street name must be designated, and approved by Public Works. Section 36-259 outlines the requirements for R-5 developments. '-Paragraph'6 states that..lots shall not have a depth of less than 100 feet. The lot line lying between the present lots 4 and 5 is 62.8 feet. This lot line must be adjusted, or a variance will be required to be approved by the Board of Directors. 3 October 1-8, 1994 ITEM NO.: 3 Continued FILE NO.: S-1037 E. ANALYSIS• There are major concerns to be addressed prior to approval of the preliminary plat: 1) there is the issue of re configuring the lot layout to leave the area occupied by the water and sewer mains unobstructed; 2) there is the issue of the lot line which is less than 100 feet; and, 3) there is the issue of the floodway area and the Reservoir Rd. right- of-way already being dedicated to the City, and needing to be omitted from the subject plat. There are also minor deficiencies in the plat and in the information needing to be furnished which the applicant can easily rectify. F. STAFF RECOMMENDATIONS: Staff recommends that consideration of the proposed plat be deferred until a correct version -of the plat is submitted and reviewed which reflects the location of the water and sewer mains and their easements, the amended lot configuration based on required changes, and the correct description of the land without the previously dedicated right-of-way and floodway being included. SUBDIVISION COMMITTEE COMMENT: (SEPTEMBER 29, 1994) Mr. Pat McGetrick, the project engineer, was present. Staff outlined the project. The Committee members reviewed -the discussion outline and asked for Mr. McGetrick's response to the items contained in it. Mr. McGetrick indicated that the lots would have to be re -arranged to provide the needed clearance for the water and sewer mains which cut across the presently shown lots 2 and 3. He also said that he would make the needed changes to delete the already dedicated property from the plat. The Committee then forwarded the item to the full Commission for the public hearing. PLANNING MMIS I N ACTI (OCTOBER 18, 1994) Mr. Pat McGetrick, the project engineer, was present. He presented a revised preliminary plat which addressed the staff comments and the deficiencies noted in the Agenda "write-up". David Scherer, the Public Works representative, reviewed the proposed plat briefly, and indicated that the needed changes were made. He reported, though, that Master Street Plan requirements would be necessary on the internal street and on Reservoir Rd.; and, that the Stormwater Detention and the Excavation Ordinance requirements would be applicable. Staff indicated that the average of the side yard lines would have to be at least 100 feet, and indicated that the common lot line between Lots 4 and 5 may have to be adjusted in order to get the required depth along 4 October 18, 1994 SUBDIVISION ITEM NO.: 3 (Continued) _ FILE NO.: 5-1037 that property line. Mr. McGetrick indicated that he any required change. Staff recommended approval of preliminary plat, and the plat was approved with the 10 ayes, 0 nays, 1 absent, and 0 abstentions. would make the vote of 5 1. Meeting Date: November 15, 1994 2. Case No.: S-499-A 3. Request: For PARKSIDE PLACE SUBDIVISION, a WAIVER of the Subdivision Regulations which would require boundary street improvements for W. 54th. St. and 63rd. Ave. 4. Location: On the west side of S. University Ave., north of W. 54th. St. 5. Owner/Applicant: Jeannie K. Elliff 6. Existing Status: The south two lots are vacant; the north lot is the site of The Car Connection automobile sales business. W. 54th. St. and 63rd. Ave. are existing unimproved streets which provide access to homes along 63rd. Ave. and to the side of the Fire Sub -Station. The existing zoning of the site is C-4. 7. Proposed Use: Offices and Commercial 8. Staff R c mmendation: Approval 9. Planning Commission -Recommendation: Approval 10. Conditions or Issues Remainincr to be Resolved: None 11. Right -of -Way Issues: None. -The applicant is dedicating the right-of-way which lies within the property he owns for both W. 54th. St. and 63rd. Ave. 12. R gomm ndati n Forwarded with: A vote of 9 ayes, 0 nays, 1 absent, 1 abstention (Putnam) 13. Oblectors: None 14. Neighborhood Contact Person/Others: Russell Owen, Westmont Watch Group 15. Neighborhood Plan: _65th. Street - West (12) FILE N -4 9-A NAME: PARRSIDE PLACE SUBDIVISION -- PRELIMINARY PLAT LOCATION: On the west side of S. University Ave., north of W. 54th. St. DEVEL PER: JEANNIE R. ELLIFF 11225 Huron Ln. ENGINEER: MCGETRICR ENGINEERING 11225 Huron Ln. Little Rock, AR 72209 Little Rock, AR 72209 223-9900 223-9900 AREA: 4.27 ACRES NWO R OF LOTS: 3 FT. NEW STREET: 0 ZONING: C-4 PROPOSED USES: Office/Commercial PLANNING DI�TRIQT: 12 CENh9 _TRACT: 20.01 VARIANCES REQUESTED: Waiver from the requirement to provide street and sidewalk improvements for W. 54th. St. and 63rd. Ave. ��V;y�l:�u�:�l�k�ii�;l■l�is��+� The developer proposes a preliminary plat for a 4.27 acre tract, involving -the delineation of 3 lots and the dedication of the rights -of -way for both an unimproved section of W. 54th. St. and of 63rd. Ave. The northern -most lot, Lot 3, will contain the existing building currently known as The Car Connection, -located at 5200 S. University Ave. The two other lots are vacant. Lot 1 is bordered on the south by a section of unimproved W. 54th. St. Extending southward from W. 54th. St. is the northern -most portion of unimproved 63rd. Ave. These streets provide access to the side parking area of the Fire Department sub -station located to the south of the applicant's property, and to a number of homes which lie along 63rd. Ave. The entire length of W. 54th. St., and the northern -most portion of 63rd. Ave. lie wholly - within the boundary of the developer's property, but are used, as unimproved, non -dedicated streets, by the public. A waiver from the requirement to provide street and sidewalk improvements in these rights -of -way is requested; the applicant seeks to leave the streets in their currently existing condition. Access to the applicant's property is to be taken from an existing driveway to Lot 3, and a common access easement to be shared by Lots 1 and 2. No access to be permitted from the south, from W. 54th. St. A. PROPOSAL/REQUEST: The applicant seeks Planning Commission approval of a proposal involving the platting of a 4.27 acre tract into 3 lots and providing the rights -of -way for two streets which FILE NO.: _g-429-A (Continued) are currently unimproved, but which are used by the public, W. 54th. St. and 63rd. Ave. Access to the subdivision is to be provided by way of an existing driveway from S. University Ave. to the existing facility on Lot 3, and by way of a common driveway from S. University Ave. to be shared by Lots 1 and 2. No access is to be taken from W. 54th. St., which borders Lot 1 on the south, and a "no access" easement is to be designated along the south border of Lot 1. Since W. 54th. St. and 63rd. Ave. are currently used by the public in their existing unimproved condition, and since the developer does not propose to use the boundary street for access to the subdivision, a waiver from the requirement to make boundary street improvements is sought. Approval of the requested waiver will be sought from the Board of Directors. B. EXITING CONDITIONS: The northern -most part of the tract, designated as Lot 3, is developed, and contains the business currently known as The Car Connection. The property lying south of this business, but north of W. 54th. St., is vacant. W. 54th. St. is an unimproved roadway, used by the public, but is not in a dedicated right-of-way. A narrow roadway running south from W. 54th. St., known as 63rd. Ave., is also not in a dedicated right-of-way, but provides access to a number of homes which lie along it. The northern -most portion of this the 63rd. St. roadway lies within the boundary of the applicant's property. Immediately south of W. 54th. St. is a Fire Department sub -station, and guest parking for it -is head -in parking off W. 54th. St. To the west and north of the tract is floodway/park property owned by the City of Little Rock. The east boundary of the site is S. University Ave. The existing zoning of the tract is C-4, with a mixture of C-4 and C-3 districts to the northwest, west, and south. At the northeast corner of the parcel is a small-0-3 site. Across S. University Ave. is C-3 and I-2 zoned property. C. E I R TIL MME Public Works comments that, prior to the issuance of a building permit, a -storm water detention plan and a sketch grading and drainage plan must be submitted for approval. The Subdivision Regulations and Master Street Plan will require street improvements in the W. 54th. St. right-of- way. Little Rock Water Works reports that a water main extension may be required to maintain domestic service and provide adequate fire protection to Lot 3 and to serve Lot 2. An acreage charge of $150 per acre and a pro-rata front footage charge of $5.00 per foot may apply. These fees are in addition to the normal connection fees. 2 FILE NO.: _8-499-A (Continued) - Little Rock Wastewater Utility reports that a sewer main extension is required, with easements, to serve Lot 3. The existing sewer main located on Lot 1 must have an easement shown. Arkansas Power and Light Co. will require a 10 foot easement along its existing power line, located along the northern boundary of Lot 1. Arkansas Louisiana Gas Co. approved the submittal without comment. Southwestern Bell Telephone Co. will require a 10 foot easement along the north, west, and south boundary of Lot 3, and along the west boundary of both Lots 2 and 1. The Little Rock Fire Department approved the submittal without comment. D. ISSUES/LEGAL/TECHNICAL/DESIGN: The preliminary plat must have: 1) the location of the area accurately shown on the vicinity map; 2) the source of the contours, along with the source from which all elevations were derived; 3) natural and cultural features within -and immediately surrounding the proposed subdivision, pursuant to Sections 31-89.4`and 31-89.8 of the Subdivision Regulations; 4) a stormwater drainage analysis and plan; 5) the zoning classifications within the platted area and of abutting areas; 6) proposed PAGIS monuments; and, 7) a physical description of all monuments. A preliminary Bill of Assurance is required. As a commercial subdivision, the access point(s) to S. University Ave. must be indicated. Ordinance No. 16,577 requires -that access drives be separated by at least 300 feet; therefore, with the existing driveway to the Lot 3 development proposed to remain, Lots 1 and 2 must have a common driveway in a common drive access -easement. -These access driveways must be shown on the plat. Section 31-201(h) states that:- "New boundary -streets shall be avoided, except where a requirement of the Master Street Plan provides a defined alignment. In that event, the development... shall provide one-half of the Master Street Plan s specified improvements and right-of-way. Whenever a proposed subdivision abuts a partially dedicated or constructed public street, the developer shall provide the minimum of one-half of the required improvements and right- of-way." Section 31-201(i) goes on to say: "For the purposes of determining the extent of required improvements on boundary streets, the right-of-way centerline shall be deemed to be the plat boundary." 3 FILE -4 -A n inued) E. ANALYSIS• Only minor deficiencies in the plat and the required submissions remain, and the required corrections or submittals can be easily completed. The applicant's property includes the land which, over time, has been used by the public as streets for access to homes and to the side of the Fire Department sub -station. The applicant proposes to dedicate the right-of-way for W. 54th. St. which lies south of and adjacent to hit property, and to dedicate the portion of 63rd. Ave. which lies within his property. He does not propose to use the roadways for access to his development, and proposes that they be left "as is". He will, then, seek a waiver from the Board of Directors for any required improvements to these rights -of - way. The proposed subdivision, with the noted corrections, and with Board of Directors approval of the waiver of street improvements on W. 54th. St., meets the standards of the Subdivision Regulations for a commercial subdivision. F . STAFF RECQMh RUATIQNS : Staff recommends approval of the preliminary plat, subject to Board of Directors approval of the requested waivers, and recommends approval of the requested waiver on the boundary street improvements. SUBDIVISION COMMITTEE CQMMENT: (SEPTEMBER 29, 1994) Mr. Pat McGetrick, the project engineer was present. Staff outlined the request, and asked Mr. McGetrick about the ownership of the abutting lands to the west and northwest. Mr. McGetrick responded that the City of Little Rock had purchased this property a couple of years ago for the Fourche Creek floodway/park project. This precluded, staff observed, the applicant from being able to accomplish a proper preliminary plat in which his tract would be shown to be divided from the larger tract. The Subdivision Committee members reviewed the proposed subdivision plat, and reviewed with Mr. McGetrick the discussion outline. The matter of the improvements to W. 54th. St. and to 63rd. Ave. were discussed, and Mr. McGetrick reported that a waiver of any improvements would be sought. Mr. McGetrick indicated that a "no access" easement would be designated along the northern right-of-way line of W. 54th. St., and that the applicant would commit to not using this right-of-way for access to his property. The City Engineering staff reviewed with Mr. McGetrick the access point locations for the property, and 4 FILE NO.: 5-499-A (Continued informed him of the requirement for 300 foot separation between access points. The requirement to show the access points and the common access easement on the plat was discussed. Mr. McGetrick indicated that he would make the required corrections on the plat and would furnish the remaining information noted in the discussion outline. The Committee then forwarded the item to the full Commission for the public hearing. PLAIWINGMMI I0N ACTT (OCTOBER 18, 1994) Staff reported that there were no outstanding issues, and recommended approval of the preliminary plat, as well as approval of the requested waivers of street improvements in the W. 54th. St. and 63rd. Ave. rights -of -way. The item was included in the Consent Agenda for approval, and was approved with the vote of 9 ayes, 0 nays, 1 absent, and 1 abstention (Putnam). 5