Loading...
HomeMy WebLinkAboutS-0498 Staff AnalysisApril 10, 1984 SUBDIVISIONS Item No. 8 NAME: University Shopping Center LOCATION: 5820 Asher DEVELOPER: ENGINEER: Tate Roberts Sam Davis Roberts Constr. Co. 8501 W. 8th 2701 W. 7th Street Little Rock, AR Little Rock, AR Phone: 664-0324 Phone: 374-4000 AREA: 22.58 acres NO. OF LOTS: 1 FT. OF NEW ST.: 0 ZONING: "C-3" PROPOSED USES: Retail A. Site History None pertinent to this proposal. B. Proposal 1. To maintain the existing square footage of commercial floor space and parking spaces. 2. To construct the following: Bldg. Type Size Proposed Bldg. 1-Story 9,157 sq. ft. Proposed Bldg. 2-Story 12,000 sq. ft. Proposed Mini -Mall 2-Story 15,337 sq. ft. 3. Building Site Info: A. Total Area ................. 983,643 sq. ft. (pprox. 22.58 acres) B. Total Bldg. Area........... 247,652 sq. ft. C. Total Parking Spaces....... 1,132 Co Engineering Considerations Request that developers discuss overall traffic circulation with City Engineer prior to Planning Commission meeting. April 10, 1984 SUBDIVISIONS Item No. 8 - Continued D. Analysis The applicant is requesting site plan review so that three additional buildings can be constructed. The mini -mall, which will be comprised of 15,337 square feet of retail sales and office area will be built immediately. Building construction will consist of concrete floors and floor slabs on grade, steel columns, beams and bar joists, brick and concrete masonry walls, and a 10-year built-up wall with vaulted skylights over stairway. The other two buildings will be constructed at a later date. Staff has only a few concerns. Due to a few troubled areas related to internal traffic flow, Engineering has requested that the developer meet with them before the public hearing. Two of the proposed buildings, which are closest to the UALR entrance drive, are both backing into the street. We recommend that the buildings be shifted so as to provide enough space to relocate the parking. E. Staff Recommendation Approval, subject to comments made. SUBDIVISION COMMITTEE REVIEW: The applicant was not present. PLANNING COMMISSION ACTION: The applicant's engineer, Sam Davis, was present. A phasing scheme was decided upon with the City engineers. A motion for approval was made, subject to compliance with agreement made with Engineering relative to improvements and phasing. A motion passed by a vote of 7 ayes, 0 noes and 4 absent.