Loading...
HomeMy WebLinkAboutS-0495-D Staff AnalysisJune 11, 1998 ITEM NO.: 2 FILE NO.: S-495: NAME: River Subdivision - Replat of Lot 2 LOCATION: 7615 Fluid Drive DEVELOPER: ENGINEER• JoMik Corp. Civil Design, Inc. P. O. Box 447 William L. Dean Webbers Falls, OK 74470 15104 Cantrell Road Little Rock, AR 72212 AREA: 2.96 Acres NUMBER OF LOTS: 3 FT. NEW STREET: 0 ZONING• C-3 PLANNING DISTRICT: 25 CENSUS TRACT: 40.03 VARIANCES/WAIVERS REQUESTED: None requested. A. PROPOSAL: The applicant proposes to replat Lot 2, River Subdivision into three (3) lots. The lots range in size from 0.82 acre to 1.18 acres and all three lots will be final platted at the same time. Construction of a hotel is planned for Lot 2C. B. EXISTING CONDITIONS: The 2.96 acre property is currently vacant and grass - covered. An office building and a tire recapping business exist to the west, across Fluid Drive, with vacant C-3 zoned property to the northwest and north. There is a convenience store and a trucking facility located to the east, across Fourche Dam Pike. Interstate 440 is located to the south. C. NEIGHBORHOOD COMMENTS: Staff has received no neighborhood comment as of this writing. The Hermitage Neighborhood Association was notified of the public hearing. June 11, 1998 SUBDIVISION ITEM NO.: 2 (Cont.) FILE NO.: S-495-0 D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1. A 20 feet radial dedication of right-of-way is required at the corner of Fluid Drive and Fourche Dam Pike. Construct collector street improvements to Fourche Dam Pike and sidewalks on both streets. 2. All driveways shall be concrete aprons per City Ordinance. 3. Plans of all work in right-of-way shall be submitted for approval prior to start of work. 4. Easements for proposed stormwater detention facilities are required. 5. Obtain permits for improvements within State Highway right-of-way from AHTD, District VI. 6. On site striping and signage plans should be forwarded to Public Works, Traffic Engineering for approval with the site development package. 7. Street improvement plans shall include signage and striping. Completed plans must be approved by Traffic Engineering prior to construction. 8. Fourche Dam has a 1995 average daily traffic count of 8,500. 9. Obtain permits (barricade/street cut) for improvements within proposed or existing right-of-way from Traffic Engineering prior to construction in right-of-way. 10. Prepare a letter of pending development addressing street lights as required by Section 31-403 of the Little Rock Code. All requests should be forwarded to Traffic Engineering. 11. Utility excavation within proposed rights -of -way shall be per Article V of Sec. 30. All lots shall have driveway from Fluid Drive. E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING: Wastewater: Sewer main extension required with easements to serve property. AP&L: No Comment received. ARKLA: No Comment. Southwestern Bell: No Comment. Water: No Comment. Fire Department: No Comment. County Planning: No Comment received. 2 June 11, 1998 SUBDIVISION ITEM NO.: 2 (Cont.) FILE NO.: 5--495-D CATA: CATA serves this area with Route #20 - College Station. There should be no adverse impacts on service with this replat. There are not any improvements at this time to increase services to the area either. F. ISSUES/TECHNICAL/DESIGN: Planning Division: No Comment. Landscape Issues: No Comment. G. ANALYSIS• The applicant submitted a revised preliminary plat to staff on May 27, 1998. The revised plat conforms to the issues raised by the Subdivision Committee and staff. The applicant has noted that all three lots will be -final platted at the same time. H. STAFF RECOMMENDATIONS: Staff recommends approval of the preliminary plat subject to compliance with Public Works requirements. SUBDIVISION COMMITTEE COMMENT: (MAY 21, 1998) Bill Dean and James Dreher were present, representing the application. Staff briefly described the proposed preliminary plat. Staff noted several minor items which needed to be shown on the plat. Mr. Dean stated that all three (3) lots will be final platted at the same time. After a brief discussion of the Public Works requirements, the Committee forwarded the plat to the full Commission for final action. PLANNING COMMISSION ACTION: (JUNE 11, 1998) The staff presented a positive recommendation on this application, as there were no further issues for resolution. There were no objectors to this matter. 3 June 11, 1998 SUBDIVISION ITEM NO.: 2 [Cont. The Chairman placed the item before th FILE NO.: 5-495 e 4