HomeMy WebLinkAboutS-0495 Staff AnalysisMarch 27, 1979
Item No. 9 - Z-3271 - Deferred
Owner:
Applicant:
Request:
Purpose:
Existing Zoning:
Location:
Site Characteristics:
Size:
Existing Land Use:
Abutting Land Use
and Zoning:
Zoning History:
Applicable Regulations:
James A. Pate and Margaret
Reynolds
James A. Pate
Rezone to "I" Light Industrial
Light Industrial and Port
Related Commercial Development
"A" One Family
Northwest corner, East Belt
Freeway at Fourche Dam Pike
Level, Agricultural Land
18.73 Acres +
Vacant
North
- Residential
Unclassified
South
- East Belt Freeway and
Little Rock Port
Authority Property
Zoned "I" Light Ind.
East
- Vacant
Zoned "F" and "I"
West
- School and Vacant
Unclassified
None.
Zoning Ordinance
FACTUAL INFORMATION
March 27, 1979
I tem 9
1. NEED AND/OR DEMAND
Requested rezoning results from an annexation petition.
The applicant states that this property is to be tied
into the future development of the Little Rock Port
Authority Complex.
2. COMPATIBILITY WITH MUNICIPAL PLANS
The only plan which has been developed for the area was
with regard to a previous zoning application. There is
also the extraterritorial land use plan underway which
will cover the location. This request is not
compatible with the zoning plan previously developed.
3e EFFECT ON ENVIRONS
No adverse environmental impacts are anticipated.
4. NEIGHBORHOOD POSITION
None expressed.
5. PUBLIC SERVICES/EFFECT ON
No concerns expressed by departmental reviews.
6. UTILITIES/EFFECT ON
Sewer main extension from the Port Authority system
will be required. Extension from adjacent residential
systems will not be allowed.
7. EFFECT ON PUBLIC FINANCES
None expected.
8. LEGAL CONSIDERATIONS/REASONABLENESS
The property abuts industrially zoned land on the
south. Staff had originally hoped to halt industrial
development to the north of the port at the East Belt
Freeway. However, previous Commission and Board
actions have overturned that staff concern.
March 27, 1979
Item No. 9 - Continued
9. STANDARDS OF QUALITY
None expressed.
10. TRAFFIC AND STREET RIGHT-OF-WAY CONSIDERATION
Additional right -of -way -would be required on Fourche
Dam Pike. At this time, traffic generation figures
cannot be ascertained because no specific development
is proposed.
ANALYSIS:
In April 1978, staff offered a zoning plan for the
property located east across Fourche Dam Pike calling
for a combination of "F" Commercial and "MF-18"
Multifamily zoning. However, the Commission voted 6, 3
and 2 to recommend the applicant's requested "F" and
"I" Light Industrial zoning which was subsequently
confirmed by the Board of Director-s.
Staff review of the zoning request under consideration
here, as well as an additional reconsideration of
general land use patterns in the overall area combined
with the previously committed industrial area just east
across Fourche Dam Pike, has led to the conclusion that
while it is almost certain that further single family
residential development of the area will not occur,
there is substantial argument that the existing
residential uses deserve consideration and protection.
Staff believes that the most appropriate zoning pattern
for this tract would provide "F" Commercial along the
East Belt Freeway frontage and "MF-18" Multifamily for
the remainder of the- property. This recommendation is
consistent with the staff position taken relative to
the parcel to the east.
STAFF RECOMMENDATION
Note: This item was deferred from the January 30, 1979
meeting upon request from the applicant due to illness in
the family.
Staff recommends a combination of commercial and multifamily
residential zoning be recommended to the Board of Directors.
The specific breakdown is as follows: The north 660 ft. to
be rezoned to "MF-18"; the west 630 ft. to be rezoned to
"MF-18"; and the remainder to be rezoned to "F" Commercial.
March 27, 1979
Item No. 9 - Continued
COMMISSION ACTION
The applicant, James Pate, handed out a packet of
information and made a lengthy presentation to the
Commission. There were no objectors present. After a
lengthy discussion, the Commission moved to approve the
petition as filed. The motion failed - 0 ayes, 9 nays, 2
absent.
The Commission then moved to recommend that the entire
parcel be rezoned to "F" Commercial. The motion passed -- 6
ayes, 3 nays, 2 absent.
SUBDIVISION AGENDA FORMS
MEETING DATE: rf
ITEM #i vz C�uh�lJ�S�`a►7
A. PROPOSAL/REQUEST:
l I b P-a r G r�Y�e c� %�Y��c �►+ n a `�
f t ck
B. `EXISTING CONDITIONS:
C. ISSUEVDTSCUSSION/LEGAL/TECHNICAL DESIGN
I
D. ENGINEERING COMMENTS:
E. STAFF RECOMMENDATION: q
a4-
is OA
Yj
c4- k I
(0 1,-
April 10, 1984
SUBDIVISIONS
Item No. 1
NAME: River Subdivision
LOCATION: NW Corner of I-440 Interchange
and Fourche Dam Pike
DEVELOPER: ENGINEER:
Helen Pate Allan Curry
961 Garland Avenue
Little Rock, AR 72201 APPLICANT:
Phone: 372-1843
AREA: 22 acres
ZONING: "C-3"/"I-2"
Swaffar and Assoc., Architects
916 Garland Avenue
Little Rock, AR 72201
NO. OF LOTS: 9 FT. OF NEW ST.: 1,750
PROPOSED USES: Commercial/Office Park
VARIANCES REQUESTED:
1. 125' radius on Steamboat Harbor.
2. Cul-de-sac length - minor commercial street with no
sidewalks.
3. Street right-of=way of 50' along the Highway Department
right-of-way.
4. Cul-de-sac radius of 50'.
5. Pavement widths of 30' back of curb to back of curb.
6. Building setback.
A. Site History
None.
B. Existing Conditions
This property is bordered on the south by the I-440
Eastbelt Expressway, on the east by Fourche Dam Pike
and on the north by Griffin Road.
April 10, 1984
SUBDIVISIONS
Item No. 1 - Continued
C. Development Proposal
This is a request by the applicant to plat a tract of
21.68 acres into 9 lots for commercial use. Lots 1-8
are zoned "C-3." Lot 9 is zoned "I-2." Several
variances have been requested. They include:
(1) No sidewalk since there will be no foot traffic
between buildings.
(2) Turn radius on streets to be 125'.
(3) 50' street right-of-way.
(4) Street pavement width to be 30' back to back of
curb.
(5) Cul-de-sac to be of 50' radius.
(6) Building setbacks to be 15' on two sides when
. tracts have frontage on three sides.
Justification offered is based on the small size and
unusually shaped size of the site and the fact that the
new street fronts on the highway right-of-way along a
substantial portion of the property.
D. Engineering Considerations
1. Improve Fourche Dam Pike to industrial arterial
standards.
2. Discuss street improvements with City Engineers.
3. Steamboat Avenue should be built to collector
street standards. Inform whether or not this is
to be a public street. The street name should not
be avenue since it is to be a cul-de-sac.
E. Analysis
Several issues for discussion have been found. Five of
the variances refer to the streets. The applicant
should build the streets to collector standards which
require a sidewalk on one side, a minimum of 60' of
right-of-way, 36' pavement, and a minimum 300' radius.
A waiver for the cul-de-sac radius is not needed. As
for building setbacks, the applicant should comply with
the "C-3" zoning district or provide justification for
his request. A waiver is needed for cul-de-sac length
appears to exceed the minimum of 7501.
April 10, 1984
SUBDIVISIONS
Item No. 1 - Continued
Staff requests that the developer find out whether or
not Griffin is a dedicated street. If so, Lot 1 needs
to reflect the proper curb radius.
Another issue for discussion revolves around whether or
not this cul-de-sac should'be extended.
F. Staff Recommendation
Approval, subject to comments made.
SUBDIVISION COMMITTEE REVIEW:
The applicant was present. The requested variances were
discussed. It was decided that variances:
#1 - Would be required of the applicant.
#2 - Applicant is to meet with Engineering to decide on
radius.
#3 - A 50-foot right-of-way could be provided only along
the freeway.
#4&5 - Were no longer issues since the applicant has been
required by the Commission to build street to
collector standards.
#6 - No longer an issue.
The applicant was also asked to clarify the status of
Griffin Street and provide easements for Water Works.
PLANNING COMMISSION ACTION:
The applicant was present. There were no objectors.
Engineering reported that a 150-foot radius was decided
upon, and no further information on Griffin could be
obtained. A motion was made for approval, subject to the
submission of three copies of a preliminary revised plat
according to agreement made with the City engineers. The
motion passed by a vote of: 7 ayes, 0 noes and 4 absent.