Loading...
HomeMy WebLinkAboutDrainage Study-R2Stormwater Calcs -Camila Addition using Rational Method Time of Concentration Tc =56 * L^.6 * n^.6 seconds Drainage Basin-1 i^.4 * S^.3 L =925.000 feet n =0.030 S =0.025 ft/ft Iassumed =6.8 inches / hour Tccalculated 577.78 seconds Tccalculated 9.63 minutes 0.16 hours Tc =10 minutes Tc for 25-yr Storm from exhibit 2-5 city of Little Rock Drainage Manual I =6.8 inches I for 25-yr Storm from exhibit 2-5 city of Little Rock Drainage Manual Use Tc =10 minutes Tc =56 * L^.6 * n^.6 seconds Drainage Basin-2 i^.4 * S^.3 L =500.000 feet n =0.030 S =0.056 ft/ft Iassumed =8.4 inches / hour Tccalculated 288.19 seconds Tccalculated 4.80 minutes 0.08 hours Tc =5 minutes Tc for 25-yr Storm from exhibit 2-5 city of Little Rock Drainage Manual I =8.4 inches I for 25-yr Storm from exhibit 2-5 city of Little Rock Drainage Manual Use Tc =5 minutes Tc =56 * L^.6 * n^.6 seconds Drainage Basin-3 i^.4 * S^.3 L =245.000 feet n =0.030 S =0.068 ft/ft Iassumed =8.4 inches / hour Tccalculated 177.21 seconds Tccalculated 2.95 minutes 0.05 hours Tc =3 minutes Tc for 25-yr Storm from exhibit 2-5 city of Little Rock Drainage Manual I =8.4 inches I for 25-yr Storm from exhibit 2-5 city of Little Rock Drainage Manual Use Tc =5 minutes Stormwater Calcs -Camila Addition using Rational Method Runoff Coefficient Pre Development Calculated C values - Drainage Basin 1 Area C10 C25 C100 (C values taken from Table 2-1 of City of Little Rock Drainage Manual) Natural Vegetation 4.94 0.4 0.44 0.5 Clay Soil, Average 2-7% Total Area =4.94 0.40 0.44 0.50 Calculated C values - Drainage Basin 2 Area C10 C25 C100 (C values taken from Table 2-1 of City of Little Rock Drainage Manual) Natural Vegetation 2.06 0.4 0.44 0.5 Clay Soil, Average 2-7% Total Area =2.06 0.40 0.44 0.50 Calculated C values - Drainage Basin 3 Area C10 C25 C100 (C values taken from Table 2-1 of City of Little Rock Drainage Manual) Natural Vegetation 2.54 0.4 0.44 0.5 Clay Soil, Average 2-7% Total Area =2.54 0.40 0.44 0.50 Stormwater Calcs -Camila Addition using Rational Method Runoff Coefficient Post Development Calculated C values - Drainage Basin 1 Area C10 C25 C100 (C values taken from Table 2-1 of City of Little Rock Drainage Manual) Residential 4.94 0.4 0.45 0.65 Residential, 1/2 Ac Lots or Larger Total Area =4.94 0.40 0.45 0.65 Calculated C values - Drainage Basin 2 Area C10 C25 C100 (C values taken from Table 2-1 of City of Little Rock Drainage Manual) Residential 2.06 0.4 0.45 0.65 Residential, 1/2 Ac Lots or Larger Total Area =2.06 0.40 0.45 0.65 Calculated C values - Drainage Basin 3 Area C10 C25 C100 (C values taken from Table 2-1 of City of Little Rock Drainage Manual) Residential 2.54 0.4 0.45 0.65 Residential, 1/2 Ac Lots or Larger Total Area =2.54 0.40 0.45 0.65 Stormwater Calcs -Camila Addition using Rational Method Discharge Pre Development Drainage Basin 1 Q10 =11.86 CFS Q25 =14.78 CFS Q100 =20.25 CFS c =0.40 c =0.44 c =0.50 i=6.00 in/hr i=6.80 in/hr i=8.20 in/hr A=4.94 acres A=4.94 acres A=4.94 acres Drainage Basin 2 Q10 =6.26 CFS Q25 =7.61 CFS Q100 =10.30 CFS c =0.40 c =0.44 c =0.50 i=7.60 in/hr i=8.40 in/hr i=10.00 in/hr A=2.06 acres A=2.06 acres A=2.06 acres Drainage Basin 3 Q10 =7.72 CFS Q25 =9.39 CFS Q100 =12.70 CFS c =0.40 c =0.44 c =0.50 i=7.60 in/hr i=8.40 in/hr i=10.00 in/hr A=2.54 acres A=2.54 acres A=2.54 acres Stormwater Calcs -Camila Addition using Rational Method Discharge Pre Development Drainage Basin 1 Q10 =11.86 CFS Q25 =15.12 CFS Q100 =26.33 CFS c =0.40 c =0.45 c =0.65 i=6.00 in/hr i=6.80 in/hr i=8.20 in/hr A=4.94 acres A=4.94 acres A=4.94 acres Drainage Basin 2 Q10 =6.26 CFS Q25 =7.79 CFS Q100 =13.39 CFS c =0.40 c =0.45 c =0.65 i=7.60 in/hr i=8.40 in/hr i=10.00 in/hr A=2.06 acres A=2.06 acres A=2.06 acres Drainage Basin 3 Q10 =7.72 CFS Q25 =9.60 CFS Q100 =16.51 CFS c =0.40 c =0.45 c =0.65 i=7.60 in/hr i=8.40 in/hr i=10.00 in/hr A=2.54 acres A=2.54 acres A=2.54 acres Stormwater Calcs -Camila Addition Existing Ditch Capacity Mannings equation for Ditch @ S-N of Dreher Road n =0.03 based on n for earth, grass and some weeds Depth Side Slopes Bottom Top area rH slope Velocity Q (ft)(ft)(ft)(ft)(ft^2)(ft/ft)(ft/s)(cfs) 1.5 3.00 2.00 11.00 9.75 0.85 1.000%4.45 43.41 Mannings equation for Ditch @ E-W of Dreher Road n =0.03 based on n for earth, grass and some weeds Depth Side Slopes Bottom Top area rH slope Velocity Q (ft)(ft)(ft)(ft)(ft^2)(ft/ft)(ft/s)(cfs) 1.8 3.00 2.00 12.80 13.32 1.00 1.000%4.95 65.94 Width Width Stormwater Calcs -Camila Addition Proposed Ditch Capacity Mannings equation for Ditch @ S-N of Dreher Road Q100 =10.13 CFS n =0.03 based on n for earth, grass and some weeds Depth Side Slopes Bottom Top area rH slope Velocity Q (ft)(ft)(ft)(ft)(ft^2)(ft/ft)(ft/s)(cfs) 1.5 3.00 2.00 11.00 9.75 0.85 1.000%4.45 43.41 Mannings equation for Ditch @ E-W of Dreher Road Q100 =20.25 CFS n =0.03 based on n for earth, grass and some weeds Depth Side Slopes Bottom Top area rH slope Velocity Q (ft)(ft)(ft)(ft)(ft^2)(ft/ft)(ft/s)(cfs) 1.8 3.00 2.00 12.80 13.32 1.00 1.000%4.95 65.94 Width Width Stormwater Calcs -Camila Addition using Rational Method Proposed Culvert Capacity From To Design Flow (cfs):Slope (ft/ft):Diameter (inches)No. Pipes Manning's Area Full (sf)Wetted Perimeter Full (ft)Hydraulic Radius Full (ft)Flow Capacity (cfs)Yes/No Qd/Qc % Capacity East West 26.33 0.012 24 1 0.012 3.14 6.28 0.5 26.85 Yes 0.98 290295300305310315320300 305 310 315 320 325 305 31 0 3 1 5 320 325 Designing our client's successGNEgarnatengineering@gmail.comBryant, AR 720223825 Mt Carmel RdPh (501) 408-4650P.O. Box 116Benton, AR 72018GarNat Engineering, LLC23036CAMILA ADDITIONCITY OF LITTLE ROCKPULASKI COUNTY, ARKANSAS1.0 'RA,1A*( BA6,1 MARCH 2024 BASIN-1 C=0.50 I=8.2 IN/HR A=4.94 AC Q100=20.25 CFS PRELIMINARY EXISTING 1.5-FT HEIGHT, 11-FT TOP DITCH EXISTING 1.8-FT HEIGHT, 13-FT TOP DITCH PROPOSED 24 INCH CULVERT BASIN-2 C=0.50 I=10.0 IN/HR A=2.03 AC Q100=10.30 CFS BASIN-2B BASIN-3 C=0.50 I=10.0 IN/HR A=2.54 AC Q100=12.70 CFS BASIN-2A