HomeMy WebLinkAboutS-0555-A Staff AnalysisNAME: Landscape Materials & Design Revised
PCD (Z-4188-B)
L-OCATION: 1/4 mile south of Stagecoach on the west
side of Sibley Hole Road
APPLI ANT: Landscape Materials & Design co., Inc.
EXISTING STATUS: Landscaping Business
REOUEST: Improvement of Existing Business
STAFF RECOMMENDATION:
Approval, subject to a (1) report on the filling of the
property from engineering; (2) pavement of the employee
parking lot from the entrance of Sibley Hole Road; (3)
showing mulch area on the site plan.
PLANNING COMMISSION ACTION:
Approval, subject to removal of the fill from the floodway
and submission of a 3-year phasing plan for improvement of
the parking lot in concrete.
Vote: 9 ayes, 0 noes and 2 absent
NAME:
LOCATION:
DEVELOPER:
Landscape Material and
Design Co., Inc.
7901 Stagecoach Road
Little Rock, AR 72204
Phone: 455-2962
Landscape Material and Design
Revised PCD (Z-4188-B)
1/4 South of Stagecoach on the
west side of Sibley Hole Road
ENGINEER:
Ben Kittler, Surveyor
28 Dena Drive
Little Rock, AR 72206
Phone: 888-3960
AREA: 4.8 acres NO. OF LOTS: 1 PROPOSED USES: Greenhouse/
Landscaping
PT. NEW STREET: 0
ZONING: PCD
STAFF REPORT:
This is a request by the applicant to revise an approved PCD
by upgrading and improving the facilities currently on -site
so that their clients would not have to walk through mud and
water to view their plants for sale.
The existing structure of 20,000 square feet was approved
by the City Board of Directors on June 4, 1985. The
proposed area will consist of 18,000 square feet and be 13
feet in height and be raised an average of 2 feet from the
existing grade. The use will be for holding plants and will
allow for storage of various items. The addition is for
retail sales only.
STAFF RECOMMENDATION:
Reserv-d »ntil further information is reviewed. The
applicant is asked to revise a site plan according to
submission requirements, set the finished floor elevations,
Z-4188-B - Continued
show the floodway, and show parking with handicapped spaces.
Staff would like more information on the number of employees
and peak hours for customers and loading of service
vehicles.
Engineering has reported that the applicant has violated an
agreement which prohibited filling parts of the property.
He was asked to begin correcting the situation before the
public hearing.
PLANNING COMMISSION ACTION:
The applicant was present. There were no objectors.
Staff recommended that the item be approved subject to: (1)
a report on the filling of the property from Engineering,
(2) the pavement of employee parking lots from the entrance
at Sibley Hole Road, (3) indicating the mulch area on the
site plan. Engineering reported that the applicant was
making good progress in terms of removing the fill and he
had no objections to the item being considered at this
meeting. The applicant stated that they could not afford to
pave the parking lot at this time and requested the phasing
plan in improvement of the parking lot in concrete. A
motion was made and passed for approval, subject to the
applicant providing staff with a three-year phasing plan
for improvement of the parking lot in concrete and the
removal of the fill from the floodway. The motion passed by
a vote of 9 ayes, 0 noes, 2 absent.
NAME: Landscape Materials & Design Revised
PCD (Z-4188-B)
LOCATION: 1/4 mile south of Stagecoach on the west
side of Sibley Hole Road
APPLICANT: Landscape Materials & Design co., Inc.
EXISTING STATUS: Landscaping Business
REQUEST: Improvement of Existing Business
STAFF RECOMMENDATION:
Approval, subject to a (1) report on the filling of the
property from engineering; (2) pavement of the employee
parking lot from the entrance of Sibley Hole Road; (3)
showing mulch area on the site plan.
PLANNING COMMISSION ACTION:
Approval, subject to removal of the fill from the floodway
and submission of a 3-year phasing plan for improvement of
the parking lot in concrete.
Vote: 9 ayes, 0 noes and 2 absent
NAME:
LOCATION:
DEVELOPER:
Landscape Material and
Design Co., Inc.
7901 Stagecoach Road
Little Rock, AR 72204
Phone: 455-2962
Landscape Material and Design
Revised PCD (Z-4188-B)
1/4 South of Stagecoach on the
west side of Sibley Hole Road
ENGINEER:
Ben Kittler, Surveyor
28 Dena Drive
Little Rock, AR 72206
Phone: 888-3960
AREA: 4.8 acres NO. OF LOTS: 1 PROPOSED USES: Greenhouse/
Landscaping
FT. NEW STREET: 0
ZONING: PCD
STAFF REPORT:
This is a request by the applicant to revise an approved PCD
by upgrading and improving the facilities currently on -site
so that their clients would not have to walk through mud and
water to view their plants for sale.
The existing structure of 20,000 square feet was approved
by the City Board of Directors on June 4, 1985. The
proposed area will consist of 18,000 square feet and be 13
feet in height and be raised an average of 2 feet from the
existing grade. The use will be for holding plants and will
allow for storage of various items. The addition is for
retail sales only.
STAFF RECOMMENDATION:
Reserv-d »ntil further information is reviewed. The
applicant is asked to revise a site plan according to
submission requirements, set the finished floor elevations,
Z-4188-B'- Continued
show the floodway, and show parking with handicapped spaces.
Staff would like more information on the number of employees
and peak hours for customers and loading of service
vehicles.
Engineering has reported that the applicant has violated an
agreement which prohibited filling parts of the property.
He was asked to begin correcting the situation before the
public hearing.
PLANNING COMMISSION ACTION:
The applicant was present. There were no objectors.
Staff recommended that the item be approved subject to: (1)
a report on the filling of the property from Engineering,
(2) the pavement of employee parking lots from the entrance
at Sibley Hole Road, (3) indicating the mulch area on the
site plan. Engineering reported that the applicant was
making good progress in terms of removing the fill and he
had no objections to the item being considered at this
meeting. The applicant stated that they could not afford to
pave the parking lot at this time and requested the phasing
plan in improvement of the parking lot in concrete. A
motion was made and passed for approval, subject to the
applicant providing staff with a three-year phasing plan
for improvement of the parking lot in concrete and the
removal of the fill from the floodway. The motion passed by
a vote of 9 ayes, 0 noes, 2 absent.