HomeMy WebLinkAboutS-00554-B ApplicationCity of Little.Rock
Planning and Development
Filing Fees
Date: i I I t: , 20 b q
Annexation
$
Board of Adjustment
$
Cond. Use Permit/T.U.P.
$
Final Plat
$ , . 3z)
Planned Unit Dev.
$
Preliminary Plat
$
Special Use Permit
$
Rezoning
$
Site Plans
$
Street Name Change
$
Street Name Signs
Number at ca.
$
Public Hearin_ g Sign
Number at ; ea.
$
Total
File No.
Location L
Applicant
By
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME
OTTERCREEK SOUTH ROAD R-O-W DEDICATION
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain I roveme t remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist Date: '0co
ADDRESSING SPECIALIST'S REPORT
I ve the street names and street configuration are acceptable.
Addressing Specialist Date:®�
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
Work orders have been prepared for signage. Indicate the number of street signs ordered for this plat for
billing to developer:
Certain improvements remain uncompleted and a punch list has been prepared and sent.
t-10'T (Le7GL A%S o Traffic Engineer Date:
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
All other requirements for final plat approval have been satisfied.
V121 . 0491r Civil Engineer UII Date: 0100(.0
SURVEYOR'S REPORT
i have reviewed the plat and find that:
4 All requirements for final plat approval have been satisfied.
Surveyor Date:
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
'' 'a k — Date: `7 c(, _
Design Review Engineer/Civil Engineering Manager
July 2005
BILL OF ASSURANCE
2006099265
12/21/2006 10:28:20 AM
Filed 8 Recorded in
Official Records of
PAT O'HRIEN
PULASKI COUNTY
CIRCUIT/COUNTY CLERK
Fees $23.00
OTTER CREEK SOUTH ROAD ROW DEDICATION
OTTER CREEK INDUSTRIAL PARK
LITTLE ROCK, ARKANSAS
KNOW ALL MEN THESE PRESENTS:
THAT, WHEREAS, Alawest-AL, LLC, is the sole owner of the following described lands lying in
the County of Pulaski, State of Arkansas, to wit:
A 60 FOOT STRIP OF LAND BEING THE NORTH 60 FOOT OF LOT 5, OTTER CREEK
INDUSTRIAL PARK, AS RECORDED IN BOOK A, PAGE 753, CIRCUIT CLERK'S OFFICE,
PULASKI COUNTY, ARKANSAS SITUATED IN THE SW 1/4, NE 1/4 AND THE NW 1/4, NE 1/4 OF
SECTION 9, TOWNSHIP 1 SOUTH, RANGE 13 WEST, CITY OF LITTLE ROCK, PULASKI
COUNTY, ARKANSAS, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTHEAST CORNER OF THE SAID NW 1/4, NE 1/4; THENCE
N02031'33"E, 30.18 FEET ALONG THE EAST LINE OF SAID NW -1/4, NE 1/4 TO THE SOUTHEAST
CORNER OF LOT 4B OF OTTER CREEK INDUSTRIAL PARK AS RECORDED IN BOOK C, PAGE
419, CIRCUIT CLERK'S OFFICE, PULASKI COUNTY, ARKANSAS; THENCE N87°32'3"W, 399.24
FEET ALONG SOUTH PROPERTY LINE OF SAID LOT 46 TO THE SOUTHWEST CORNER OF
SAID LOT 46; THENCE S2°27'57"W, 60.00 FEET ALONG THE WEST LINE OF SAID LOT 5;
THENCE S87°32'3"E, 399.18 FEET TO THE EAST PROPERTY LINE OF SAID LOT 5; THENCE
N2°31'33"E, 29.82 FEET ALONG THE EAST LINE OF SAID LOT 5 TO THE POINT OF BEGINNING;
SAID 60 FOOT STRIP OF LAND CONTAINING 0.550 ACRES (23,963 S.F.), MORE OR LESS.
AND, WHEREAS it is desirable that all of the above described property be platted into a right-of-
way adjacent to the existing Otter Creek East Boulevard right-of-way:
NOW, THEREFORE, WITNESSETH:
THAT the said Otter Alawest-AL, LLC, hereinafter termed Grantor, has caused said strip of land to
be prepared by Walter Spaul, a Registered Professional Engineer and surveyed by Walter Spaul, a
Registered Land Surveyor, and a plat thereof made which is identified by the title "OTTER CREEK
SOUTH ROAD ROW DEDICATION, OTTER CREEK INDUSTRIAL PARK, LITTLE ROCK,
ARKANSAS" and the date November 1, 2006 and by the signature of the Circuit Clerk and Ex-Officio
Recorder of Pulaski County, Arkansas, in Plat Book 1_, Page 9c2O, and the Grantor does hereby
make this Bill of Assurance.
AND, the Grantor hereby certifies that it has laid off, platted and subdivided, and does hereby lay
off, plat and subdivide said real estate in accordance with said plat. The lands embraced in said plat
shall be forever known as OTTER CREEK SOUTH ROW DEDICATION, Tract A, Otter Creek Industrial
Park.
1 of 2 ; • f" ' `�
The filing of this Bill of Assurance and plat for record in the Office of the Circuit Clerk and Ex-
officio Recorder of Pulaski County shall be a valid and complete delivery and dedication.
Date - -0&
Gene Taylor, Manager
ACKNOWLEDGMENT
STATE OF ALABAMA)
)SS
COUNTY OF ?,
ALAW EST -ALA, LLC
On this �-6—L- day of 2006, before me, a Notary Public, duly commissioned, qualified
and acting within and for the County and State aforesaid, appeared in person Gene Taylor, to me well known,
who stated that he is the Manger of Alawest-Ala, LLC., and that has been duly authorized on behalf of the
LLC, to execute the foregoing instrument for and in the name and on behalf of said LLC., and further stated
and acknowledged that had so signed, executed and delivered said foregoing instrument for the
consideration, uses and purposes therein mentioned and set forth.
IN TESTIMONY WHEREOF, I have hereunto set my hand and seal the day and year aforesaid.
'A^"�ti• .hey �ccctppP
''+'i T1f��T`
2 of 2
Notary Public
RsV,wmd only for inclusion of rninim= stzrtda*
rL,quirci by the City of Liula Rcdsubdivisicn rcg*1140
Bill of A:>suranco provisions estblisjed by Ua-
developer may exceed rec;ulat M3 of the
little Bock subd:t+isioa and zoning crdinuneco.
itof little Rock Planning Commission
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME
OTTERCREEK SOUTH ROAD R-O-W DEDICATION
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
C. All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain II p me)it7 remain uncompleted and a punch list has been prepared and sent.
n/. Engineering Specialist Date:
ADDRESSING SPECIALIST'S REPORT
I0ave t the street names and street configuration are acceptable.
7
Addressing Specialist Date:,
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
Work orders have been prepared for signage. Indicate the number of street signs ordered for this plat for
billing to developer:
Certain improvements remain uncompleted and a punch list has been prepared and sent.
1-b'j' (LML44,c Traffic Engineer Date:
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
All other requirements for final plat approval have been satisfied. ' f
0-115>Civil Engineer I/II Date: i lIy
SURVEYOR'S REPORT
I have reviewed the plat and find that:
Q IK All requirements for final plat approval have been satisfied.
Surveyor Date:
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied. .
Date: 17 i
Design Review Engineer/Civil Engineering Manager
July 2005
Garner Enqineers
Garver LLC
1010 Battery Street
P. O. Box 50
Little Rock, Arkansas 72203-0050
Phone (501) 376-3633 Fax (501) 372-8042
TO: LITTLE ROCK PUBLIC WORKS
723 W. MARKHAM
LITTLE ROCK, AR.
ATTN: DONNA JAMES
DATE: January 27, 2006
JOB: Warrior Drive R/W Dedication
GARVER JOB NO. 05911771
ENCLOSED PLEASE FIND: COPY OF PLAT AND BILL OF ASSURANCE
PURPOSE: FOR YOUR REVIEW
Quantity
Drawing Numbers L Description Remarks
Repro -
Print Ducible
Warrior Drive
I
1
REMARKS: This job is at least 30 to 40 days away from being constructed and I know that this
can not be filed until after construction is accepted. I will need to know the filing fee for the plat.
Give me a call when it meets your approval. I am sending a copy to Dewayne. As always feel
T..... +.. —.i 1 Y 9N o f-nil Aeii+h nnv rrnmmantc nr ni iPstinns_ Thanks_
Copy of Transmittal
TO: FILE FROM: