Loading...
HomeMy WebLinkAboutS-0554 Staff Analysiss' September 9, 1986 SUBDIVISIONS Item No. 4 NAME: Mabelvale West Industrial Park LOCATION: The south side of Mabelvale West Road, immediately west of Mabelvale Junior High School DEVELOPER: ENGINEER: Bowen Road Property, L.P. Garver and Garver, P.A. 11300 Rodney Parham #260 Box C-50 Little Rock, AR 72212 Little Rock, AR 72203-0050 Telephone: 225-0905 Telephone: 376-3633 AREA: 55 Acres NO. OF LOTS: 28 FT. NEW STREET: 3,200 ZONING: "C-3"/"I-211 PROPOSED USES: Commercial, Light Industrial A. Existing Conditions This property is located in an area that is developing as industrial and institutional uses. It is bordered on the west by the Otter Creek Industrial Park, on the south by the MO -PAC Railroad and on the east by Mabelvale Junior High School. The Southwest hospital site is located across Mabelvale West Road to the north. An application has been made to rezone the 10 acres adjacent to Mabelvale West Road to "C-3" commercial. B . Develop-+ent Pr000sal This is a proposal to plat 55 acres into 28 lots and 3,200' of new streets for industrial use. The Subdivision will be developed in four phases. It is requested that single lot final plats be allowed to accommodate the market needs for lot sizes. C. Engineerinq Comments None at this time. September 9, 1986 SUBDIVISIONS Item No. 4 - Continued D. Analysis Staff usually does not prefer to allow applicants to - final plat on a lot -by -lot basis. However, the applicants request is supported in this instance, as long as the minimum lot requi-rement is met and length of streets to be constructed are specified according to the phasing plan submitted. Staff has no problems with the plan for phasing. E. Staff Recommendation Approval, subject to comments made. SUBDIVISION COMMITTEE REVIEW: At a previous Public Hearing, the Commission voted to rezone the front 10_acres to "C-3," and decided that the plat should reflect a permanent, undisturbed area adjacent to the School. The applicant agreed to show a 50' building line, with 10' use for utilities and identify it on the plat and Bill of Assurance as a nonbuildable area with no paving. PLANNING COMMISSION ACTION: The applicant submitted a revised drawing showing a 40' buffer plus 10' utility easement on the side of the buffer where the building is. A motion for approval was made and passed by a vote of: 11 ayes, 0 noes and 0 absent.