HomeMy WebLinkAboutS-0548-M Staff AnalysisDEVELOPMENT
CONSULTANTS
INCORPORATED
April 9, 2004
Ms. Donna James
City of Little Rock
Department of Planning & Development
723 West Markham Street
Little Rock, Arkansas 72201
RE: Candlewood Commercial Addition SPR
DCI Project #03-185
Dear Donna:
Pursuant to the Subdivision Committee meeting and receipt of staff comments, we have
revised the site plan and provide the following responses:
Planning Staff Comments:
1. Notifications to surrounding owners have been sent and evidence has been
forwarded by separate mailing to your attention.
2. We have removed the existing parking image, under the fuel canopy area.
3. We have provided specific locations and sizes for the shopping center
development signage. We have also requested a variance to allow signage
on three sides of the fuel canopy. Typical elevations will be provided by Kroger.
4. There are a total of five pump islands under the proposed canopy.
5. We have revised the pharmacy kiosk drive arrangement to improve traffic
circulation. This revised arrangement has been reviewed and approved by Bill
Henry, Traffic Engineer, in a meeting with the owners.
Variances/ Waivers:
A variance is now requested to allow signage on three sides of the proposed fuel
canopy.
Engineering • Planning
Land Surveying
Landscape Architecture
2200 North Rodney Parham Road
Suite 220
Little Rock, Arkansas 722124155
Telephone 501-221-7880
Fax # 501-221.7882
G:\03-185\P1anning\03185c.doc
1. Agreed.
2. Agreed.
3. Agreed.
Utilities, Fire Department, & County Planning:
1. Wastewater: Agreed.
2. Entergy: No comment to address.
3. Center -Point Energy: No comment to address.
4. SBC: No comment to address.
5. CAW: Agreed.
6. Fire Department: Agreed.
7. County Planning: No comment to address.
8. CATA: No comment to address.
9. County Planning: No comment to address.
Landscape:
1. Revisions and detailed calculations were done and reviewed with Bob Brown,
Plans Review Specialist. All landscape area issues have been resolved and Bob
has approved the proposed plan revisions.
2. An automatic irrigation system will be provided for all maintained landscape
areas.
3. Landscape Plans stamped by a licensed Landscape Architect will be provided for
construction permitting.
This should address all comments requiring revision responses. For copies of the
revised site plan are enclosed as requested. Please contact my office if you have
questions or require additional information.
Sincerely,
Development Consultants, Inc.
obert . rown
Vice President
cc: Doug Robertson
GA03-185\Planni ng\03185c.doc
size of the meter connection(s) will apply to.this project in addition to normal charges.
This fee will apply to all meter connections including any metered connections off the
private fire system. The service line, meter setter and box will be by the developer's
contractor to Central Arkansas Water specifications. Central Arkansas Water will install
the meter only. Additional fire hydrant(s) will be required. Contact the Little Rock Fire
Department to obtain information regarding the required placement of the hydrant(s)
and contact Central Arkansas Water regarding procedures for installation of the
hydrant(s). Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use. Central Arkansas
Water (CAW) requires that upon installation of the RPZA, successful tests of the
assembly must be completed by a Certified Assembly Tester licensed by the State of
Arkansas and approved by CAW. The test results must be sent to CAW s Cross
Connection Section within ten days of installation and annually thereafter. Contact
Carroll Keatts at 992-2431 if you would like to discuss backflow prevention requirements
for this project.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire Department
at 918-3752 for additional information_
County Planning: No comment received.
CATA: No comment received.
Planning Division: No comment.
Landscape: The proposed parking area is 2,849 square foot short of the eight
percent (8,780 sq. ft.) landscaping required within its interior. To receive credit toward
fulfilling this requirement, interior islands must be at least 7 Y2 feet in width and 300
square feet in area. Interior landscaping islands need to be generally evenly distributed
throughout the proposed parking area to help break up the large expanse of asphalt.
Since an upgrade in landscaping of existing landscape deficiencies will be required,
interior landscape islands should also be added to the existing parking lot.
The proposed width of the perimeter landscaping strip adjacent to Lots 3 and 4 drop
below the 6-foot 9-inch minimum allowed.
An irrigation system to water landscaped areas will be required.
Prior to a construction permit being issued, it will be necessary to submit plans stamped
with the seal of a Registered Landscape Architect.
Revised plat/plan: Submit four (4) copies of a revised preliminary plan (to include the
additional information as noted above) to staff on Wednesday, April 7, 2004.
April 22, 2004
ITEM NO.: 12 FILE NO.: S-548-M
NAME: Candlewood Commercial Subdivision Site Plan Review
LOCATION: 14000 Cantrell Road
DEVELOPER:
Whisenhunt Investments
501 Ranch Road
Bee Branch, AR 72013
ENGINEER:
Development Consultants, Inc.
220 North Rodney Parham Road, Suite 220
Little Rock, AR 72212
AREA: 17.385 acres
CURRENT ZONING
PLANNING DISTRICT
NUMBER OF LOTS: 4 FT. NEW STREET: 0
C-3, General Commercial District
1 — River Mountain
CENSUS TRACT: 42.05
VARIAN C ESNVAIVERS REQUESTED:
1. A variance to allow signage without public street frontage.
2. A variance to allow a reduced perimeter landscape strip adjacent to Lots 1 and 3.
A. PROPOSAL/REQUEST:
The applicant is proposing a revision to a previously approved site plan for the
Candlewood Commercial Subdivision. The proposed revisions include the
expansion of the Kroger store by 30,000 square feet and a change to the
previously approved layout of the buildings located to the east. The second is
the placement of a fuel service canopy located in a current parking area near
Cantrell Road. The fuel island has been placed in the parking area furthest from
the building and used the least. The area also allows for traffic circulation around
the fuel canopy to be isolated from other general parking lot traffic. The third is
the addition of a kiosk to be located in the existing parking area near the Kroger
building to be used as a pharmacy pick-up. The kiosk will allow drive -through
April 22, 2004
SUBDIVISION
NO.: 12 (Cont.
FILE NO.: S-548-M
pick up service of pharmacy prescriptions. The site plan includes a proposed Lot
4 as an out -parcel at the southeast corner of the site. The site plan includes the
placement of a building footprint on the area to allow the development should a
prospective tenant not desire to own their own property.
B. EXISTING CONDITIONS:
The site is developed with a Kroger Store, Bank and fast food restaurant. There
is a vacant out parcel located adjacent to Cantrell Road east of the fast food
restaurant. There is a large portion of the site development has not taken place
on but was previously approved for expanded commercial space and parking.
Other uses in the area include a developing mini -warehouse project located to
the west across Candlewood and a bank located east of the site adjacent to
Cantrell Road. To the northeast of the site is a vacant site zoned 0-3 and a
developing multi -family complex. South of the site is a mixed use development
containing office and commercial uses and a mini -warehouse development.
C. NEIGHBORHOOD COMMENTS:
I�
E
As of this writing, staff has not received any comment from area residents. All
abutting property owners, the Westchester/Heatherbrae Neighborhood
Association and Westbury Neighborhood Association were notified of the public
hearing.
ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
Repair or replace any curb and gutter or sidewalk that is damaged in the
public right-of-way prior to occupancy.
2. A grading permit in accordance with Section 29-186 (c)
required prior to any land clearing or grading activities
grading, and drainage plans will need to be submitted and
the start of construction.
3. Storm water detention ordinance applies to the property.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer available, not adversely affected.
Entergy: No comment received.
Center -Point Energy: No comment received.
and (d) will be
it the site. Site
approved prior to
K
April 22, 2004
SUBDIVISION
ITEM NO.: 12 Cont. FILE NO.: S-548-M
SBC: No comment received.
Central Arkansas Water: All Central Arkansas Water requirements in effect at
the time of request for water service must be met. A Capital Investment Charge
based on the size of the meter connection(s) will apply to this project in addition
to normal charges. This fee will apply to all meter connections including any
metered connections off the private fire system. The service line, meter setter
and box will be by the developer's contractor to Central Arkansas Water
specifications. Central Arkansas Water will install the meter only. Additional fire
hydrant(s) will be required. Contact the Little Rock Fire Department to obtain
information regarding the required placement of the hydrant(s) and contact
Central Arkansas Water regarding procedures for installation of the hydrant(s).
Due to the nature of this facility, installation of an approved reduced pressure
zone backflow preventer assembly (RPZA) is required on the domestic water
service. This assembly must be installed prior to the first point of use. Central
Arkansas Water (CAW) requires that upon installation of the RPZA, successful
tests of the assembly must be completed by a Certified Assembly Tester licensed
by the State of Arkansas and approved by CAW. The test results must be sent to
CAW's Cross Connection Section within ten days of installation and annually
thereafter. Contact Carroll Keatts at 992-2431 if you would like to discuss
backflow prevention requirements for this project.
Fire Department: Place fire hydrants per code. Contact the Little Rock Fire
Department at 918-3752 for additional information.
County Planning: No comment received.
CATA: No comment received.
F. ISSUES/TECHNICAUDESIGN:
Planning Division: No comment.
Landscape: The proposed parking area is 2,849 square foot short of the eight
percent (8,780 sq. ft.) landscaping required within its interior. To receive credit
toward fulfilling this requirement, interior islands must be at least 7 Y2 feet in width
and 300 square feet in area. Interior landscaping islands need to be generally
evenly distributed throughout the proposed parking area to help break up the
large expanse of asphalt. Since an upgrade in landscaping of existing landscape
deficiencies will be required, interior landscape islands should also be added to
the existing parking lot.
The proposed width of the perimeter landscaping strip adjacent to Lots 3 and 4
drop below the 6-foot 9-inch minimum allowed.
3
April 22, 2004
SUBDIVISION
ITEM NO.: 12 Cont. FILE NO.: S-548-M
An irrigation system to water landscaped areas will be required.
Prior to a construction permit being issued, it will be necessary to submit plans
stamped with the seal of a Registered Landscape Architect.
G. SUBDIVISION COMMITTEE COMMENT: (April 1, 2004)
Mr. Robert Brown was present representing the applicant. Staff stated the
request was to add additional elements to the existing site thus necessitating a
subdivision site plan review. Staff indicated the three areas being reviewed were
the placement of a gas canopy on the site near Cantrell Road, the placement of a
kiosk in the parking lot related to the pharmacy and the redesign of the previously
approved commercial space.
Staff requested the applicant remove the existing parking from the site plan
under the proposed fuel island. Staff also questioned the number of fuel stations
proposed for the site. Mr. Brown stated the applicant had indicated there would
be five fueling stations with pumps on each side of the station.
Staff also requested additional information concerning signage. Staff stated
details were needed concerning the proposed canopy signage for the fuel center
and any and all signage existing and proposed on the site. Staff questioned if
additional ground mounted signage would be added as a result of the fueling
center.
Public Works comments were addressed. Staff stated a grading permit would be
required prior to development. Staff also stated the storm water detention
ordinance would apply to development of the site.
Landscaping comments were addressed. Staff stated the proposed landscaping
did not appear to conform to existing requirements. Staff stated new additions of
landscape islands would be required. Mr. Brown stated the site plan was
approved prior to the adoption of the new requirements. Staff stated the previous
requirements included smaller islands and a total of six percent interior
landscaping. Staff stated the new requirements were eight percent interior
landscaping and landscape islands of at least three hundred square feet in area.
Staff stated additional interior landscaping would be required. Mr. Brown
disagreed stating the site plan was approved under the previous conditions and
should not be held to the new standard. Staff stated Mr. Brown should meet with
staff to resolve this issue prior to the resubmission of the proposed site plan.
Staff noted comments from the other reporting departments and agencies
suggesting the applicant contact them individually for additional clarification.
There was no further discussion of the item. The Committee then forwarded the
item to the full Commission for final action.
4
April 22, 2004
SUBDIVISION
ITEM NO.: 12 Cont. FILE NO.: S-548-M
H. ANALYSIS:
The applicant submitted a revised plan to staff addressing concerns raised at the
April 1, 2004 Subdivision Committee meeting. The applicant has shown that the
interior landscape areas meet the eight percent requirement. However, the
interior islands do not meet the minimum square footage requirement or 300
square feet in area. Staff is supportive of the reduced island square footages.
The interior islands are existing and were put in place prior to the adopting of the
existing Landscape Ordinance. The applicant has indicated any future parking
areas will be constructed to meet the existing ordinance requirement for both
percentage of required interior landscaping and the minimum square footage
required for island sizes.
The applicant has indicted a detailed signage plan. The applicant has indicated
the existing sign is somewhat smaller than allowed by the Highway 10 Design
Overlay District. The applicant has indicated on the proposed site plan additional
signage, which will not exceed the Highway 10 Design Overlay standard or a
single monument style sign not to exceed ten feet in height and 100 square feet
in sign area. The applicant has also indicted a single ground mounted sign to be
located near the middle northern drive on Candlewood Drive. This sign is also a
single ground mounted monument style sign with a maximum of ten feet in height
and 100 square feet in sign area.
The applicant has indicated signage will be placed on the fuel canopy on three
sides. The applicant has indicated signage will be placed on the east, west and
north fagade and will cover no more than ten percent of the fagade area. This
request is consistent with signage allowed per the zoning ordinance. Staff is
supportive of this request.
The applicant has indicated a kiosk for pharmacy pick-up within the existing
parking area. The applicant has redesigned the customer pick-up to intersect
perpendicularly with the existing drive. The applicant has also relocated the
kiosk to the south to allow for a minimum stacking of two cars from the main
drive. The applicant is requesting to be allowed to keep the drive lanes as two-
way traffic access. Staff has concerns with the blocking of the drive lanes with
cars waiting to enter or exit the kiosk but the applicant has contacted the Traffic
Engineering Department and a private consultant and both agree the placement
of the kiosk in this location and in the proposed configuration will have the least
impact on traffic circulation.
The proposed site plan includes the expansion of the existing Kroger Store by
30,000 square feet and the addition of approximately 36,000 additional square
feet of retail space. The proposed site plan includes the development of 529
parking spaces. The typical minimum parking requirement for a commercial
61
April 22, 2004
SUBDIVISION
no•nre=irrMr n:�
FILE NO.: S-548-M
development with the proposed total square footage of 119,025 would be 396
parking spaces. The proposed parking is adequate to meet the typical minimum
parking demand.
The applicant is requesting a reduced landscape strip adjacent to Lot 3 of the
site. The applicant has indicated Lot 3 has been final platted and a portion of the
drive abutting Lot 3 has been constructed. To increase the landscape strip to the
required six foot nine inches would be a hardship. The applicant has indicated,
adjacent to Lot 4, a seven foot landscaping strip will be added by relocating the
proposed lot line.
Staff is supportive of the proposed requested site plan. The proposed
development meets the intent of the Subdivision Ordinance for development of a
multiple building site. To staffs knowledge there are no outstanding issues
associated with the proposed request. Staff feels if the proposed development
will be minimal adverse impact on the adjoining properties.
I. STAFF RECOMMENDATION:
Staff recommends approval of the request. subject to compliance with the
conditions outlined in paragraphs D, E and F of the above report.
Staff recommends approval of the requested variance to allow signage without
public street frontage for the signage on the fuel island canopy.
Staff recommends approval of the requested variance to allow a reduced
landscape strip adjacent to the northern boundary of Lot 3.
PLANNING COMMISSION ACTION:
(APRIL 22, 2004)
Mr. Robert Brown was present representing the request. There were no registered
objectors present. Staff presented the item with a recommendation of approval of the
request subject to compliance with the conditions outlined in paragraphs D, E and F of
the above report. Staff also presented recommendations of approval of the requested
variance to allow signage without public street frontage for the signage on the fuel
island canopy and the request to allow signage on all sides of the canopy fagade and
the requested variance to allow a reduced landscape strip on Lot 1 adjacent to Lots 2
and 3.
There was no further discussion of the item. The Chair placed the item on the consent
agenda for approval. The motion was approved by a vote of 10 ayes, 0 noes and
1 absent.
A
h
V1
ITEM NO.: 12
FILE NO.: S-548-M
NAME: Candlewood Commercial Subdivision Site Plan Review
LOCATION: 14000 Cantrell Road
Planning_ Staff Comments: `A ��A/)
1. Provide notification of propertywer�s�l w e�d within 200-feet of the site, complete
p
with the certified abstract list, notice form with affidavit executed and proof of
mailing.
2. Remove the existing parking layer under the proposed gas pumps to make the site
plan more legible.
3. Provide a signage plan for the entire site more specifically indicate ground -mounted
signs, locations and sign area. Provide details concerning any proposed signage
within the development.
4. Indicate the number of fuel stations on the proposed site plan.
5. Rearrange the layout of the kiosk to allow for better circulation. Restrip the parking
spaces and sign the drive aisle located along the proposed exit to indicate one-way
traffic.
c1la.-v��oo.a.
Variance/Waivers: None requested. L
Public Works: � � UV"
"
1. Repair or replace any curb and gutter or sidewalk that is damaged in the public right-
of-way prior to occupancy.
2. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Site grading, and drainage plans
will need to be submitted and approved prior to the start of construction.
3. Storm water detention ordinance applies to the property.
Utilities and Fire Department/County Planning: �Q0"A'P' co,54u��
Wastewater: Sewer available, not adversely affected. �
Enter : No comment received.
�Y
Center -Point Energy: No comment received.
SBC: No comment received. tw� hP11-k
Central Arkansas Water: All Central Arkansas Water requirements in effect at the time
of request for water service must be met. A Capital Investment Charge based on the