HomeMy WebLinkAboutS-0731-D Staff AnalysisNovember 3, 1987
SUBDIVISIONS
Item No. 5
NAME:
Barrow Plaza Addition
LOCATION: John Barrow Road and
Markham Street
DEVELOPER: ENGINEER:
Weingarten Realty, Inc. Summerlin and Associates, Inc.
2600 Sitadell Plaza 1609 South Broadway
Houston, TX 77292 Little Rock, AR 72206
Phone: 713-866-6000 Phone: 376-1323
AREA: 2.07 acres NO. OF LOTS: 3 FT. NEW STREET: 0
ZONING: "C-3" PROPOSED USE: None at Present Time
A. Proposal/Request
(1) To replat 2.07 acres into three lots for
commercial use.
B. Existinq Conditions
The site is located in a commercial area. Lot 2-A has
an existing single story structure. Lot 2B will be
used for the new development and Lot 2C is reserved for
the floodway for Grassy Flat Creek.
C. Issues/Discussion/Legal/Technical/Design
(1) Transfer Creek Lot 2C to City of Little Rock.
(2) Driveway on Lot 2 may be creating spacing problem
which would require a waiver from the ordinance.
( 3 ) Discussion needed regarding use of old roadway.
D. Engineering Comments
(1) Dedicate floodway (Lot 2C).
(2) Driveway on Lot 2B needs to be as far east as
possible due to site distance with bridge railing.
November 3, 1987
SUBDIVISIONS
Item No. 5 - Continued
E. Staff Recommendation
Approval, subject to comments made. The applicant is
asked to look at alternatives to the driveway situation
and discuss with the Commission about the use of the
roadway.
F. Subdivision Committee Review
The applicant explained that Old John Barrow Roadway
was still open from Cunningham Lake Road. He agreed to
submit a letter requesting a waiver of the requirements
for curb spacing and to present more information
regarding the dedication of the floodway at the public
hearing.
PLANNING COMMISSION ACTION:
A motion was made and passed for approval, subject to
overflow parking not to be located above the existing land
surface. The vote: 10 ayes, 0 noes, 1 absent.