HomeMy WebLinkAboutS-0721-B Staff Analysis.. Y
April 7, 1987
ry' SUBDIVISIONS
Item 3 - File No. 721-B
NAME:
LOCATION:
DEVELOPER:
Hathaway Group Agent
1500 Worthen Bank Bldg.
Little Rock, AR 72201
Telephone: 372-1700
_abdivision
Preliminary Plat
North Chicot Road and
state 30 Frontage Road
E.vGI\SCR:
.r—
►�+z,�1Zt,�13 ger, Tanner, Robinson
:1::soc iates Inc*
�tll ,;,,ktath Izard
T,it 1,RoCk, AR 72201
T,1.,%pjjone : 37 5-53 31
AREA: 51.9 Acres NO. OF LOTS: 7
ZONING: "C-4"
PROPOSED USE: Highway Commercial
PLANNING DISTRICT: 15
CENSUS TRACT: 20.01
VARIANCES REQUESTED:
None.
A. Existing Conditions
FT. NEW STREET: 0
A developing commercial =—jr on the north side of
Interstate 30, the land =n partially cleared and
no grade or drainage is; f:st.
C.
D.
1
E.
' 1987
continued
Develo ment Proposal
To create one commercial lot out of the current
Tract C and to title this Lot G consisting of 168' of
frontage and a variable depth up to 5001. This plat
was approved initially as a mixed use preliminary.
Several lots have been sold. A commercial use is being
constructed at the corner of Chicot Road and an
apartment complex was recently completed lying to the
north.
Engineering Comments
Boundary street improvements are required on North
Chicot Road and Mabelvale Pike. Stormwater detention
required on -site also.
Analysis
The Planning staff view of this proposal is that it is
entirely appropriate. The owner has committed to the
extension of the 40' buffer across Tracts C and G in
the fashion required for Tract F on the corner. We
believe this will provide for a more livable
environment for the apartment dwellers on the north lot
being Tract E.
Staff Recommendation
Approval of the plat as filed.
SUBDIVISION COMMITTEE REVIEW:
The item was reviewed by the
that the previous agreement
should be reflected on this
Committee. Staff explained
made regarding improvement
plat.
Utilities - Additional sewer easement required along the
west sides of Tracts A, D, and E around existing sewer main.
On -site fire protection required. An acreage water charge
of $150 per acre will apply.
0
April 7, 1987
J, SUBDIVISIONS
Item 3 - Continued
PLANNING COMMISSION ACTION:
A clarification was made regarding the required buffer
across the lots. Staff explained that it would be as
required by ordinance. A motion for approval, subject to
engineering comments was :Wade and passed by a vote of 11
ayes, 0 noes, and 0 absent.
0