Loading...
HomeMy WebLinkAboutS-0721-B Staff Analysis.. Y April 7, 1987 ry' SUBDIVISIONS Item 3 - File No. 721-B NAME: LOCATION: DEVELOPER: Hathaway Group Agent 1500 Worthen Bank Bldg. Little Rock, AR 72201 Telephone: 372-1700 _abdivision Preliminary Plat North Chicot Road and state 30 Frontage Road E.vGI\SCR: .r— ►�+z,�1Zt,�13 ger, Tanner, Robinson :1::soc iates Inc* �tll ,;,,ktath Izard T,it 1,RoCk, AR 72201 T,1.,%pjjone : 37 5-53 31 AREA: 51.9 Acres NO. OF LOTS: 7 ZONING: "C-4" PROPOSED USE: Highway Commercial PLANNING DISTRICT: 15 CENSUS TRACT: 20.01 VARIANCES REQUESTED: None. A. Existing Conditions FT. NEW STREET: 0 A developing commercial =—jr on the north side of Interstate 30, the land =n partially cleared and no grade or drainage is; f:st. C. D. 1 E. ' 1987 continued Develo ment Proposal To create one commercial lot out of the current Tract C and to title this Lot G consisting of 168' of frontage and a variable depth up to 5001. This plat was approved initially as a mixed use preliminary. Several lots have been sold. A commercial use is being constructed at the corner of Chicot Road and an apartment complex was recently completed lying to the north. Engineering Comments Boundary street improvements are required on North Chicot Road and Mabelvale Pike. Stormwater detention required on -site also. Analysis The Planning staff view of this proposal is that it is entirely appropriate. The owner has committed to the extension of the 40' buffer across Tracts C and G in the fashion required for Tract F on the corner. We believe this will provide for a more livable environment for the apartment dwellers on the north lot being Tract E. Staff Recommendation Approval of the plat as filed. SUBDIVISION COMMITTEE REVIEW: The item was reviewed by the that the previous agreement should be reflected on this Committee. Staff explained made regarding improvement plat. Utilities - Additional sewer easement required along the west sides of Tracts A, D, and E around existing sewer main. On -site fire protection required. An acreage water charge of $150 per acre will apply. 0 April 7, 1987 J, SUBDIVISIONS Item 3 - Continued PLANNING COMMISSION ACTION: A clarification was made regarding the required buffer across the lots. Staff explained that it would be as required by ordinance. A motion for approval, subject to engineering comments was :Wade and passed by a vote of 11 ayes, 0 noes, and 0 absent. 0