October 14, 1986
SUBDIVISIONS
Item No. 5
NAME:
LOCATION:
DEVELOPER:
Heatherbrae Subdivision
Immediately north of Taylor
Loop and Lacy Lane
ENGINEER:
Woodhaven, Inc. Civil Design, Inc.
c/o 1001 Fair Park Blvd. 1001 Fair Park Blvd.
Little Rock, AR 72204 Little Rock, AR 72204
Telephone: 664-4418 Telephone: 664-4418
AREA: 26.6 Acres NO. OF LOTS: 69 FT. NEW STREET: 3,070
ZONING: "R-2"
PROPOSED USE: Single Family
VARIANCES REQUESTED: On -site detention
A. Proposal/R quest
1. To plat 26.6 acres into 69 lots for single family
use.
2. Phase II involves continuation of channelization
of the south fork of Taylor Loop Creek. Final
design of the channel improvements will be part of
Phase II. "As -built" drawings will be submitted
to the Department of Public Works upon completion
of improvements and prior to the submission of the
Phase II final plat.
3. Waiver requested due to:
a. Project's proximity to the major drain and
its relatively small size indicates that
detention facilities would have little effect
in reducing a peak flow on south fork.
b. Major channel improvements proposed will
provide more detention benefits through
channel storage than would the small on -site
detention facilities ordinarily required.
October 14, 1986
' SUBDIVISIONS
Item No. 5 - Continued
B. Existing Conditions
1. Rural, single family area.
2. Land is flat; contours range from 296 feet to 319
feet.
C. Issues/Discussion/Legal/Technical/Design
1. The northeast portion of the property lies within
Master Parks Plan.
2. Engineering approval of waiver request.
3. Clarify ownership/status of property in the
northwest corner.
4. Technical noncompliance:
a. Lot 8 - Inadequate depths.
b. Heatherbrae - Inadequate centerline radius.
C. Nonradial lot lines throughout plat.
d. 30-foot building line on Taylor Loop needed.
e. Sidewalks to be provided on Taylor Loop and
Heatherbrae.
5. Area designated as school site in Highway 10
Land Use Plan.
D. Engineering Comments
1. Redesign the entrance of the subdivision at
Heatherbrae Circle to be a T-intersection as well
as the first street off to the right.
2. Show the detention location and preliminary volume
calculations.
October 14, 1986
40 SUBDIVISIONS
Item No. 5 - Continued
E. Anal sis
David Hathcock reports that there is a street name
conflict with Meadow Court.
A negotiated agreement from the City's Parks Department
must be received before the plat is approved. The
applicant is asked to redesign the plat according to
issues mentioned- Qte a few requireslots radialeJ.otalines,at oand
angles. The Ordinance
30-foot building lines on collector streets (Taylor
Loop).
F. Staff Recommend tion
Reserved until platis
redsignedy requestand Engineering
comments on the applicant's
SUBDIVISION COMMITTEE REVIEW:
Engineering explained that no waiver was needed if the
applicant would oversize
the
tchannel.hat the Redinitheof the
h eoflat
was discussed. It was
feltCove Court were too elomtand
as thelremainderd not dofhthe eplat,
o
the same type of dev pmen
and that the unusable space
and19.the
Staffnorthwest
reportedrthatsthey
be made a part of Lots
would be in touch with the School District about their plans
for the site.
PLANNING COPJMISSION ACTION:
A motion for approval was made and passed by a vote of:
7 ayes, 0 noes, 4 absent.