Loading...
HomeMy WebLinkAboutS-0695 Staff AnalysisApril 24, 1990 SUBDIVISION ITEM NO.: 6 FILE NO.: S-695 NAME: 6615 Woodson Road Replat LOCATION: Off West 65th on Woodson Road DEVELOPER: ENGINEER: McClark Commercial Realty, Inc. Lana Engineering, Inc. 4.Northwest Court P. O. Box 9251 Little Rock, AR 72212 Little Rock, AR 72219 AREA: 5.0 Acres NUMBER OF LOTS: 2 FT. NEW STREET: 0 ZONING: I-2 PROPOSED USES: Industrial PLANNING DISTRICT: 65th Street East (13) CENSUS TRACT: 20.01 VARIANCES REQUESTED: None A. PROPOSAW REQUEST: This proposal consists of a large industrial lot (I-2) replatting into two lots, varies in size: Lot 1R be 4.04 acres and Lot 2-R be 1.0 acre. B. EXISTING CONDITIONS: The site is currently occupied by a 22,500 S.F. warehouse on the north side. There are similar warehouses north from this property. The south and east boundary is bordered with single and multi -family residence. C. ENGINEERING COMMENTS: Existing street h4s curb and gutter, sidewalk should be constructed at this development. Stormwater Detention and Excavation Ordinances apply. April 24, 1990 SUBDIVISION Item No.: 6 (Continued): D. ISSUES/LEGALjTECHNICAL/DESIGN: The replat is basically in good form with resolution of the following several items required: 1. Source of title, book and page on the Certificate of Ownership are missing. 2. Preliminary Bill of Assurance need be submitted. 3. Existing zoning of adjacent property. E. ANALYSIS• The Planning Staff finds no serious fault with the replat subject, however, to resolving the several items pointed out in Items C and D above. F. STAFF RECOMMENDATION: The Staff recommends approval subject to -resolution of above issues pointed out by Engineering and Planning Staff. SUBDIVISION COMMITTEE COMMENT: (April 12, 1990) The applicant was present. This matter was discussed briefly. The Planning Staff indicated no serious faults with this plat except some omissions that needed to be submitted before the public hearing. There being no further discussion on the matter, this item was forwarded to the Commission for final resolution. April 24, 1990 SUBDIVISION• ITEM NO.: 6 (Continued) PLANNING COMMISSION ACTION: (April 24, 1990) The applicant was in attendance. The Planning Staff presented its recommendation on this matter which was approval as submitted with the developer agreeing to build the sidewalks. 2 April 24, 1990 SUBDIVISION ITEM NO.: 6 (Continued) PLANNING COMMISSION ACTION: (April 24, 1990) Ms. Melisa Guner, property owner abutting this plot, was concerned about keeping up with maintenance on the 50 foot wide buffer running on the back of her property. She was concerned about honeysuckle taking over her fence and lack of maintenance. Planning Staff explained to Ms. Guner that the 50 foot buffer should grow in a natural state. The Committee then turned its attention to the sidewalk issue. Mr. Jerry Gardner, from Public Works, suggested that a sidewalk will be constructed at the time when building permit is issued for Lot No. 2. He also suggested to show the sidewalk on the plat and include in the Bill of Assurance. A motion to that fact was made and passed by a vote of 9 ayes, 0 noes, 2 absent. 3