Loading...
HomeMy WebLinkAboutS-0685 Map 8U7, 04,7 TO (-.K. p1)(00 (ZD. ST0336 PIA-t TO PING. 1"_O" V I N C I Ty MA P p SO IDO 200 3� GRAPHIC SCALE 0 oENDTe3 IRON pttQ ❑ pek0TE3 CCNC. MONUMENT N, i IJ Y, LK3 X 5 1' Pox G�'�.vck.T Z L58,27 e� ro co B9 57' W a 16U ti R0aER_r s VATE 0' ` p ' AUK4N."M = _ NO. o : Q 0. 41 o ' L �43•11 25' mldy, Ln- ,;,R m s N r R A 0 L.) T -6 320101E Z49.0I S43°14'E 223.2' NE COR NE'/4, 5W 114. 5Gc-35, T-1--)4, R.-12-W -----a LE9AL QEQQRIEIIQd Part of the NE 1/4, SW 1/4, Section 35, T-1-N, R-12-W, Pulaski County, Arkansas, more particularly described as follows: Beginning at a point 643.11 feet West and 41.92 South of the northeast corner of said NE 1/4, SW 1/4 said point being the intersection of the southerly right-of-way line of State Highway # 338 and the west right-of-way of U. S. Highway # 65; thence along said west right -of way line the following bearings and distances South 32 degrees 10 minutes East 396.2 feet; South 43 degrees 14 minutes East 223.2 feet; South 31 degrees 21 minutes East 71.5 feet; thence South 89 degrees 57 minutes West 855.8 feet to said southerly right= -of -way of State Highway # 338; thence along said southerly right-of-way along the arc of a curve to the right having a radius of 533 feet the following chord bearing and distances North 18 degrees 06 minutes East 163.4 feet; North 33 degrees 09 minutes East 139.0 feet; North 48 degrees 18 minutes East 129.4 feet; North 56 degrees 49 minutes East 69.05 feet; North 76 degrees 55 minutes East 247.72 feet to the point of beginning and containing 5.78 acres, more or less. NUKE QF TITLE Instrument No ------------- QERIIFIQAIIQN QF PRELIMINARY HEYEYIN9 KMAQY I, Melvin Mobbs hereby certify that this plat correctly represents a boundary survey made by me and all monuments shown hereon actually exist and their location, size, type and material are correctly shown. ----------------------- ------------------------------------ Date of Execution Melvin Mobbs Registered Surveyor No. 67, Arkansas &ERIIE'IQAIE QE ERELIMINARY ENGINEERING ACCURACY I, Melvin Mobbs hereby certify that this plat correctly represents a plat made by me, and that engineering requirements of the Little Rock Subdivision Rules and Regulations have been complied with. ---------- ---------------------------------- Date of Execution Melvin Mobbs, Registered Engineer, No. 2771, Arkansas &EBIIE MIQN QE ERELIMINARY ELAI AEERQYAL All requirements of the Little Rock SubdIVISIon Rules and Regulations relative to the preparation and submittal of a Preliminary Plat having been fulfilled, approval of this plat is hereby granted, subject to further provisions of said Rules and Regulations. This Certification shall expire ------------------------- . ---------------------- ------------------------------ Date of Execution Little Rock Planning Commission 1 gwe $41104P The overall development plan is to provide lots for the commerical businesses. There are no known existing or proposed covenants except those proposed on this plat and in the proposed Bill of Assurance. The water shall be supplied by the Little Rock Water department. Sewerage disposal shall be supplied by individual disposal systems to be In accordance with the Arkansas State Department of Health Bureau of Environmental Engineering Bulletin No. 9 (Revised 1969). Drainage and flood control shall be provided for as shown on this plat. Driveways along Dixon Road. shall conform with the driveway rules and regulations of the Arkansas State Highway Department. Phasing 15 Intended as Lot l is the only portion of the plat to be platted and developed at this time. AUMIIN MUEQIYIMIQN EULAQKI &QUNIY4 a8NaNQAM Owner and Subdivider: Harold Austin 7th and Franklin, Pine Bluff, Arkansas. Phone 501-879-4000 Engineer & Surveyor: Melvin Mobbs, P. A. 2400 McCain # 1031-6 North Little Rock, Arkansas 72116 Phone 501-753-9765 Date: June 9, 1986 Revised: June 16, 1986