HomeMy WebLinkAboutS-0685 Map 8U7, 04,7 TO (-.K.
p1)(00 (ZD. ST0336
PIA-t
TO PING. 1"_O"
V I N C I Ty MA P
p SO IDO 200 3�
GRAPHIC SCALE
0 oENDTe3 IRON pttQ
❑ pek0TE3 CCNC. MONUMENT
N,
i
IJ Y, LK3 X 5 1'
Pox G�'�.vck.T
Z L58,27
e�
ro
co B9 57' W a
16U
ti
R0aER_r
s VATE 0'
` p ' AUK4N."M =
_ NO. o : Q
0.
41 o '
L
�43•11
25' mldy, Ln-
,;,R m s N r R A 0 L.) T
-6 320101E Z49.0I
S43°14'E
223.2'
NE COR NE'/4, 5W 114.
5Gc-35, T-1--)4, R.-12-W
-----a
LE9AL QEQQRIEIIQd
Part of the NE 1/4, SW 1/4, Section 35, T-1-N, R-12-W, Pulaski
County, Arkansas, more particularly described as follows:
Beginning at a point 643.11 feet West and 41.92 South of the
northeast corner of said NE 1/4, SW 1/4 said point being the
intersection of the southerly right-of-way line of State Highway
# 338 and the west right-of-way of U. S. Highway # 65; thence
along said west right -of way line the following bearings and
distances South 32 degrees 10 minutes East 396.2 feet; South 43
degrees 14 minutes East 223.2 feet; South 31 degrees 21 minutes
East 71.5 feet; thence South 89 degrees 57 minutes West 855.8
feet to said southerly right= -of -way of State Highway # 338;
thence along said southerly right-of-way along the arc of a curve
to the right having a radius of 533 feet the following chord
bearing and distances North 18 degrees 06 minutes East 163.4
feet; North 33 degrees 09 minutes East 139.0 feet; North 48
degrees 18 minutes East 129.4 feet; North 56 degrees 49 minutes
East 69.05 feet; North 76 degrees 55 minutes East 247.72 feet to
the point of beginning and containing 5.78 acres, more or less.
NUKE QF TITLE Instrument No -------------
QERIIFIQAIIQN QF PRELIMINARY HEYEYIN9 KMAQY
I, Melvin Mobbs hereby certify that this plat correctly
represents a boundary survey made by me and all monuments shown
hereon actually exist and their location, size, type and material
are correctly shown.
----------------------- ------------------------------------
Date of Execution Melvin Mobbs
Registered Surveyor No. 67, Arkansas
&ERIIE'IQAIE QE ERELIMINARY ENGINEERING ACCURACY
I, Melvin Mobbs hereby certify that this plat correctly
represents a plat made by me, and that engineering requirements
of the Little Rock Subdivision Rules and Regulations have been
complied with.
---------- ----------------------------------
Date of Execution Melvin Mobbs, Registered Engineer,
No. 2771, Arkansas
&EBIIE MIQN QE ERELIMINARY ELAI AEERQYAL
All requirements of the Little Rock SubdIVISIon Rules and
Regulations relative to the preparation and submittal of a
Preliminary Plat having been fulfilled, approval of this plat is
hereby granted, subject to further provisions of said Rules and
Regulations.
This Certification shall expire ------------------------- .
---------------------- ------------------------------
Date of Execution Little Rock Planning Commission
1 gwe $41104P
The overall development plan is to provide lots for the
commerical businesses. There are no known existing or proposed
covenants except those proposed on this plat and in the proposed
Bill of Assurance. The water shall be supplied by the Little
Rock Water department. Sewerage disposal shall be supplied by
individual disposal systems to be In accordance with the Arkansas
State Department of Health Bureau of Environmental Engineering
Bulletin No. 9 (Revised 1969). Drainage and flood control shall
be provided for as shown on this plat. Driveways along Dixon
Road. shall conform with the driveway rules and regulations of
the Arkansas State Highway Department. Phasing 15 Intended as
Lot l is the only portion of the plat to be platted and developed
at this time.
AUMIIN MUEQIYIMIQN
EULAQKI &QUNIY4 a8NaNQAM
Owner and Subdivider: Harold Austin
7th and Franklin, Pine Bluff, Arkansas.
Phone 501-879-4000
Engineer & Surveyor: Melvin Mobbs, P. A.
2400 McCain # 1031-6
North Little Rock, Arkansas 72116
Phone 501-753-9765
Date: June 9, 1986 Revised: June 16, 1986