HomeMy WebLinkAboutS-0685 Map 11L) tiGS TO t.(Z•
l
DIAOO R0. STlj 33B
TO PIna PLL)F►
V I N c i T% M A P
h7S.
6'
/.,p,�E q
i� A1:li�5,1S
• . a
;AL
C�iGt;+liEI
NciM _ 0c*-
t/N F.
3S5•a I
```
STATE OF .
_ �ARKANSA; ti
;' NO 01
�'. Pam/ ''n< <%N F. N•0
'q L ANC
NE coR NE'4, 5W 114
5'Zc SS, T-I-N, R-12-W
�. tT
UQ6L 9929BLE1I9N
Part of the NE 1/4, SW 1/4, Section 35, T-1-N, R-12-W, Pulaski
County, Arkansas, more particularly described as follows:
Beginning at a point 643.11 feet West and 41.92 South of the
northeast corner of said NE 1/4, SW 1/4 said point being the
intersection of the southerly right-of-way line of State Highway
# 338 and the west right-of-way of U. S. Highway # 65; thence
along said west right -of way line the following bearings and
distances South 32 degrees 10 minutes East 396.2 feet; South 43
degrees 14 minutes East 223.2 feet; South 31 degrees 21 minutes
East 71.5 feet; thence South 89 degrees 57 minutes West 855.8
feet to said southerly right= -of -way of State Highway # 338;
thence along said southerly right-of-way along the arc of a curve
to the right having a radius of 533 feet the following chord
bearing and distances North 18 degrees 06 minutes East 163.4
feet; North 33 degrees 09 minutes East 139.0 feet; North 48
degrees 18 minutes East 129.4 feet; North 56 degrees 58 minutes
East 70.6 feet; North 77 degrees 00 minutes East 246.2 feet to
the point of beginning and containing 5.78 acres, more or less.
$4uBQE 4E TITLE Instrument No.___________________
QEB1IEIQ61I9N QE RHUMIN6Bl 9QUIXINQ AMB6Ql
I, Melvin Hobbs hereby certify that this plat correctly
represents a boundary survey made by me and all monuments shown
hereon actually exist and their location, size, type and material
are correctly shown.
-------------- --------- --=---------==— =--------------------
Date of Execution Melvin Hobbs
Registered Surveyor No. 67, Arkansas
"BTIE"AN QE EN"MIN621 ENQINEEBINQ 6994B691
I, Melvin Hobbs hereby certify that this plat correctly
represents a plat made by me, and that engineering requirements
of the Little Rock Subdivision Rules and Regulations have been
complied with.
Date of Execution Melvin Hobbs, Registered Engineer,
No. 2771, Arkansas
201IEIQ6119N QE EBELAIN6Bl U&I 6 ERML
All requirements of the Little Rock Subdivision Rules and
- - - Reg-ulations relative to the preparation and submittal of a
Preliminary Plat having been fulfilled, approval of this plat is
hereby granted, subject to further provisions of said Rules and
Regulations.
This Certification shall expire _________________________ .
---------------------- --------------'AL----------------------
Date- of Execution Little Rock Planning Commission
IUEQBl6II9U
The overall development plan is to provide lots for the
commerical businesses. There are no known existing or proposed
covenants except those proposed on this plat and in the proposed
Bill of Assurance. The water shall be supplied by the Little
Rock Water department. Sewerage disposal shall be supplied by
individual disposal systems to be in accordance with the Arkansas
State Department of Health Bureau of Environmental Engineering
Bulletin No. 9 (Revised 1969). Drainage and flood control shall
be provided for as shown on this plat and in accordance with
Little Rock rules and regulations. Driveways along Dixon Road.
shall conform with the driveway rules and regulations of the
Arkansas State Highway Department. Phasing is intended as lot l
is the only portion of the plat to be developed at this time.
6QQTIN aQ@QIYI5IQN
E 2 L 6 Q K 1 999N1I4 66K6NQaa
Owner and Subdivider: Harold Austin
&th and Franklin, Pine Bluff, Arkansas.
Phone 501-879-4000
Engineer & Surveyor
Date: June 9, 1986
Melvin Mobbs, P. A.
2400 McCain # 1031-6
North Little Rock, Arkansas 72116
Phone 501-753-9765