Loading...
HomeMy WebLinkAboutS-0685 Map 1t DiAO0 RD. ST0338 T H 15 PtA-r TO PIPl4 P_LJFr VINCIT-/ MAP Ntg. p SO ►o0 200 300 GRAPHIC SCALE 0 OENOre3 IRON PIN QaAd0T 3 CGINC.MONUM51'JT M���:`O_ p;v N��fi' �.:.• ' c AV O '/jlnnn.�•N• fJ fiL 4K3.(51 As I81 Ac. PCK C✓l-VCti T z�g.z7 cl 4. 7 � 1 _ L Q T „I" -151 SGo S,F. -1I0'Ea3a. 2 189.0' � U ,W r �0. 0 �' r / _ N IB°OCi E TRAGT .. A,. A r, I�S•4 '-4-�•II - L$' r51 41, Ln. NBcoR NE'k 5W114. \ ssc35, T-I-N, R-12•W 6 32"lo'E 269.0I \C 5 1° " \ EXIST. 48" KCF I �XItTTe-H S atp 57' W 868.6' w f � titi3 R6)aZRT `RMr,NTRA0QT A1H, O. Z 4 g" � lh L 22 3.2' 5 31-21'E \ TI. 51 LEM PM@QBIETIQN Part of the NE 1/4, SW 1/4, Section 35, T-1-N, R-12-W, Pulaski County, Arkansas, more particularly described as follows: Beginning at a point 643.11 feet West and 41.92 South of the northeast corner of said NE 1/4, SW 1/4 said point being the intersection of the southerly right-of-way line of State Highway # 338 and the west right-of-way of U. S. Highway # 65; thence along said west right -of way line the following bearings and distances South 32 degrees 10 minutes East 396.2 feet; South 43 degrees 14 minutes East 223.2 feet; South 31 degrees 21 minutes East 71.5 feet; thence South 89 degrees 57 minutes West 855.8 feet to said southerly right= -of -way of State Highway # 338; thence along said southerly right-of-way along the arc of a curve to the right having a radius of 533 feet the following chord bearing and distances North 18 degrees 06 minutes East 163.4 feet; North 33 degrees 09 minutes East 139.0 feet; North 48 degrees 18 minutes East 129.4 feet; North 56 degrees 49 minutes East 69.05 feet; North 76 degrees 55 minutes East 247.72 feet to the point of beginning and containing 5.78 acres, more or less. MKS QE TITLM Instrument No.------------------- . &MBTIE MIQN QE EBMLININBBY HEYMYINQ BQQQBBQY I, Melvin Hobbs hereby certify that this plat correctly represents a boundary survey made by me and all monuments shown hereon actually exist and their location, size, type and material are correctly shown. ----------------------- ------------------------------------- Date of Execution Melvin Hobbs Registered Surveyor No. 67, Arkansas QMBTIEI&919 QE EBMLININABY MNGINMMBING [CCURACY I, Melvin Hobbs hereby certify that this plat correctly represents a plat made by me, and that engineering requirements of the Little Rock Subdivision Rules and Regulations have been complied with. --------------------- ----------------g----------g--------- Date of Execution Melvin Hobbs, Re (stered En sneer, No. 2771, Arkansas SMBTIE19AUQN QE EBMLININUX ELBT MUM All requirements of the Little Rock Subdivision Rules and Regulations relative to the preparation and submittal of a Preliminary Plat having been fulfilled, approval of this plat is hereby granted, subject to further provisions of said Rules and Regulations. This Certification shall expire ------------------------- . ---------------------- ------------------------------------ Date of Execution Little Rock PlanningCommission INEQUAINN The overall development plan is to provide lots for the commerical businesses. There are no known existing or proposed covenants except those proposed on this plat and in the proposed Bill of Assurance. The water shall be supplied by the Little Rock Water department. Sewerage disposal shall be supplied by individual disposal systems to be In accordance with the Arkansas State Department of Health Bureau of Environmental Engineering Bulletin No. 9 (Revised 1969). Drainage and flood control shall be provided for as shown on this plat. Driveways along Dixon Road. shall conform with the driveway rules and regulations of the Arkansas State Highway Department. Phasing Is intended as Lot 1 is the only portion of the plat to be platted and developed at this time. 8S�@TIN @Q@QIYI@I4N Owner and Subdivider: Harold Austin 7th and Franklin, Pine Bluff, Arkansas. Phone 501-879-4000 Engineer & Surveyor: Date: June 9, 1986 Melvin Hobbs, P. A. 2400 McCain It 1031-6 North Little Rock, Arkansas 72116 Phone 501-753-9765 Revised: June 16, 1986 7C