Loading...
HomeMy WebLinkAboutPRELIMINARY DRAINAGE ANALYSIS 050924CONCRETE APRON TO BE REMOVED PROPOSE D ASPHALT PARKING PROPOSE D ASPHALT PARKING PROPOSE D ASPHALT PARKING PORTION OF FENCE OUTSIDE OF EASEMENT TO BE REMOVED FLO W S E G M E N T # 1 SCS S h e e t F l o w L=10 0 F T S=10. 0 0 % Trave l T i m e = 1 0 . 6 1 EXISTING OFFSITE DRAINAGE AREA #1 AREA: 2.63 Acre C: 0.40 TOC: 12 MIN. EXISTING OFFSITE DRAINAGE AREA #3 AREA: 0.14 Acre C: 0.85 TOC: 5 MIN. EXISTING DRAINAGE AREA #4 AREA: 0.96 Acre C: 0.55 TOC: 5 MIN. FLOW SEGMENT #1 SCS Sheet Flow L=81 FT S=2.00% Travel Time=9.81 EXISTING DRAINAGE AREA #2 AREA: 0.61 Acre C: 0.55 TOC: 11 MIN. FL O W S E G M E N T # 2 SC S S h a l l o w C o n c e n t r a t e d F l o w L= 3 3 5 F T S= 7 . 5 0 % Tra v e l T i m e = 1 . 2 6 FLOW SEGMENT #3 SCS Channel Flow L=289 FT S=2.00% Travel Time=0.53 FLOW SEGMENT #2 SCS Shallow Concentrated Flow L=65 FT S=2.00% Travel Time=0.48 VICINITY MAP LEGEND 25 RAHLING CIRCLE, SUITE A-2 LITTLE ROCK, ARKANSAS 72223 PHONE: (501) 214-9141 CIVIL ENGINEERING - CONSULTING SERVICES - LAND SURVEYING JOE WHITE & ASSOCIATES, INC. PRELIMINARY DRAINAGE ANALYSIS JOE WHITE F & ASSOCIATES,INC. #3871 OETAIFITREC NOITAZ IR OHTUAC -E N G INEERAR K ANSAS DRAINAGE DISCHARGE POINT A A=3.24 ACRES Q 100 YR.=10.79 CFS DRAINAGE DISCHARGE POINT B A=1.10 ACRES Q 100 YR.=6.36 CFS