HomeMy WebLinkAboutS-0672 Applicationon >,
�b
t~ cd r�
co o 0
+—I p N
F+ Pq cV
n
a) •C
•r>-I N U]
ca W co
4-J ca
" U aa) �+
N O 41. cd
PCI Pd (i) � x
a) a1 ca
4-J rI r"a
N 4-3 0 I "�
'0 •rl cJ
0 rl LH rI O
p LH ca
(1) O a) x a�
PU. -T-1 '>1 41
• 4-J 44 4J
U] •rl 4-I •rl •rl
U 0 U a
a U r
Y f O
. W �CO
z z,—
� Q �
a
■ Q
N X
U ~
W R
F-
2
Z
< �
� a �
Q
a U) ■
Ir
i w w
Z D
Z j
W d
Y z �
J
CO
Zo O
O
O
CITY OF L TLE( "CK
OFFICE OF COMPRENEfflff PLANNING
FILING FEES
n�L M.
�o,�rk. 19'.�
Rezoning Application . . . . .
Board of Adjustment Application �F3~n~
Preliminary Plat . . . . . . . . . . . . . . .
Street Name Signs: No. Signs At Ea.
TOTAL
I.
j By
File No.: Address:
1: Applicant. ✓./���.,�.4
$
?,J,
QtLl5r ly (I�A10(777tV mFTZ-
'51 ('y �� r 5s VE
v ' 1P 7551
&L'MPL-�F- (PT�- PC
6A
October 1, 1986
Mr. Ray Wagner
Systems Management Development Corporation
Pleasant Valley Professional Building
12115 Hinson Road
Little Rock, AR 72212
Re: Request for Information Relative to Development
of Property in the Area of Mara Lynn Road at Napa
Valley Road Consisting of 18.217 Acres +
Dear Mr. Wagner:
The purpose of this letter is to respond to your
communication of September 29, 1986, and the several
requests outlined in that letter. My response to your first
question as to the zoning of the property is that this site
is currently classified "III-12" Multifamily District which
classification permits a maximum of 12 dwelling units per
gross acre of land.
As to your second question concerning the use of
right-of-way, there are two issues associated with this
issue; first of which is the current right-of-way not needed
for the Mara Lynn/Napa Valley realignment will require
abandonment by the City by Ordinance. This portion will
become a part of the development area and without question
may be used for determination of density. The second issue
is that portion of the right-of-way of the current Mara Lynn
Road which will remain within the four lane 80' wide
facility. This area of land to the centerline of the
roadway along the north boundary of this property may be
utilized in computing density.
As to the third question in your letter, the southern
portion of this land lies within the floodplain of Rock
Creek and as such, City Policy and Ordinance will require
that portion of the property lying within the floodway be
dedicated to the City of Little Rock at the time of filing
of the final plat for record. This event can occur either'
before the issuance of the building_ permit or after,
depending upon the manner in which a site plan is approved;.
In closing, let me add to the above comments a reminder that
additional -proposals to develop this property in the general
fashion of k-1ighland Ridge Apartments will require Planning
Commission review and approval as a subdivision multiple
structure site plan.
If you have further questions concerning the development of
this site, please coo not hesitate to contact my office.
Sincerely,
Richard wood
Current Planning Manager.
."s. w: vt11
cc: Case File
Bernadette Pettard
REAL ESTATE DEVELOPMENT
SYSTEMS MANAGEMENT
RETIREMENT SYSTEMS
•DEVELOPMENT
DEVELOPMENT CORPORATION -MANAGEMENT
•MARKETING
PLEASANT VALLEY PROFESSIONAL BUILDING
12115 Hinson Road
Little Rock, Arkansas 72212
(501)225-9407
September 29, 1986
Attn: Richard Wood
Office of Comprensive Planning
City Hall, Room 311
Little Rock, Ar. 72201
Re: 18.217 Acres(south) on Mara Lynn Road
Dear Richard,
We are presently in the process of offering the above property on
Mara Lynn to some out of state developers and will need the following
information from you to assist in their decision making.
I need verification of current zoning status of above mentioned
property. Also, as you recall from a previous application on this
property, the city agreed to allow the prospective developers to use
the right-of-way portion__that will be lost to the city to figure
their density allowance. Would you please copy me on the history
of that situation and as it will pertain to another group of
developers we are currently working with. Another item I will need
clarification on is the portion of the property that is in the
flood plan and what will be the disposition of it, in regards to
city requirements.
If there is any other information pertaining to this partial.of land
that would effect any future decisions on how it could be developed,
I would appreciate you covering them in your response.
Thank a great deal for your cooperation and prompt response.
'ncere].y,
Ray Wagner,
Broker
' f� Rock 7huKicipal Water Watks
Post Office Box 1789
LITTLE ROCK, ARKANSAS 72203
nY MAY 1986
Office of Comprehensive Planning
City Hall
Markham at Broadway
Little Rock:, Arkansas 72201
RE-. HIGHLAND RIDGE APTS. SITE PLAN! REVIEW
On JUNE 10, 1986, the Little Rock: Planning Commission
will consider the above referenced plat
We would appreciate the consideration of our comments
and/or recommendations.
ON SITE FIRE PROTECTION IS REOUIREDn SHOULD REVISE FIRE HY-•-
DRANT LAYOUT SUBMITTED TO DEVELOPER.
B y o lon.dh 0
LITTLE ROC:k: MUNICIPAL WATER WORIk::S
lEtCity of Little Rock
Office of
Comprehensive
Planning
City Hall
Markham at Broadway
Little Rock, Arkansas 72201
371-4790
Name:sr
File No.
Location:
Type of Issue
Arkansas Power & Light Company
L-Arkansas Louisiana Gas Company
Southwestern Bell Telephone Company
Little Rock Municipal Water Works
Little Rock Wastewater Utility System
County Planning
Little Rock Fire Department
Re: f ��
Gentlemen:
On a'4. / l/ , 19�, the Little Rock Planning
Comm�(lssion will consider the above referenced subject.
A copy of the Issue is enclosed for your consideration, and
your comments and/or recommendations will be greatly
appreciated.
Sincer ly,
Office of Comprehensive Planning
(Please res .o'Hd below, and return this letter for our
records.)
Approved as submitted
Easements required (see attached plat or
description below)
Comments:
By:
Enclosure
cc: Engineering Division
ARKL.A
0^93nn
EASEMENT APPROVED
EASEMENT R>~OUMER
DATE--
9Y
EiCity of Little Rock
Office of
Comprehensive
Planning
City Hall
Markham at Broadway
Little Rock, Arkansas 72201
371-4790
ame : #Ilal-a
ile No,
ocation:
ype of Issue
Arkansas Power & Light Company
Arkansas Louisiana Gas Company
Southwestern Bell Telephone Company
Little Rock Municipal Water Works
Little Rock Wastewater Utility System
ounty Planning
ittle Rock Fire Department
Re: r Glii ' ` t
Gentlemen: /)
On 19e6E, the Little Rock Planning
Co ssion will consider the above referenced subject.
A copy of the Issue is enclosed for your consideration, and
your comments and/or recommendations will be greatly
appreciated.
Sincer ly_,
i QQ
Office of Comprehensive Planning
(Please respond below, and return this letter for our
records.)
Approved as submitted
Easements required (see attached plat or
description below) ]
Comments
By:
Enclosure
cc: Engineering Division
rAffle
SUBDIVISION
DATE
ITEM NO. FILE NO.
NAME:LOCATION:
DEVELOPER
DEVELOPER
NAME:
STREET ADDRESS��._
CITY/STATE/ZIP
TELEPHONE NO.
ENGINEER %via p V
e —
AREA %r: i.�lc�_ NUMBER OF LOTS / FT. NEW STREET d
ZONING �� r/V- PROPOSED USES
PLANNING DISTRICT ZiLl L€;Z LAC2)
CENSUS TRACT 22- 0�5,
VARIANCES REQUESTED:
2.)
3.)
4.)
duchscherer oherst design, p.c.
ENGINEERS v ARCHITECTS ■ PLANNERS
9390 RESEARCH BLVD., SUITE 210, AUSTIN, TEXAS 78759 ■ (512) 343-1525
May 1, 1986
Ms. Bernadette Bettard
City of Little Rock
Office of Comprehensive Planning
City Hall
Markham and Broadway
Little Rock, Arkansas 72201
RE: Site Plan Submittal
Highland Ridge Apartments
Little Rock, A-i4kansas
Dear Ms. Bettard:
Co -Chairmen:
Philip E. Duchscherer, P.E.
Alvin J. Oberst, P.E.
President.
David C. Duchscherer, P.E.
Vice Presidents:
Herbert G. Smith, R.A.
Ronald K. Wiese, P.E.
Floyd H. Caldwell, R.A.
Michael C. Terranova, R.A.
Administrative Manager
Thomas W. Smith
Please find attached 15 sets of drawings for the Site Plan Approval for the
above project. Included in this set are:
Sheet C-1 Dimensioned Site Plan
Sheet C-2 Project Data
Sheet C-3 Landscape Plan
Sheet C-4 Water and Wastewater Utility Plan
Sheet C-5 Drainage Plan (Preliminary)
This project includes 220 apartment units within an 18.217 acre site which
is zoned MF-12. Other features include a clubhouse, pool, laundry, mailroom
and maintenance buildings. A total of 330 full-size parking spaces are
provided, including 13 handicap spaces.
The project owner is Prewitt Construction Co., Inc., Austin, Texas. I will
serve as your point of contact with this office. Should you require additional
data, please advise me. Thank you for your consideration.
Sincerely,
Duchscherer Oberst Design, P.C.
Vernon L. Dunigan
Manager
VLD /rs s
2320 ELMWOOD AVENUE 235 EAST JERICHO TURNPIKE
BUFFALO, NEW YORK 14217 MINEOLA, NEW YORK 11501
(716) 873-9334 (516) 747-0525
i t
City of Little Rock
ffice of City Hail
Comprehensive Markham at Broadway
Planning Little Rock, Arkansas 72201
371-4790
Arkansas Power & Light Company
Arkansas Louisiana Gas Company
southwestern Bell Telephone Company
Little Rock Municipal Water Works
Little Rock Wastewater Utility System
County Planning
Little Rock Fire Department f %�
Re
ame: A
f
ile No.
ocation:
e of Issue,
Gentlemen:
". �ninn
r
MA`i' - 0 i 9 8 6
Ong �, 19�, the Little Rock Planning
Co ssion will consider the above referenced subject.
A copy of the Issue is enclosed for your consideration, and
your comments and/or recommendations will be greatly
appreciated.
Sincer ly,
MAY 23 1196
1
Office of Comprehensive Planning
(Please respond below, and return this letter for our
records.)
Approved as submitted
Easements required (see attached plat or
description below)
Comments:
By: —
Enclosure
cc: Engineering Division