HomeMy WebLinkAboutS-0671 Staff Analysis?p1�
,v
June 10, 1986
SUBDIVISIONS
Item No. 14
NAME: Highland Ridge Apartments
LOCATION: South Side of Mara Lynn Road -
Across from Napa Valley Apts.
DEVELOPER:
Prewitt Constr. Co., Inc.
9390 Research #200
Austin, TX 78759
Phone: 512-346-1000
RMnTAiF VD —
Veron Vunagin
Duchscherer Oberst Design
9390 Research #210
Austin, TX 78759
Phone: 512-343-1525
AREA: 18.217 acres NO. OF LOTS: 1 FEET NEW ST.: 0
ZONING: "MF-12"
PROPOSED USE: Multifamily Apartments
PLANNING DISTRICT: Pleasant Valley #2
CENSUS TRACT: 22.05
VARIANCES REQUESTED: 13' height variance to be filed with
Board o Adjustment.
1. The construction of 220 apartment units on 18.217
acres.
2. Development Proposal
a. Average unit size .............737.27 square feet
b. Density ........................12 units per acre
June 10, 1986
1 SUBDIVISIONS
Item No. 14 - Continued
C. Impervious cover -
Apartments .......... ..... 62,698 square feet
Clubhouse ........... ...... 3,508 square feet
Mailroom ..............9.....442 square feet
Maint. equipment storage. .... 180 square feet
Pool maintenance storage......80 square feet
Total building .... ....... 68,260 square feet
Parking ... ...... ........160,862 square feet
Total coverage ..... ..... 242,562 square feet
Gross building area .....167,762 square feet
Actual parking - 338 cars
d. Unit tabulation
Unit Ty a Number
1 bedroom 132
2 bedroom 88
Total
3. Analysis
220
The proposed site has some extremely steep topography.
The floodway should be dedicated, and the old part of
Mara Lynn, just north of this property, closed. Staff
asks that Fire Department approval be obtained for the
eastern drive. Street grades should be shown. A
detailed cross section of the drive construction should
be submitted. Fire has requested turnaround space for
the driveway next to buildings B1 and Al.
4. Staff Recommendation
Approval, subject to comments made.
June 10, 1986
SUBDIVISIONS
Item No. 14 - Continued
SUBDIVISION COMMITTEE REVIEW:
The item was reviewed, and the applicant was asked to:
(1) get approval from the Traffic Engineer and Fire
Department; and (2) petition to close Mara Lynn.
Water Works Comments - On -site fire protection required.
Should revise dire hydrant layout submitted to developer.
Sewer Comments - Sewer available. Cap. Cont. analysis
required.
PLANNING COMMISSION ACTION:
The applicant was present. There were no objectors. A
motion for approval was made and passed by a vote of 10
ayes, 0 noes and 1 absent.
�J
June 10, 1986
SUBDIVISIONS
Item No. 14
NAME: Highland Ridge Apartments
LOCATION: South Side of Mara Lynn Road -
Across from Napa Valley Apts.
DEVELOPER:
Prewitt Constr. Co., Inc.
9390 Research #200
Austin, TX 78759
Phone: 512-346-1000
ENGINEER:
Veron Vunagin
Duchscherer Oberst Design
9390 Research #210
Austin, TX 78759
Phone: 512-343-1525
AREA: 18.217 acres NO. OF LOTS: 1 FEET NEW ST.: 0
ZONING: "MF-12"
PROPOSED USE: Multifamily Apartments
PLANNING DISTRICT: Pleasant Valley #2
CENSUS TRACT: 22.05
VARIANCES REQUESTED: 13' height variance to be filed with
Board of Adjustment.
1. The construction of 220 apartment units on 18.217
acres.
2. Development Proposal
a. Average unit size .............737.27 square feet
b. Density ........................12 units per acre
it;E
June 10, 1986
i- SUBDIVISIONS
Item No. 14 - Continued
c. Impervious cover -
Apartments ...............62,698 square feet
Clubhouse ......... ........ 3,508 square feet
Mailroom .:..................442 square feet
Maint. equipment storage.....180 square feet
Pool maintenance storage ...... 80 square feet
Total building .... ....... 68,260 square feet
Parking .................160,862 square feet
Total coverage ..........242,562 square feet
Gross building area .....167,762 square feet
Actual parking - 338 cars
d. Unit tabulation
Unit Type Number
1 bedroom 132
2 bedroom 88
Total 220
3. Analysis
The proposed site has some extremely steep topography.
The floodway should be dedicated, and the old part of
Mara Lynn, just north of this property, closed. Staff
asks that Fire Department approval be obtained for the
eastern drive. Street grades should be shown. A
detailed cross section of the drive construction should
be submitted. Fire has requested turnaround space for
the driveway next to buildings Bl and Al.
4. Staff Recommendation
Approval, subject to comments made.
June 10, 1986
SUBDIVISIONS
Item No. 14 - Continued
SUBDIVISION COMMITTEE REVIEW:
The item was reviewed, and the applicant was asked to:
(1) get approval from the Traffic Engineer and Fire
Department; and (2) petition to close Mara Lynn.
Water Works Comments - On -site fire protection required.
Should revise fire hydrant layout submitted to developer.
Sewer Comments - Sewer available. Cap. Cont. analysis
required.
PLANNING COMMISSION ACTION:
The applicant was present. There were no objectors. A
motion for approval was made and passed by a vote of 10
ayes, 0 noes and 1 absent.
QJ-