Loading...
HomeMy WebLinkAboutS-0671 Staff Analysis?p1� ,v June 10, 1986 SUBDIVISIONS Item No. 14 NAME: Highland Ridge Apartments LOCATION: South Side of Mara Lynn Road - Across from Napa Valley Apts. DEVELOPER: Prewitt Constr. Co., Inc. 9390 Research #200 Austin, TX 78759 Phone: 512-346-1000 RMnTAiF VD — Veron Vunagin Duchscherer Oberst Design 9390 Research #210 Austin, TX 78759 Phone: 512-343-1525 AREA: 18.217 acres NO. OF LOTS: 1 FEET NEW ST.: 0 ZONING: "MF-12" PROPOSED USE: Multifamily Apartments PLANNING DISTRICT: Pleasant Valley #2 CENSUS TRACT: 22.05 VARIANCES REQUESTED: 13' height variance to be filed with Board o Adjustment. 1. The construction of 220 apartment units on 18.217 acres. 2. Development Proposal a. Average unit size .............737.27 square feet b. Density ........................12 units per acre June 10, 1986 1 SUBDIVISIONS Item No. 14 - Continued C. Impervious cover - Apartments .......... ..... 62,698 square feet Clubhouse ........... ...... 3,508 square feet Mailroom ..............9.....442 square feet Maint. equipment storage. .... 180 square feet Pool maintenance storage......80 square feet Total building .... ....... 68,260 square feet Parking ... ...... ........160,862 square feet Total coverage ..... ..... 242,562 square feet Gross building area .....167,762 square feet Actual parking - 338 cars d. Unit tabulation Unit Ty a Number 1 bedroom 132 2 bedroom 88 Total 3. Analysis 220 The proposed site has some extremely steep topography. The floodway should be dedicated, and the old part of Mara Lynn, just north of this property, closed. Staff asks that Fire Department approval be obtained for the eastern drive. Street grades should be shown. A detailed cross section of the drive construction should be submitted. Fire has requested turnaround space for the driveway next to buildings B1 and Al. 4. Staff Recommendation Approval, subject to comments made. June 10, 1986 SUBDIVISIONS Item No. 14 - Continued SUBDIVISION COMMITTEE REVIEW: The item was reviewed, and the applicant was asked to: (1) get approval from the Traffic Engineer and Fire Department; and (2) petition to close Mara Lynn. Water Works Comments - On -site fire protection required. Should revise dire hydrant layout submitted to developer. Sewer Comments - Sewer available. Cap. Cont. analysis required. PLANNING COMMISSION ACTION: The applicant was present. There were no objectors. A motion for approval was made and passed by a vote of 10 ayes, 0 noes and 1 absent. �J June 10, 1986 SUBDIVISIONS Item No. 14 NAME: Highland Ridge Apartments LOCATION: South Side of Mara Lynn Road - Across from Napa Valley Apts. DEVELOPER: Prewitt Constr. Co., Inc. 9390 Research #200 Austin, TX 78759 Phone: 512-346-1000 ENGINEER: Veron Vunagin Duchscherer Oberst Design 9390 Research #210 Austin, TX 78759 Phone: 512-343-1525 AREA: 18.217 acres NO. OF LOTS: 1 FEET NEW ST.: 0 ZONING: "MF-12" PROPOSED USE: Multifamily Apartments PLANNING DISTRICT: Pleasant Valley #2 CENSUS TRACT: 22.05 VARIANCES REQUESTED: 13' height variance to be filed with Board of Adjustment. 1. The construction of 220 apartment units on 18.217 acres. 2. Development Proposal a. Average unit size .............737.27 square feet b. Density ........................12 units per acre it;E June 10, 1986 i- SUBDIVISIONS Item No. 14 - Continued c. Impervious cover - Apartments ...............62,698 square feet Clubhouse ......... ........ 3,508 square feet Mailroom .:..................442 square feet Maint. equipment storage.....180 square feet Pool maintenance storage ...... 80 square feet Total building .... ....... 68,260 square feet Parking .................160,862 square feet Total coverage ..........242,562 square feet Gross building area .....167,762 square feet Actual parking - 338 cars d. Unit tabulation Unit Type Number 1 bedroom 132 2 bedroom 88 Total 220 3. Analysis The proposed site has some extremely steep topography. The floodway should be dedicated, and the old part of Mara Lynn, just north of this property, closed. Staff asks that Fire Department approval be obtained for the eastern drive. Street grades should be shown. A detailed cross section of the drive construction should be submitted. Fire has requested turnaround space for the driveway next to buildings Bl and Al. 4. Staff Recommendation Approval, subject to comments made. June 10, 1986 SUBDIVISIONS Item No. 14 - Continued SUBDIVISION COMMITTEE REVIEW: The item was reviewed, and the applicant was asked to: (1) get approval from the Traffic Engineer and Fire Department; and (2) petition to close Mara Lynn. Water Works Comments - On -site fire protection required. Should revise fire hydrant layout submitted to developer. Sewer Comments - Sewer available. Cap. Cont. analysis required. PLANNING COMMISSION ACTION: The applicant was present. There were no objectors. A motion for approval was made and passed by a vote of 10 ayes, 0 noes and 1 absent. QJ-