Loading...
HomeMy WebLinkAboutS-0440-B Map 8. 1 YI , 1/4" REBAR FOUND 1/2" REBAR FOUND ' I/4"REBA S -- -104.- 48- --- FOUND LOT 46 • • •y •• SEEN ONESlossSPIN 0010 OF ARKANSAS STATE HIGHWAY NO. 10 (UNDER CONSTRUCTION) S80015'2681 REBAR SET C9' f 61 E i L0 OC L0 cfl L0 R/W MARKER FOUND N 860 2014211 E 109.80 r 9.5 8025.4 SURVEYOR'S CERTIFICATION The undersigned, B. Michael Watson, does hereby certify on this 12th day of April, 989 as fo owe: 1. This survey was made on the ground in accordance with the field notes shown hereon and correctly shows: a. The boundaries and areas of the subject property and the size, location and type of buildings and improvements thereon and the distance therefrom to the nearest facing exterior property lines of the subject property; b. The location of all rights -of -way, easements, restrictions and any other matters of record of which I have knowledge of or have been advised, whether or not of record, affecting the subject property; C. All abutting dedicated public streets or highwz:-;s providing access to the subject property together with the width and name thereof; and d. All other significant items on the subject property; 2. Except as shown on the survey, there are no: a. Encroachments upon the subject property by improvements on adjacent property; b. Encroachments on adjacent property, streets or alleys by any improvements on the subject property; C. Party walls; or d. Conflicts or protrusions; 3. Adequate ingress to and egress from the subject property as provided by Arkansas Hi hwa No. 10 and Taylor Loop Road, both o w c are pave dedicated public rig is -of -way; 4. R-2 zoning set -back lines are not shown on the subject property hereon; and 5. The subject property is not located within any "Flood Hazard Area" as defined by the Federal Insurance Administration pursuant to the Federal Flood Disaster Protection Act of 1973, as amended, and any portion of the subject property located within a "Flood Plain Area" as also so defined is located as shown hereon. ----s- B. Michael Watson Registered Land Surveyor 4957 State of Arkansas 55 0 ZONING DESCRIPTION Part of the Northeast 1/4 of the Northwest 1/4 of Section 19, T-2-N, R-13-W, Pulaski County, Arkansas, being more particularly described as follows: Starting at the Southeast corner of the Northeast 1/4 of the Northwest 1/4 of said Section 19; thence North 89019'04" West along the South line of said Northeast 1/4 Northwest 1/4 a distance of 303.14 feet to the POINT OF BEGINNING; thence continuing along said South line South 89019'04" West 398.33 feet; thence North 00'40'56" West 585.17 feet to a Point lying on the South right-of-way line of Arkansas State Highway No. 10; thence along said South ri ht-of-way line the following three (3) courses and distances: I� South 80'15'26" East 91.19 feet; 2) North 86020'42" East 109.80 feet; and 3) North 79'08'36" East 208.29 feet; thence South 00'07'00" East 142.10 feet; thence North 89'06'08" East 253.86 feet to the West right-of-way line of Taylor Loop Road, thence along said West right-of-way South 00027'22" West 89.55 feet; thence South 89'13'36" West 252.96 feet; thence South 00°07'00" East 380.11 feet to the POINT OF BEGINNING, containing 5.893 acres, more or less. 1 0 291 -REBAR SET( I/2' BAR FOUND 172' NORTH 8-.7'EAST Z�B�•� AND 1,12 REBAR FOUND If. 1 SOUTH 8 600 ° �1 3611E 0.1, WEST OF LINE) Nag 0 REBAR SET LLJ •g- -ONE STORY FRAME O RETAIL SHOP ON 0 -- O 1/2" OPEN PIPE �. N 890 06'0811 E 253.86' FOUND 73. 7B' ONE STORY ROCK "- & FRAME HOUSE -VACANT ONE STORY FRAME BUILDING BLDG. CORNER 2.3' NORTH OF PROP LINE-7 REBAR SET j 1114 BLDG. CORNER 0.6' SOUTH Is PROPERTY LINE I 10.4' 20t o SHED EAST OF PROPERTY LINE 01 5.893 ACRES ± 0 0 Z REBAR 1/4" REBAR REBAR SET 1" OPEN PIPE OS SOUTHOFF L!N E� " HED 09' 2"REBAR FOUND 1/2" REBAR .'N REBAR FOUND 1.5 EAST OF LINE of o IM REBAR FOUND 0.9' EAST OF LINE x LLJ D _ -0O � v.0 T 0'• O O O z z O z U) -REBAR FOUND 0.1' W WEST OF LINE U 2 W 11 = p Ns J 0i O • FOUND 0.1 (V2 PING FOUND . 1/ NORTH OF PIPE FOUND NORTH OF REBAR SET f-0.2' NORTH OF PROP LNE FOUND \ 15.69' P LINE CROP. LINE 1.56 NORTH) 058 91' �O C .79' Y_ EASEMENT' 125.11'- - - -- s 89° MBAR SET-- -- 180-03' --- - - -- - 398 9 5I 6B.zl_- �-- �� 33'-- - -- -_ S 89016 57° W- REBAR SET 1/4 REBAR 116.0 I FOUND L OT 44 LOT 27 LOT 26 LOT 25 LOT 24 I LOT 23 j W E S T C Q O Cr CL O O J cr 0 48.6 i N > rr7 ,> o PROPOSED (N BARN zB.7' R/W LINE I M 1 in 21.5' •. U) % 2OP 2 2' 49. fi 72.5' S 89013'36;1W 26.0' 252.96 BLOCK PROPOSED R/W BUILDING DEDICATION - REBAR SET 1/4" BAR FOUND (3/ITREBAR FOUND 1.72' NORTH OF LINE 1.9' NORTH) 2 6 0. 86' 303.14' ONII _- _- I „ FOUND AD SI -"POINT OF BEGINNING LOT 22 LOT I RAILROAD SPIKE FOUND RAILROAD SPIKE FOUND 1___�(3.66' TO CENTERLINE OF TAYLOR LOOP ROAD) i NAIL a BOTTLE CAP FOUND RAILROAD SPIKE FOUND COTTON SPINDLE SET (4.68' TO CENTERLINE OF TAYLOR LOOP ROAD) NAIL 5 BOTTLE CAP FOUND BASIS OF BEARINGS: NORTH LINE OF WESTCHESTER SUBDIVISION PHASE I, II -A a IV. S. E. CORNER OF N. E. 1/41 N. W 1/4, SECTION 19, T-2-N, R-13 -W -O• N:9N ^ pilylEl.�!P'�;' ,h L 0'0 meninurger Tanner Robinson &Associates Architects -Engineers 201 Sorbs trard PO. Bor 3837 L1uk Rook AR 72M 3837 501137553.11 COPYRIGHT 19 Mahlburger Tanner Robinson 8 Assoclalss DRAWN •Y: dg - sdn I CNECKEO •Y: I ANIIOVEO SY: •CALL; 111 = 501 DATE: MAY 15, 1989 LLJ 2 CL U) O Lti <( LLJ Y Q � W a a Z LLJ O 0 LLI O Q t CL C] J < O 0 z U_ Z ' r 0 N •`I LLJ > = LL'^ W V/ C P%"CT No. 288-290 M ,_,Two - E _S T E R U B D I V I S1_ 0 N