Loading...
HomeMy WebLinkAboutS-0433 Staff AnalysisAugust 16, 1983 SUBDIVISIONS Item No. 5 NAME: Fliteline Motors LOCATION: 5111 Asher T"T71- r r%r%V D . CT1PX7VVr)P Harold Barker William F. Davis, Jr. 8601 Chickamauga Ct. P.O. Box 6031 Mabelvale, AR 72103 Sherwood, AR 72116 Phone: 455-2726 (work) Phone: 835-3550 565-7525 (home) AREA: 1.21 acres NO. OF LOTS: 1 ZONING: "I-2"/"C-3" PROPOSED USES: Industrial A. History of the Site None. FT. OF NEW ST.: 0 PROPOSAL: 1. The constructionof a metal building on a multiple building site of 1.21 acres. 2. The building is to be 50' x 60' long. PTr•/1TTT TfTAT1T T1 L1 �f LL7T Cam. 1. Front yard setback of at least 50 feet. 2. 'Side yard setbackof at least 15 feet. 3. Rear yard setback of at least 25 feet. 4. Lot area of at least 14,000 square feet. ENGINEERING CONSIDERATIONS: A. Dedicate right-of-way necessary for an arterial. Ten feet of right-of-way required from centerline of street. B. Improve Asher Avenue to include curb and gutter, standard driveways, and underground drainage if s required. Widen Asher to place back of curb and gutter F to provide a 40-foot arterial street. Engineering s plans to be submitted to the City Engineer for review. August 16, 1983 SUBDIVISIONS Item No. 5 - Continued STAFF ANALYSIS: Staff was inhibited in its review of the plans since the dimensions were not clearly indicated. The applicant should submit a properly dimensioned plan or clarify the numbers shown. It is suggested that a final plat be submitted to plat a building line, which will accommodate the existing buildings on -site in -lieu of what is required, since 10 feet of the property will be dedicated for right-of-way. The applicant should submit assurances that the existing metal building will be removed upon construction of the proposed building; especially since it seems to encroach in the required setback area. Staff is requesting the submission of a proper landscaping and parking plan, along with the floor areas of existing buildings. STAFF RECOMMENDATION: Approval, subject to comments made. SUBDIVISION COMMITTEE REVIEW: The applicant was present. He stated that his plans did not include removal of the metal building. He was instructed to meet with the Engineering Department before the August 16th Planning Commission meeting to work on compliance with their comments and an acceptable landscaping/parking plan. PLANNING COMMISSION ACTION: The applicant was not present. Staff reported that he had requested withdrawal of the application. A motion was made and passed for a withdrawal. The vote: 9 ayes, 0 noes and 2 absent. Z SCOPE OF WORK CONSTRUCTION OF SHOP BUILDING FOR FLITELINE MOTORS 5111 ASHER AVENUE LITTLE ROCK, ARKANSAS GENERAL CONDITIONS: Provide construction supervision, plans and specifications required to obtain a building permit, Building permit fee, sales tax, and cost of builder's risk insurance. CONCRETE WORK: Provide necessary tools, labor, and equipment to remove existing concrete at column locations to pour required footings to support the building structure and a 411 reinforced concrete slab poured over the existing slab. Reinforcing steel will be installed at each rigid frame from pier to pier, across the width of the building to tie the new piers to resist horizontal reactions at the column bases. A slope will be provided at the overhead doors from the existing concrete drive elevation to the new finish floor elevation 4" above the existing concrete. A floor sealer/hardener will be applied after the new concrete slab has curred for moisture and dust control. -,j e by 60' long alume secured ming system with 26 gauge or to be selected ,ick vinyl faced ner will be -otect the -d at both eaves. Page 2 SCOPE OF WORK: BUILDING STRUCTURE Conti-nuie:d: The following accessory items will be installed: 1. Two (2) 3070 personnel doors with standard hardware. 2. Four (4) 121x12' 24-gauge steel overhead doors. 3. Two (2) 9" throat by 10' long continuous ridge ventilators. INTERIOR CONSTRUCTION: The 10x10 tool room and 5x5 restroom will be constructed with 2x4 wood frame walls and a 1/2" painted plywood interior finish with metal liner around the exterior to match the liner in the shop area. Ceiling will be framed with 2x6 wood joists with a 3/4" plywood deck and 1/2" painted plywood ceiling. Doors into the tool room and restroom will be 1 3/8" thick hollow core wood doors with standard hardware painted to match the wails. ELECTRICAL: Electrical work will consist of providing: 1. Fluorescent lighting in the shop area and tool room. 2. Incandescent light fixture in the restroom with a ventilation fan. 3. 120 volt convenience outlets located around the perimeter of -the shop wall as required by the City of Little Rock Building Code. 4. Two (2) 220-volt single phase outlets for equipment to be furnished by the owner. 5. Unit heater connections. 6. Electrical panel and required service in accordance with the National Electric Code and City of Little Rock requirements. PAge 3 SCOPE OF WORK: PLUMBING: Provide one (1) commode and wall hung lavatory in the restroom; one (1) interior hose bib and one (1)_ exterior frost proof hose bib; one (1) 6-gallon electric hot water heater; two (21 10.0.,000 BTU suspended unit heaters in the shop area. Gas, water, and sewer service tied into the existing services, including the necessary city tap fees and permits.