HomeMy WebLinkAboutS-0433 MapO NOIIVA313
- Rib � �E�t
i" /O'�oK5
I F�.
i I
)=➢��ST �rlC� BLo�k 1�jV1L�lrlCa
E ELEVATION A
I. Show braced bays, portal frames, etc. and locate all roof and
wall accessories.
2. Define all open wall areas (open for glass, masonry, to remain
open, etc.) and note if rod bracing may be used at sidewall
bays.
3. Show necessary sections through open or partially open wall
areas, and indicate materials required of STAR.
4. For buildings that tie to existing structures, show complete de-
tails regarding common wall conditions, and consequential ma-
terials required of STAR, and note if rod bracing may be
used at common walls.
5. For building orders resulting from special quotations utilizing
crane or monorail systems, attach complete crane information
sheet form E-105 or E-106 or both if applicable.
6. Sketch sheet form S-212-Revision 6 or S-212-A must accom-
pany all purchase orders, and may also be used to supplement
quotation request and confirmation form E-103-Revision 4.
7. All purchase orders, and special quotation inquiries are
subject to STAR interpretation. Consequently all dealer
copies of some, and other relative order documents should
6 J w
Q d �
rJ
Pr w
a- a zd
a)� d w °Qwit
}
I
t
CpLoc� IY\ETh� �A t��c-L3
be viewed by dealer as a check to insure maximum commun-
ication clarity.
8. Any materials shown on sketch and not required of STAR
should be noted "Not by STAR"
9. Form S-212-Revision 6 should be used for small, simple build-
ings and form S-212-A should be used for large buildings or
building complexes.
10. All sales order or special quotation inquiry documents must
be done in pencil.
BUILDING SKETCH SHEET
STAR MANUFACTURING CO.
DEALER CJ E Mr 2-
L"
OWNER I��Fn� L�..i ��o�5
CITY r ► + �^ STATE A p"y
P 0. NO. DATE �—
LAYOUT APPROVED, PROCEED WITH FABRICATION
DATE
APP. BY.
Form S-212- Revision 6