Loading...
HomeMy WebLinkAboutS-0433 MapO NOIIVA313 - Rib � �E�t i" /O'�oK5 I F�. i I )=➢��ST �rlC� BLo�k 1�jV1L�lrlCa E ELEVATION A I. Show braced bays, portal frames, etc. and locate all roof and wall accessories. 2. Define all open wall areas (open for glass, masonry, to remain open, etc.) and note if rod bracing may be used at sidewall bays. 3. Show necessary sections through open or partially open wall areas, and indicate materials required of STAR. 4. For buildings that tie to existing structures, show complete de- tails regarding common wall conditions, and consequential ma- terials required of STAR, and note if rod bracing may be used at common walls. 5. For building orders resulting from special quotations utilizing crane or monorail systems, attach complete crane information sheet form E-105 or E-106 or both if applicable. 6. Sketch sheet form S-212-Revision 6 or S-212-A must accom- pany all purchase orders, and may also be used to supplement quotation request and confirmation form E-103-Revision 4. 7. All purchase orders, and special quotation inquiries are subject to STAR interpretation. Consequently all dealer copies of some, and other relative order documents should 6 J w Q d � rJ Pr w a- a zd a)� d w °Qwit } I t CpLoc� IY\ETh� �A t��c-L3 be viewed by dealer as a check to insure maximum commun- ication clarity. 8. Any materials shown on sketch and not required of STAR should be noted "Not by STAR" 9. Form S-212-Revision 6 should be used for small, simple build- ings and form S-212-A should be used for large buildings or building complexes. 10. All sales order or special quotation inquiry documents must be done in pencil. BUILDING SKETCH SHEET STAR MANUFACTURING CO. DEALER CJ E Mr 2- L" OWNER I��Fn� L�..i ��o�5 CITY r ► + �^ STATE A p"y P 0. NO. DATE �— LAYOUT APPROVED, PROCEED WITH FABRICATION DATE APP. BY. Form S-212- Revision 6