Loading...
HomeMy WebLinkAboutS-0427 Map 4J H =I U QIN 1�uIQ L F nM x7) w le '.N t i �.Fi. L "g� 2 WI 4 i ��. FL 301.44 Li`:. C4, —FE.S. CON WIDE APRON EMENTy 10' WIDE \ B.49 /? TO BE REMOVED w/R007S- FILL HOLE w/ SELECT MATERIAL COMPACT 95% MOD. PROCTOR DENSITY 310 � �m TO BE REMOVED TREE TO BE REMOVED —w/ ROOTS -FILL HOLE w/ SELECT MATERIAL, COMPACT TO 95% MOD. PROCTOR DENSITY h LEGEND CURBaGUTTER TURN DOWN WALK — —314-- EXISTING CONTOUR 314 — FINISHED CONTOUR + 304 FINISHED SPOT ELEVATION F.E.S. FLARED END SECTION T i EXIST. PAVEMENT TO BE / DEMOLISHED, APPLY TOP SOIL, SEED Q FERTILIZE f{F - 9 AREA TO BE TOP SOILED, SEEDED 8k FERTILIZED i SOLID SOD d H eecl Ul'm e n s IIo n _�rn rn � r l ve i� mt GENERAL NOTES C2r)aPI +(,D 1P rnp I i ►'1 e 1. The approximate location of known subsurface structures and utilities (i.e. water, gas, power, phone, etc.) are shown on the Plans for �rnpra ve rv1en+ information only. The Contractor shall be responsible for obtaining information and satisfying himself as to the actual location of these and -P ropo Sal -For M-8 6le-va I e all other subsurface items prior to beginning construction. All repairs or relocations necessary shall be made as required by the owner of the j� IC� utility or structure. The cost of such repairs or relocations necessary shall be borne by the Contractor. 3 2. All streets, drives, walks, drainage structures, fences, utilities, etc. that are disturbed during construction shall be restored to their original or better condition using like materials. Cost of such repairs shall be borne by the Contractor unless provision for payment '_made in the Proposal. �/ 1'[C/,1,�Cj(�// � •` _ APR 10 09 J dp= w' ,�i'�2 •� PULASKI BANK & TRUST CO. �.surd SITE PLAN i y..,�...._.m....,.,..�.�.s� ,,.,........_..... w _ 7kF iT'3yt ' gllpl-"1Mt SYY 3I)ATF q1*<z_.T W11 /L.LD > AP RIL 1989