Loading...
HomeMy WebLinkAboutS-0418 Staff AnalysisSeptember 11, 1984 SUBDIVISIONS Item No. 6 NAME: Westgate Addition LOCATION: Southeast Corner of Cantrell and Bryant T1 L+[7DT nnV D. ENGINEER: Weingarten Realty, Inc. Edward G. Smith and Associates 2600 Citadel Plaza Dr. 401 Victory P.O. Box 94133 Little Rock, AR 72201 Houston, TX 77016 Phone: (501) 374-1666 AREA: 4.73 acres NO. OF LOTS: 1 FT. OF NEW ST.: 0 ZONING: "C-3" PROPOSED USES: Commercial VARIANCES REQUESTED: Building line on Cantrell near Bryant A. Site History None. B. Proposal 1. The construction of a Taco Bell restaurant in a commercial shopping center of 4.73 acres. 2. To allow a 15' setback from Cantrell, instead of the usually required 25'. 3. Construction of 11 additional parking spaces. C. Engineering Comments 1. Request modification to driveway on Bryant Street to line up with parking lane. Discuss with Traffic Engineering at 371-4858. 2. Construct smooth transition along Cantrell Road at eastern driveway. September 11, 1984 SUBDIVISIONS Item No. 6 - Continued D. Analysis Staff has several concerns regarding the submission. First of all, it was submitted in preliminary plat form. A proper site plan with the required dimensions should be submitted. The name should be changed so as to prevent conflict with our subdivisions in the City. The applicant has requested a 15' setback from Cantrell., The usual policy has discouraged the granting of bulk and area waivers and the review of site plans. Staff would like to remain consistent to this established practice. The applicant should consider moving the curb cut from Bryant southward, thereby allowing him to safely shift the proposed building 10' so as not to interfere with vehicles turning from Bryant. Staff also was inhibited in its review of the item due to the applicant's failure to submit a comprehensive and detailed analysis of the entire site. The existing/proposed size of the buildings and parking must be submitted. STAFF RECOMMENDATION: Approval, subject to resolution of the issues. SUBDIVISION COMMITTEE REVIEW: The applicant agreed to work with Engineering to move the curb southward and provide a 25' setback, provide the ad8itional information needed, and change the name of the plat. Waterworks reported an easement crossing the property on the corner. PLANNING COMMISSION ACTION: The applicant submitted a revised plan that was approved by Engineering. A motion to approve the plan as revised was made and passed by a vote of: 10 ayes, 0 noes, 0 absent and 1 abstention.