Loading...
HomeMy WebLinkAboutS-0414 Staff Analysisr .• March 15, 3.983 SUBDIVISIONS Item No. 1 NAME: Atley Davis Preliminary/Site -- Plan Review LOCATION: Asher and Western Hills DEVELOPER: Atley Davis APPLICANT/AGENT: ENGINEER: Greg Crawford Sam Davis P.O. Box 5512 5301 W. 8th Little Rock, AR 72215 Little Rock, AR Phone: 666-5407 Phone: 664-0324 AREA: 4.9 acres NO. OF LOTS: 1. FT. OF NEW ST.: 0 ZONING: "I-21' PROPOSED USES: Warehouse and Storage REQUEST: Site plan review of a multifamily building site. PROPOSAL: 1. Construction of two warehouse buildings on 4.9 acres. 2. Development according to the following: (a) Existing Shop A - -- - - 8,472 sq. ft. (b) Existing Bldg. B -- - - -- 11,023 sq. ft. (c) Proposed Bldg. C - - -- - 9,000 sq. ft. (d) Proposed Bldg. D - - - - 9,000 sq. ft. 3. The provision of 20 proposed and 28 existing parking spaces. Special Rt uirements_in I-2" Districts 1. There shall be a front yard setback of 50'. See Analysis. 2. There shall be a side yard on each side of the building of 151. This plan complies. 3. There shall be a rear yard of 251. The plan does not comply. March 15, 1983 SUBDIVISIONS Item No. 1 - Continued 4. There shall be a lot area of 14,000 square feet and a width of at least 1001. The plan complies. Engineering Considerations: (1) Dedicate additional right-of-way on Asher Avenue to support Arkansas Highway and Transportation Department (AHTD) plans for improvement on Asher (R-O-W may have been previously dedicated). (2) Make an in lieu contribution for street and drainage improvements on Asher Avenue, consistent with AHTD plans. Amount of contribution to be deterimined by City Engineer in consultation with the developer. (3) Repair or replace damaged curb on Western Hills and construct standard driveway on Western Hills Street. This requirement could be tied to Phase II of the development. Analysis Staff has no major problems with the proposal; however, the site plan should conforin with the "I-2" requirements. A rear yard of 25' should be dedicated. The plat and site plan should include a 50' front yard setback on Western Hills and a 50' setback along Asher since it is a principal arterial. A full 50' setback along Western Hills will not be possible because of the intrusion of an existing building. We concur with Engineering's recommendations for improvements along Asher and Western Hills. Staff Recommendation: Approval, subject to comments made. PLANNING COMMISSION ACTION: The applicant was present. There were no objectors. Since the applicant had not met with Engineering and had not submitted a proper site plan, the Commission felt that the item should be deferred until March 15, 1983. A motion to this effect was made and passed by a vote of 11 ayes, 0 noes, 0 absent. March 15, 1983 SUBDIVISIONS Item No. 1 - Continued SUBDIVISIONCOMMITTEERECOMMENDATION: (3-3-83) The applicant submitted a site plan as requested by the Planning Commission. A motion was made and passed to approve the plan, subject to: (1) An agreement with Engineering regarding in lieu contributions; and (2) The filing of a one -lot final plat for dedication of right -of_ -way. The motion passed by a vote of: 2 ayes, 0 noes, 3 absent. PLANNING COMMISSION ACTION: The applicant was present. Thera_ were no objectors. Engineering reported that their_ suggestion for an in lieu contribution for the widening of Asher based on a formula ❑f $24 per linear foot with curb and gutter, sidewalk and the wideninq of one lane was $5,596. Since he was not planninq to take access off Asher, the applicant Proposed that the contribution be decreased to $2500. The Commission disagreed.. A motion was made and passed for approval, subject to an in lieu contribution of $5,586 and the submission of a one lot Final for dedication of right-of-way. The motion passed b_v a 9-0-2 vote.