Loading...
HomeMy WebLinkAboutS-0392-A Staff AnalysisMarch 12, 1985 SUBDIVISIONS Item No. 7 - File No. 392 NAME: T_nOAMTn*T. DFVFT.nPRR Holiday Inn West Little Rock "Short Form PCD" (Z-4416) Southeast Corner of West Markham and Shackleford FNaTNRFR Robert M. Goff & Wittenberg, Delaney & Associates Davidson, Inc. 1320 Brookwood Drive 840 Savers Federal Bldg. Little Rock, AR 72202 Little Rock, AR 72201 376-6681 AREA: 4.227 acres NO. OF LOTS: 1 FT. NEW STREET: 0 ZONING: "C-2," 110-3," "C-3" to PCD PROPOSED USES: Commercial Hotel A. Site Histo .0 None. B. Development of Objectives (1) To develop a hotel and a park -like setting with landscaped parking lots with a "dramatic view from the interstate as well as from Shackleford." (2) To provide a structure through the use of brick masonry and stucco exteriors that are compatible with adjacent commercial and retail developments. (3) To provide a mixed use commercial development with a hotel on one lot and future commercial developments to be developed on two adjacent tracts owned by the developer. C. Proposal (1) The development of a 208-room, 6-story (maximum of 72' height) hotel on 4.227 acres. (2) Uses will include an 80-seat family restaurant, a 150-seat entertainment lounge, a 314-seat banquet facility and 3-break-out rooms. (3) _Parking will include 230 spaces and 2 truck spaces at the loading dock. March 12, 1985 SUBDIVISIONS Item No. 7 - Continued (4) Access Points: Two on Shackleford with secondary access via access easement to adjacent properties. (5) Perimeter Treatment: Landscaping as buffer or transition zones between the highway and street to the property. (6) The composition of title after development will not change with regard to land ownership. (7) The hillside will be graded down approximately 20' and the area comprisimg Lot 1 will be filled to an elevation of 376' to clear the 100-Year Floodplain. Natural features at the middle of the site consisting of rock outcroppings and trees shall remain on the east side of the property between Lots 1 and 2. (8) Development Schedule: May 1, 1985......... Begin grading and construction May 1, 1986......... Complete construction July 1, 1986........ Holiday Inn West opens for business Adjacent tracts will be developed within five years. D• Engineering Comments Access to and from this site will be extremely difficult during peak traffic hours. The City Engineer requests that a meeting be held to discuss the access in more detail. E. Analvsis The main issue to be discussed involves the amount of — traffic to be generated. The development is proposed in an area that is already heavily impacted by trafffic so this proposal must be viewed very carefully. The applicant's future use of the adjacent tracts as office and a food service establishment must also be considered at this time. All three properties will Share a proposed access easement to Shackleford. The applicant requests acceptance of site plans drawn at 1° = 4011 instead of I,, = 50' as required by ordinance. F. Staff Recommendation Approval, subject to resolution of traffic issue. +r: t 'y March 12, 1985 �SUBDIVISIONS Item No. 7 - Continued SUBDIVISION COMMITTEE REVIEW: The traffic issue was discussed. The applicant was advised to work out the problems with Engineering. Water Works - An on -site fire service will be required. There is an existing 15 inch encasement approximately 630 feet south of the centerline of Markham Street that is available for running the service from a 16 inch main on the west side of Shackleford Road. Acreage and frontage charges will apply. PLANNING COMMISSION ACTION: The applicant was present. There were no objectors. A motion for approval was made and passed by a vote of: 11 ayes, 0 noes and 0 absent.