HomeMy WebLinkAboutS-0375 Staff AnalysisJune 14, 1983
SUBDIVISIONS
Item No. 18
NAME:
LOCATION:
er7tT AT]L+D .
Little Rock School Dist.
Markham & Izard
Little Rock, AR 72201
Phone: 372-6161
Forest Heights Jr. High School
Replat ,
Southeast corner of University
and Evergreen
Edward G. Smith & Associates
401 Victory
Little Rock, AR
Phone: 374-1666
AREA: 24.06 acres NO. OF LOTS: 1
ZONING: 110-2"
PROPOSED USES: Offices
VARIANCES REQUESTED:
None.
A. HISTORY OF THE SITE
None.
B. EXISTING CONDITIONS
FT. OF NEW ST.: 0
The project is located on a large tract which
principle use is a public school. The remainder is
vacant with a variety of greenery.
C. DEVELOPMENT PROPOSAL
This is a proposal to divide a tract of 24.06 acres
into two lots. The new lot will be sold.
D. ENGINEERING CONSIDERATIONS
1. Widen University one lane width adjacent to Lot 1.
2. Dedicate right-of-way on University as required,
adjacent to Lots 1 and 2.
3. Construct sidewalk on University and Evergreen,
adjacent to Lot 1.
June 14, 1983
SUBDIVISIONS
Item No. 18 ® Continued
E. STAFF ANALYSIS
Staff has no objections to the splitting of the tract.
We are supportive of the additional lane to University
full length of the property, especially since a
precedent has been set in the area by a previous office
development. The applicant should file a final plat
with the full dedication. If desired, improvements
adjacent to Lot 1 'may be done initially, with the
remainder to be accomplished with further platting. A
revised preliminary should be submitted with the
appropriate topographical information.
F. STAFF RECOMMENDATION
Approval, subject to comments made.
SUBDIVISION COMMITTEE REVIEW:
The Committee decided to pass this to the Commission,
subject to:
(1) Submission of a revised preliminary with topos on Lot 1
and a waiver for remainder of plat.
(2) Final plat with appropriate dedication.
(3) Staging of improvements to include the widening of
University.
PLANNING COMMISSION ACTION:
The applicant was present. There were no objectors. A
revised showing the topos on Lot 1 was submitted. A motion
was made and passed for approval of the plat subject to
Engineering agreements and a final plat with an appropriate
dedication. The vote 9 ayes, 0 nays and 2 absent.