Loading...
HomeMy WebLinkAboutS-0355 Staff AnalysisFebruary 12, 1985 SUBDIVISIONS Item No. 7 - File No. 355 NAME: LOCATION: DEVELOPER: Whisperwood Apartments P.O. Box 7463 Pine Bluff, AR Whisperwood Addition Baseline Road and Victoria Drive ENGINEER: Mehlburger, Tanner & Associates 201 South Izard Little Rock, AR 72203-3837 375-5331 AREA: 4.125 acres NO. OF LOTS: 2 FT. NEW STREET: 0 ZONING: "R-5" PROPOSED USES: Multifamily A. Site History This site was considered for an "R-5" rezoning to accommodate the existing apartment use on October 30, 1984. The.Commission approved the rezoning. B. Existing Conditions The site in question is flat and currently has six buildings on it that house 94 apartments. C. Development Proposal The applicant is requesting Planing Commission review of this proposal, so that an approved subdivision may be obtained, which would eliminate any problems in rebuilding in the event of a casualty. The applicant proposes to replat the property to consolidate eight lots into two lots and to revise the existing building lines. Formal approval of the following variances will be needed: (1) 25' front setback in Lot 1 along Baseline Road and Victoria Drive. (2) 5' side yard along west line of Lot 1. February 12, 1985 SUBDIVISIONS Item No. 7 - File No. 355 - Continued (3) 25' rear yard setback on Lots 1 and 2. (4) Detach building separation between buildings. (5) Half street improvements to Baseline Road. The setbacks will be varied to comply with the dimensions, as shown on the plat. D. Engineering Comments None. E. Analysis This project was originally built in the 1960's and outside of the City, thus explains its failure to adhere to current regulations. The applicant has worked closely with the staff to develop a resolution to the problem. In effect, a new building line is being created around the perimeter of these buildings. In the case of casualty, the applicant will be allowed to rebuild only in the approved areas. Staff has only one question regarding the failure of the buildings on the west to meet the required 10' separation. The applicant should indicate whether or not the face of the northern building is oriented toward the south. STAFF RECOMMENDATION: Approval, subject to comments made. SUBDIVISION COMMITTEE REVIEW: The applicant was present. He was advised to meet with the Fire Department and Water Works. Water Works - A 6" or 8" on -site fire line is required. An acreage charge of $150 per acre will also apply. 4CLANNING COMMISSION ACTION: A motion for approval was made and passed by a vote of: 9 ayes, 0 noes, 1 absent and 1 abstention.