HomeMy WebLinkAboutS-0336 Staff Analysisr 1'
November 13, 1984
SUBDIVISIONS
Item No. 6
NAME:
LOCATION:
DEVELOPER:
Darragh Company/
Investment Company
1401 East 6th Street
Little Rock, AR 72202
Darragh Commercial Subdivision
South Side of East 6th Street,
Northeast of Missouri -Pacific
Railroad
ENGINEER:
Garver & Garver Engineers
P.O. Box C-50
Little Rock, AR 72203-0050
376-3633
AREA: 8.353 acres NO. OF LOTS: 2 FT. NEW STREET:, 0
ZONING: "I-3"
PROPOSED USES: Commercial
PLANNING DISTRICT: 6
CENSUS TRACT: 3
VARIANCES REQUESTED:
A. Site History
None.
B. Existing Conditions
This plat is located in an area zoned for industrial
use. The site is composed of seven buildings used for
warehouse and industrial use.
C: Development Proposal
This is a proposal to subdivide a tract of 9.95 acres
into lots, so that Lot 2 may be sold for industrial
use. The existing on -site buildings do not conform to
setback requirements, so a variance is needed. Also, a
waiver of improvements on Thomas Street is requested
since the street of marginal use for access. Revision
for maintenance of a joint access easement on the plat
that serves both Lots 1 and 2 will be made in the
Bill of Assurance. There is also an easement on the
east side of the property outside of the subdivision's
boundary that provides access to Lot 2 and to a cafe on
an abutting property. The easement is reflected in the
deed.
November 13, 1984
SUBDIVISIONS
Item No. 6 - Continued
D. Engineering Comments
None.
E. Analysis
Staff realizes that any review of this item must be
accommodating to the existing situation; therefore,
there is no objection to the request for setback
waivers. We are also favorable to the request for a
waiver of street improvements on Thomas. The applicant
should show the platted sanitary sewer easement on the
final plat.
Staff Recommendation
Approval, subject to comments made.
-- Subdivision Committee Review
The Committee discussed the submission. Water Works
requested a 6" or 8" fire service line.
CANNING COMMISSION ACTION: (11-13-84)
The applicant was represented. There were no objectors
present. A brief discussion was held. A motion was made to
approve the plat as recommended by staff, including
Subdivision Committee comment. The motion passed by a vote
of: 10 ayes, 0 noes and 1 absent.