HomeMy WebLinkAboutS-0332 Staff AnalysisOctober 9, 1984
SUBDIVISIONS
S3
Item No. 1
NAME:
Orbit Subdivision (Plan A)
LOCATION: North of I-30 at the Southeast
Intersection of Mabelvale Pike
and North Chicot
DEVELOPER: ENGINEER/APPLICANT:
Jim Hathaway, 372-1700 Mark Wright
Orbit Valve Profit Sharing Mehlburger, Tanner, Renshaw
7500 Interstate Drive P.O. Box 3837
Little Rock, AR 72209 Little Rock, AR 72203-3837
Phone: 372-1700 Phone: 375-5331
AREA: 51.922 acres NO. OF LOTS: 4 FT. OF NEW ST.:
Plan A, 2,000
ZONING:
"R-211,
9'C-4",
"MF-18"
PROPOSED
USES:
Single
Family, Commercial, "MF-18"
PLANNING DISTRICT: 15
CENSUS TRACT: 41.05
VARIANCES REQUESTED: None
A. Site History
A proposal for the rezoning of this site from "MF-18"
and "R-2" to "C-4" and "MF-18" was reviewed by the
Commission on December 13, 1983. It was decided that a
plat would be needed to address street issues, such as
the classification of the Chicot Road, Mabelvale Pike
and a proposed street through the property. The item
was not forwarded to the Board.
B. Existing Conditions
The land involved is basically flat and almost entirely
covered by mature vegetation. It is bordered on the
west by North Chicot, on the north by Mabelvale Pike
and on the south by I-30.
October 9, 1984
SUBDIVISIONS
Item No. 1 - Continued
C. Development Proposal
1. The applicant has submitted a plan for review by
the Commission. He has requested:
a. Approval of future lots to be platted
according to the minimum lot sizes for the
appropriate zoning district.
b. In the event of development of lots which
will be subsequently platted, construction of
the approvements shall be limited to the
frontage on the roads abutting said lots and
shall not be required until the lot is
actually improved.
2. It proposes a collector street which begins at the
norteast corner and forms an arc through the
property to a point where it would connect with
the westward extension of Mabelvale Pike from
North Chicot Road. Both the proposed collector
and that portion of the eastern side of North
Chicot Road, between the I-30 access road and the
point at which the new collector would intersect
North Chicot Road, will be improved to collector
standards.
Improvements to the rest of the eastern side of
North Chicot Road, and that portion of Mabelvale
Pike running along the entire northern boundary of
the subject property, would only include widening
the road and reshaping the curvature in each ditch
but not the provision of curb/gutter or other
boundary improvements associated with a collector
street.
D. Engineering Considerations (Plan A)
1. Dedicate right-of-way and improve North Chicot
Road from I-30 to New Mabelvale Pike to collector
standards.
2. Dedicate right-of-way and improve North Chicot
Road from New Mabelvale Pike north to east leg of
Mabelvale Pike to residential street standards.
October 9, 1984
SUBDIVISIONS
Item No. 1 - Continued
3. Dedicate right-of-way and improve Mabelvale Pike
on the northern boundary of the property to
residential street standards.
4. Intersection of new collector with Mabelvale Pike
to be approved by the City Traffic Engineer.
5. A.H.T.D. will need to approve access and
improvements along I-30 access road.
E. Analysis
The applicant has submitted two plans for review, but
has stated an intention to develop only one, as
determined by market conditions. Staff is not opposed
to this nor the future platting of lots according to
ordinance standards. We have not agreed, however, with
his proposal for improvements. Improvements to the
street should be provided as stated by the City
Engineers.
Staff is favorable to the applicant's proposal for a
collector through the site. It provides a good
connection to Chicot Road.
STAFF RECOMMENDATION:
Approval of Plan A.
SUBDIVISION COMMITTEE REVIEW:
The applicant was requested to get with staff and
Engineering to decide which improvements would be provided
and clarify different aspects of both plans.
PLANNING COMMISSION ACTION:
The applicant, Mr. Jim Hathaway, who represented the
developers, was present. There were no opposers. There was
no vote on this item since the Commission voted to approve
Plan B (see No. 1A).
October 9, 1984
SUBDIVISIONS
Item No. lA
NAME:
Orbit Subdivision (Plan B)
LOCATION: North of I-30 at the Southeast
Intersection of Mabelvale Pike
and North Chicot
DEVELOPER: ENGINEER/APPLICANT:
Jim Hathaway, 372-1700 Mark Wright
Orbit Valve Profit Sharing Mehlburger, Tanner, Renshaw
7500 Interstate Drive P.O. Box 3837
Little Rock, AR 72209 Little Rock, AR 72203-3837
Phone: 372-1700 Phone: 375-5331
AREA: 51.922 acres NO. OF LOTS: 4 FT. OF NEW ST.:
Plan B, 400
ZONING: "R-211, "C-411, "MF-18"
PROPOSED USES: Single Family, Commercial, 'IMF-18"
PLANNING DISTRICT: 15
CENSUS TRACT: 41.05
VARIANCES REQUESTED: None
A. Site History
A proposal for the rezoning of this site from "MF-18"
and "R-2" to "C-4" and 'IMF-18" was reviewed by the
Commission on December 13, 1983. It was decided that a
plat would be needed to address street issues, such as
the classification of the Chicot Road, Mabelvale Pike
and a proposed street through the property. The item
was not forwarded to the Board.
B. Existing Conditions
The land involved is basically flat and almost entirely
covered by mature vegetation. It is bordered on the
west by North Chicot, on the north by Mabelvale Pike
and on the south by I-30.
October 9, 1984
SUBDIVISIONS
Item No. lA - Continued
C. Development Proposal
1. The applicant has submitted a plan for review by
the Commission. He has requested:
a. Approval of future lots to be platted
according to the minimum lot sizes for the
appropriate zoning district.
b. In the event of development of lots which
will be subsequently platted, construction of
the improvements shall be limited to the
frontage on the roads abutting said lots and
shall not be required until the lot is
actually improved.
2. This plan will be developed only if all of Tract
"B" and/or all of Tract "B" were purchased
simultaneously. Then a new collector would not be
required, but all of the Mabelvale Pike frontage
and all of the North Chicot Road bordering the
property would be improved to collector standards.
Engineering Considerations (Plan B)
1. Dedicate right-of-way and improve North Chicot
Road to collector standards.
2. Dedicate right-of-way and improve Mabelvale Pike
to collector street standards.
3. The proposed roadway improvement at North Chicot
Road and Mabelvale Pike is satisfactory. Request
plans to modify the intersection of Carolina
Drive.
4. A.H.T.D. to approve access and improvements along
the I-30 access road.
E. Analysis
The applicant has submitted two plans for review, but
has stated an intention to develop only one, as
determined by market conditions. Staff is not opposed
to this nor the future platting of lots according to
ordinance standards. We have not agreed, however, with
his proposal for improvements. Improvements to the
street should be provided as stated by the City
Engineers.
October 9, 1984
SUBDIVISIONS
Item No. lA - Continued
This plan indicates no collector street. If it is approved,
then staff recommends the combining of Lots B, C and D so
that there will be a two lot plat.
STAFF RECOMMENDATION:
Approval, subject to comments made.
SUBDIVISION COMMITTEE REVIEW:
The applicant was requested to get with staff and
Engineering to decide which improvements would be provided
and clarify different aspects of both plans.
PLANNING COMMISSION ACTION:
Mr. Jim Hathaway represented the developer. There were no
opposers. He explained that the only difference between the
two plans were the provision of the collector through one.
Due to several months of research, it was his determination
that building both a collector and boundary streets on the
plan would not be cost-effective, thus, he requested a
waiver of the street improvements. Justification for
submission of both plans was based on the reasoning that a
collector would not be necessary if the land was sold as one
tract. If it was further subdivided, however, the road
would be necessary to build a collector. There was a cost
difference of $150,000 in the plans.
Staff stated their preference for no lot lines on Plan B,
since the applicant would have to come back to the
Commission to get rezoning to accommodate each use. The
Commission expressed their reluctance to approve both plans
at once. They asked the applicant his preference, which was
"Plan B," the one without the collector. It was decided if
he sold the tract in anything other than its entirety, he
would have to come back to the Commission. On this basis, a
motion was made for the approval of Plan B. The motion
passed by a vote of: 9 ayes, 0 noes and 2 absent.
N :7 City of Little Rock
Office of
Comprehensive
_ Planning
October 30, 1984
City Hall
Markham at Broadway
Little Rock, Arkansas 72201
371-4790
Mr. Jim Hathaway
Hathaway/Moore & Associates, Inc.
1500 Worthen -Bank Building
Little Rock, AR 72201
Dear Mr. Hathaway:
Please be advised that the following comments were received from the
Little Rock Waste Water Utility after the meeting at which the Orbit
Subdivision was approved: _1
"The site is located within a sewage drainage basin designated
as #39. There have been wet weather overflows of the inter-
ceptor serving this basin in the Hindman Park -Lewis Road area.
There has also ,been concern about possible dry weather overflows
occurring as the "build -out" of the drainage basin continues.
This project would escalate that danger substantially because
it would generate an estimated average daily flow of 270,000
gallons. Although we have no firm field data to verify this
condition at the present time, We advise caution and recommend
a phased development."
You will still be required to adhere to the comments. Any specific
questions should be directed to Mr. Fred Schlegel of the Waste Water
Utility. If I can be of any further assistance, please feel free to
call.
Sincerely,
B. Bernnadette Bettard
Subdivision Administrator
BBB/se r
City of Little
Office of
Comprehensive
Planning
For Offi
City Hall
Markham Broadway •i.. '�-ir ,j]j_��U
Little Rock,, Arkansas 72201 Nan]e • {� L.L n
371-4790 F i le No . C-z - 4 ) —
Location:
Tvoe of Plan:-Plrl�)- Ln+na Ae-,AA
,,4rkansas Power & Light Company
Arkansas Louisiana Gas Company
Southwestern Bell Telephone Company
Little Rock Municipal Water Works
Little Rock Wastewater Utility System
County Planning
Little Rock Fire Department
d�' U
�o
�i
V�
Re :—I
Gentlemen:
On 192LLL, the Little Rock Planning Commission will
consider the above referenced plat for preliminary approval.
A copy of the plat is enclosed for your consideration, and your comments
and/or recommendations will be greatly appreciated.
Sincerely,
Office of Comprehensive Planning
(Please respond below, and return this letter for our records.)
Approved as submitted
Easements required (see attached plat or description below)
Comments:
By
Enclosure
cc: Engineering Division
RECEIVED BY
S EP 191984
CHIEF CLERKS OF! -ICE
ENGINEf--RING DEPT,
N0
April 7, 1987
SUBDIVISIONS
Item 3 - File No. 721-B
NAME:
r f%!+ T MY r%'KT .
T%"T 7,07 f%,n GD .
Hathaway Group Agent
1500 Worthen Bank Bldg.
.Little Rock, AR 72201
Telephone: 372-1700
Orbit Subdivision
Revised Preliminary Plat
East of North Chicot Road and
Interstate 30 Frontage Road
T]LTf'T Li Z7 L7 O .
Mehlburger, Tanner, Robinson
and Associates Inc.
201 South Izard
Little Rock, AR 72201
Telephone: 375-5331
AREA: 51.9 Acres NO. OF LOTS: 7
ZONING: 11C-4"
PROPOSED USE: Highway Commercial
PT,ANNTNG DISTRICT: 15
CENSUS TRACT:' 20.01
VARIANCES REQUESTED:
None.
FT. NEW STREET: 0
A. Existing Conditions
A developing commercial corridor on the north side of
Interstate 30, the land has been partially cleared and
no grade or drainage issues exist.
April 7, 1987
SUBDIVISIONS
Item 3 - Continued
B. Development Proposal
To create one commercial lot out of the current
Tract C and to title this Lot G consisting of 168' of
frontage and a variable depth up to 5001. This plat
was approved initially as a mixed use preliminary.
Several lots have been sold. A commercial use is being
constructed at the corner of Chicot Road and an
apartment complex was recently completed lying to the
north.
C. Engineering Comments
Boundary street improvements are required on North
Chicot Road and Mabelvale Pike. Stormwater detention
required on -site also.
D. Analvsis
The Planning staff view of this proposal is that it is
entirely appropriate. The owner has committed to the
extension of the 40' buffer across Tracts C and G in
the fashion required for Tract F on the corner. We
believe this will provide for a more livable
environment for the apartment dwellers on the north lot
being Tract E.
E. Staff Recommendation
Approval of the plat as filed.
SUBDIVISION COMMITTEE REVIEW:
The item was reviewed by the
that the previous agreement
should be reflected on this
Committee. Staff explained
made regarding improvement
plat.
Utilities - Additional sewer easement required along the
west sides of Tracts A, D, and E around existing sewer main.
On -site fire protection required. An acreage water charge
of $150 per acre will apply.
April 7, 1987
SUBDIVISIONS
Item 3 - Continued
PLANNING COMMISSION ACTION:
A clarification was made regarding the required buffer
across the lots. Staff explained that it would be as
required by ordinance. A motion for approval, subject to
engineering comments was made and passed by a vote of 11
ayes, 0 noes, and 0 absent.