HomeMy WebLinkAboutS-0328 Staff AnalysisOctober 14, 1986
SUBDIVISIONS
Item No. 14 -
NAME:
r.nrAMTnnT.
DEVELOPER:
Richard Cone
78 Eldorado
Little Rock, AR
Telephone: 227-7063
A. Request
Chelsea Square Revised PRD
North side of Hinson Road
across from Marlow Manor
RWaTNRRR
Manes, Castin, Massey
and McGetrick
2501 North Willow
North Little ROck, AR 72114
Telephone: 758-1360
1. To revise an approved PUD.
2. To provide a 30' setback on Hinson Road.
B. Existing Conditions
Mixed residential area.
C. Issues/Discussion/Legal/Techn.ical/Design
1. Clarification of proposal relative to unit
details.
D. Engineering Comments
Ordinance requirements for site distance requires a
600-foot site distance. Plan shows only a 230-foot
site distance due to proposed wall. Please contact
Traffic to determine a position for wall to maintain
setback.
E. Staff Analysis
Staff needs clarification of the proposal and
submission details of units.
F. Staff Recommendation
Reserved until info received.
October 14, 1986
SUBDIVISIONS
Item No. 14 - Continued
G. SUBDIVISION COMMITTEE REVIEW
The applicant agreed to furnish further information.
PLANNING COMMISSION ACTION:
A motion was made and passed for approval, subject to
Engineerings approval of site distance and building line
modified to 30 feet only in area of Lot 2. The motion
passed by a vote of 7 ayes, 0 noes, and 4 absent.
1. Refer to meeting of December 1 and letter from
Fulkerson, December 6.
2. Focus on future requirement:
a. Construction to be completed no later than April, 1984.
b. Summer !,83 only construction period before April, 1984.
C. Appoint engineer - (Finley Williams)
d. Commit to design during specific period - (Winter 83).
e. Commit to construction during June - September 83.
3. To construct i street improvements adjacent to Winsor
town homes causes technical problems. Entire cross-section
should be constructed at same time.
4. Base course of SB-2 must be cleared and re -worked
during reconstruction on road. Seal at this time will
not be helpful (it would have been when required).
5. If Fulkerson agrees - how do we ensure performance?
�'O.rG l�i�l�IF�
1151_19 111ILLINS InGIMRS, Inc.
Consulting Civil Engineers
WA4. FINLEY WILLIAMB. P E
VOC6 M&CE
Mr. Bob Lane
Engineering Division
Public Work Department
701 West Markham Street
Little Rock, Arkansas 72201
Dear Mr. Lane:
210 VICTORY STREET • TELEPHONE 376-3505
LITTLE ROCK, ARKANSAS 72201
December 6, 1982
Re: Winsor Court Town Homes
Phases 1 and 2
Pursuant to a meeting with Mr. Davies Wednesday, December-1,
1982, regarding certain improvements to part of Hinson Road,
my client, Mr. Floyd Fulkerson, would like to propose the follow-
ing:
1. That this office proceed to prepare final construction
plans and specifications for permanent pavement on
Phases 1 and 2.
2. To proceed with permanent construction of the nine foot
wide strip lying between the existing curb and gutter
and the existing surface of Hinson Road. This proposal
to front Phases 1 and 2.
3. Upon completion and city acceptance of Item 2 above,
that Mr. Fulkerson post an appropriate bond for that work.
4. That Mr. Fulkerson be excluded from any tri-party agree-
ments on the entire project.
We trust that this proposal will be given serious considera-
tion by your office. Should you have any questions or desire to
discuss any of the items please call at your convenience.
Sincerely yours,
Wm. Finley Williams
WFW/bw