Loading...
HomeMy WebLinkAboutS-0270 Staff AnalysisAugust 10, 1982 SUBDIVISIONS Item No. 2 NAME: LOCATION: nEVEMPRR Americare Corporation Agent: Pleasant Hills Total Living Comm. P.O. Box 5769 Little Rock, AR 72215 Pleasant Hills Total Living Community Plat/Site Plan Review St. Charles Boulevard at Napa Valley Drive RMaTMRRR Mehlburger Tanner & Renshaw P.O. Box 3837 Little Rock, AR Phone: 375-5331 AREA: 9.95 acres NO. OF LOTS: 1 FT. OF NEW STREET: 670' ZONING: "MF-18" PROPOSED USES: Apartments VARIANCES REQUESTED: (1) 40' buffer and 6' fence on west. (2) Building line waiver along Napa Valley for guardhouse. vunvncnT.. 1. The construction of 165 rental units for the elderly on 9.95 acres. 2. The project is composed of 13, one-story tri-plexes and two, three-story apartment buildings. 3. Development according to the following: Building/ Unit Type Area Qty. Total Tri-plex 1-story 3,263 Sq. Ft. 13 42,419 Sq. Ft. One-Bd. 1 Each 945 Sq. Ft. 13 12,285 Sq. Ft. Tri-plex Two-Bd. 2 Each 1,159 Sq. Ft. 26 30,134 Sq. Ft. Tri-plex 42,419 Apt. Bldg. 3-story 15,478_ Sq. Ft. 2_ 30,947 Sq. Ft. Efficiency 4/Floor 413 Sq. Ft. 24 _ 9.924 Sq. Ft. One-Bd. ll/Floor 551.75 Sq. Ft. 66 36,415 Sq. Ft. Handicapped 2/Floor 551.75 Sq. Ft. 12 6,621 Sq. Ft. Areas Two-Bd. 4/Floor 862.25 Sq. Ft. 24 20,694 Sq. Ft. Total for two bldgs. = 21 units/floor 126 73,696 Sq. Ft. units August 10, 1982 SUBDIVISIONS Item No. 2 - Continued Activities Building 2-story area 12,002 Sq. Ft. Ground Coverage 9,906 Sq. Ft. Guardhouse 64 Sq. Ft. Gazebo 144 Sq. Ft. Total Bldg. Ground Coverage 116,577 Sq. Ft. (2.68 acres) SPECIAL REQUIREMENTS -_SITE PLAN AND-"MF-18" 1. Plans must have site area of one acre. This plan complies. 2. Detached buildings shall be separated by least 101. This plan complies. 3. A registered land survey must be submitted. This plan complies. 4. The applicant should submit quantitative data as to proposed building coverage, parcel size, floor area and number of parking spaces. This plan complies. 5. Landscaping and screening shall be in accordance with the City's Ordinance. ENGINEERING CONSIDERATIONS: (a) Alignment for Napa Valley is satisfactory; the proposed corner to align Napa Valley and Bowman Road extended, becomes tangent at the south end of the property. (b) Napa Valley Road to be improved to minor arterial standards. STAFF ANALYSIS: Staff has no major objections to the proposal as designed. The applicant has requested two variances. One is for a 40' buffer and 6' fence on the west side of Phase 1 because of plans for future expansion in 3-5 years. The other is for a building line on Napa Valley to allow for the construction of a guardhouse (8' x 81), which will encroach 9' into a platted building line. The guardhouse will serve as a means for security and access control. Staff has no objections to the variances. STAFF RECOMMENDATION: Approval, as filed. August 10, 1982 SUBDIVISIONS Item No. 2 - Continued SUBDIVISION COMMITTEE ACTION: Mr. non Chambers, of Mehlburger, Tanner & Renshaw, represented the applicant. A motion for approval was made and passed, subject to: (1) platting of service road as a one-way, 45' right-of-way from the point of entry to the west property line; and (2) further consideration of parking design. The motion passed by a vote of 4 ayes, 0 noes and 1 absent. PLANNING COMMISSION ACTION: Mr. Don Chambers represented the applicant. There were no objectors. A revised plan was submitted. A commitment was made to satisfy staff's concern about the parking design through the lengthening of parking spaces by 41. A motion for approval as revised was made and passed by a vote of 8 ayes, 0 noes and 3 absent.