HomeMy WebLinkAboutS-0224-E Staff AnalysisJanuary 11, 2018
NO.: 2
NAME: Westover Hills Subdivision Replat Lots 77R and 78R
LOCATION: Located at 6701 and 6705 Hawthorne Street
DEVELOPE
Justin Keener
P.O. Box 241489
Little Rock, AR 72223
RVEYOR/ENGINEER:
Brooks Surveying, Inc.
20820 Arch Street Pike
Hensley, AR 72065
ILE NO.: S-224-E
AREA: 0.39-acres NUMBER OF LOTS: 2 FT. NEW STREET: 0 LF
WARD: 3 PLANNING DISTRICT: 3 —West Little Rock CENSUS TRACT: 49
CURRENT ZONING
VARIANCENVAIVERS
setback of 3-feet.
R-2, Single-family
A variance to allow Lot 78R to have a reduced side yard
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is requesting a replat of Lots 77 and 78 of the Westover Hills
Subdivision. The requested replat is to reflect an agreed upon solution to a
fence/boundary issue between the two (2) properties. The existing fence
encroaches several feet onto Lot 78. The owners of both lots have agreed on a
new boundary (property) line corresponding to the fence placement. The owner
of Lot 78 is requesting a variance to allow a reduced side yard setback on the
east property line. This property line is the affected property line by the replat.
The request is to allow a three (3) foot setback along this common property line.
January 11, 2018
SUBDIVISION
ITEM NO.: 2 Cont.
B. EXISTING CONDITIONS:
FILE NO.: S-224-F
The area is predominately single-family with homes located on lots of similar size
as the applicant's property. There is a commercial area located to the west of
the site at the intersection of Hawthorne Road and Durwood Road which includes
retail, office and a church. Hawthorne Road is constructed with curb and gutter.
There is a sidewalk along the north side of Hawthorne Road.
C. NEIGHBORHOOD COMMENTS:
All abutting property owners along with the Heights Neighborhood Association
and the Kingwood Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
No comment.
E. Utilities/Fire Department/Parks/County Planning -
Little Rock Water Reclamation Authorit : Sewer available to this site. Contact
Little Rock Water Reclamation Authority for additional information.
Entergy: Entergy does not object to this proposal. There do not appear to be
any conflicts with existing electrical utilities based on the information provided.
There is an existing single phase power line running near the rear property line
providing service to existing structures. Contact Entergy in advance to discuss
electrical service requirements, or adjustments to existing facilities (if any) as this
project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: No comment received.
Fire Department: No comment.
Parks and Recreation: No comment received.
County Planning: No comment.
2
January 11, 2018
SUBDIVISION
ITEM NO.: 2 (Cont.) FILE NO.: S-224-E
F. Building CodeslLandsca e:
Building Code: The required fire separation distance (building to property line)
prescribed by the building code terminates at five (5) feet. Buildings are allowed
to be closer than five (5) feet if they have properly constructed fire walls which
provide the requisite one (1) hour fire resistance rating. When buildings are five
(5) feet or more from the property line, the requirement no longer applies to the
wall itself, only the projections such as eaves or overhangs.
Openings such as doors and windows are limited when the exterior wall is three
(3) feet from the property line, and are prohibited when the exterior wall is less
than three (3) feet from the line. There is no restriction on openings when the
exterior wall is more than three (3) feet from the property line.
For information on submittal requirements and the review process contact Curtis
Richey at 501.371.4724 or cricheyQ Iittlerock. gov.
Landscape: No comment.
G. Transportation/Planning:
Rock Region Metro: The site is not located on a dedicated Rock Region Metro
Route.
Planning Division: No comment.
H. SUBDIVISION COMMITTEE COMMENT: (December 20, 2017)
The applicant was present representing the request. Staff presented an
overview of the item stating there were few additional items necessary to
complete the review process. Staff stated they were concerned with the
proposed three (3) foot side yard setback and questioned if the setback could not
be increased to five (5) feet. Staff suggested the applicant contact the Building
Codes Division to verify the required construction materials for the new home
with the three (3) foot setback.
Public Works comments were addressed. Staff stated due to the location of a
retaining wall right of way dedication on Hawthorne Road was not required.
Staff noted the comments from the various other departments and agencies.
Staff suggested the applicant contact the departments or agencies directly with
any questions or concerns. There were no more issues for discussion. The
Committee then forwarded the item to the full Commission for final action.
3
January 11, 2018
SUBDIVISION
ITEM NO.: 2 (Cont) FILE NO.: S-224-E
ANALYSIS:
The applicant has addressed comments raised at the December 20, 2017,
Subdivision Committee meeting. The applicant has met with the Building Codes
staff and has determined the requirements to allow the placement of the structure
with the three (3) foot side yard setback. The applicant has indicated the wall
located along the reduced side yard setback will be constructed with fire rated
construction materials. The applicant will also limit openings as required by the
Fire Code.
The request is a replat of Lots 77 and 78 of the Westover Hills Subdivision. The
replat is to reflect an agreed upon solution to a fence/boundary issue between
the two (2) properties. An existing fence located on Lot 77 encroaches several
feet onto Lot 78. The owners of both lots have agreed on a new boundary
(property) line corresponding to the fence placement. Lot 77R is indicated with a
65-foot lot frontage and Lot 78R is indicated with a 64.67-foot lot frontage. Both
lots are indicated with a lot depth of 140-feet.
The owner of Lot 78 is requesting a variance to allow a reduced side yard
setback on the east property line, the property line affected by the replat. The
request is to allow a side yard setback ranging from five (5) feet to a minimum of
three (3) feet along the eastern property line. The applicant is proposing to
construct the wall along this side yard as required by the City's Fire Code. All
materials along this wall will be fire rated materials. Openings will be limited to
the wall areas which have a setback of more than three (3) feet.
Staff is supportive of the applicant's request. The applicant is seeking a replat to
recognize an existing encroachment onto the adjacent lot. Although the
applicant is seeking the reduced side yard setback based on the applicant's
commitment to construct the wall with fire rated materials staff does not feel the
reduced setback will have an adverse impact on the lot or the area.
J. STAFF RECOMMENDATION:
Staff recommends approval of the request subject to compliance with the
comments and conditions as outlined in paragraphs D, E and F of the agenda
staff report.
Staff recommends approval of the variance request to allow a reduced side yard
setback for Lot 78R.
0
January 11, 2018
SUBDIVISION
ITEM NO.: 2 Cont. FILE NO.: S-224-E
PLANNING COMMISSION ACTION: (JANUARY 11, 2018)
The applicant was present. There were no registered objectors present. Staff
presented the item with a recommendation of approval of the request subject to
compliance with the comments and conditions as outlined in paragraphs D, E and F of
the agenda staff report. Staff presented a recommendation of approval of the variance
request to allow a reduced side yard setback for Lot 78R. There was no further
discussion. The item was placed on the consent agenda and approved as
recommended by staff by a vote of 11 ayes, 0 noes and 0 absent.
5
ITEM NO.: 2, S-224-E
NAME: Westover Hills Subdivision Replat Lots 77R and 78R
LOCATION: located at 6701 and 6705 Hawthorne Street
Planning Staff Comments:
1. Provide notification of the abutting property owners including the certified abstract list,
notice form with affidavit executed and proof of mailing. The notice must be mailed no
later than December 27, 2017. The Office of Planning and Development must receive the
proof of notice no later than January 5, 2018.
2. If the distance between the proposed structure and the new property line is less than five
(5) feet the wall must be a fire rated wall. Check with the City of Little Rock Building
Codes Division for additional information, Curtis Richey cricheyCQ7littlerock. gov or
501.371.4724.
3. Staff feels the setback along the common lot line should be a minimum of 5-feet. Three
(3) feet causes concerns with fire/construction materials for the new home.
Variance/Waivers: A variance to allow Lot 78R to have a reduced side yard setback of 3-
feet.
Engineering Comments:
Public Works Conditions:
1. Hawthorne Road is classified on the Master Street Plan as a residential street. A
dedication of right-of-way 25-feet from centerline will be required.
Utilities/Fire Department/Parks/County Planning:
Little Rock Water Reclamation Authority: Sewer available to this site. Contact Little Rock
Water Reclamation Authority for additional information.
Entergy: Entergy does not object to this proposal. There do not appear to be any conflicts
with existing electrical utilities based on the information provided. There is an existing single
phase power line running near the rear property line providing service to existing structures.
Contact Entergy in advance to discuss electrical service requirements, or adjustments to
existing facilities (if any) as this project proceeds.
Centerpoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water: No comment received.
ITEM NO.: 2.
S-224-E
Fire Department: No comment.
Parks and Recreation: No comment received.
County Planning: No comment.
Building Codes/Landscape:
Building Code: No comment.
Landscape. No comment.
Transportation/Planning:
Rock Region Metro: The site is not located on a dedicated Rock Region Metro Route.
Planning Division- No comment.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include the
additional information as noted above) to staff on Wednesday, December 27 2017.