Loading...
HomeMy WebLinkAboutS-0219 Staff AnalysisJanuary 12, 1982 SUBDIVISIONS Item No. 4 NAME: LOCATION: DEVELOPER: Coy Dean Little Rock, AR Phone: 455-1222 AREA: 3.5 Acres ZONING: "R-2" Dean Subdivision On I-30 Access Road, west of Vimy Ridge Road, east of the MoPac Railroad ENGINEER: Troy D. Laha 7 Althea Circle Little Rock, AR 72209 Phone: 565-7384 NO. OF LOTS: 6 FT. OF NEW ST.: 0 PROPOSED USES: Warehouse, Commercial, etc. VARIANCES REQUESTED: Although none are requested, there are nonconformities such as width, buffering, etc. A. EXISTING CONDITIONS This site is located south of I-430 in an area where mixed uses are apparent. The recently annexed parcel is completely flat and within the floodplain. There are existing structures on what's proposed to be Lots 1-3. Two of the buildings house businesses and the other consists of a storage type use. Immediate access to the property is provided by three curb cuts in the frontaqe road that lead into that portion of the property containing the structures. A 50' easement for inqress and egress is located on the eastern boundary of the property or what is proposed to be Lot 6. It was previously given to the Optimist Club of the McClellan Foundation for access to the property abutting on the'south. The current zoning is R-2.' B. DEVELOPMENT PROPOSAL This plan involves developing a tract of 3.5 acres into six lots of varying sizes. The objective is to construct warehouse type structures on Lots 4 and 5 and a drive-in restaurant on Lot 6. The existing structures are to be retained with no change in their usage. January 12, 1982 SUBDIVISIONS Item No. 4 - Continued 1. Conformance to Ordinance No variances have been formally requested; however, the plan does vary from some basic ordinance requirements, which will be dealt with in the Staff's analysis. 2. Legal Considerations The BOA should indicate that the area is flood prone. C. ENGINEERING (a) Street improvements normally not required along I-30 frontage road. (b) Plat must show floodway line for use with individual lot development. (c) Floodplain regulations apply. D. ANALYSIS Staff is not entirely opposed to this proposal; however, several concerns must be addressed. First of all, since the property was recently annexed into an "R-2" zoning district with commercial uses, Staff suggests that the property be rezoned to "C-3." Secondly, as designed, some of the lots do not meet the ordinance's basic commercial lot size requirements. The lots should be redesigned to do so. Lot 3 should be eliminated and combined with Lot 2, and Lots 4, 5 and 6 should be recombined to meet the 100' width requirement. Five lots are the maximum allowed. Other suggestions include: (1) the need for approval by Highway Department relative to additional access to I-30 frontage roads in number and proximity; (2) elimination of 50' access easement from this plat and deed to owner served; (3) 40' buffer along south line of plat; and (4) spot elevations, M.S.L. to plat. E. STAFF RECOMMENDATION Approval; subject to comments. January 12, 1982 SUBDIVISIONS Item No. 4 - Continued SUBDIVISION COMMITTEE RECOMMENDATION: Approval subject to the following revisions: 1. The engineer is to explore the idea of gaining plus or minus ten feet of the 50' access easement on Lot 6 for purposes of gaining enough dimension to accommodate four lots of minimum width. 2. Remove the balance of the easement from the plat and deed to the owner served. 3. Lots 2 and 3 are to become a single lot. 4. Indicate the 100 Year Floodplain line and elevation on the plat. The vote: 4 ayes, 0 noes and 1 absent. PLANNING COMMISSION ACTION: The applicant, Mr. Coy Dean, was in attendance. Staff reported in the agenda session that a revised plan that met requirements had been submitted. A motion was made to approve the plat, subject to rezoning. The vote: 10 ayes, 0 noes and 1 absent.