HomeMy WebLinkAboutS-1042-V Staff Analysisc
3�1
qo_�W-kision Committee Comments
ITEM NO.: 3
April 10, 2003
FILE NO.: S-1042-V
NAME: The Villages of Wellington Phase III Preliminary Plat
LOCATION: On Parliament Court just south of Lamplight Way
Planning Staff Comments:
1. Provide notification of abutting property owners complete with the certified abstract
list, notice form with affidavit executed and proof of mailing.
Variance/Waivers:� �Y
1. None requested.
Public Works: Saw
1. The length of Parliament Court exceeds the criteria (750') for classification as a
minor residential street. Therefore, a circular cul-de-sac would be required as
shown on a previous plat, or a variance must be approved.
2. A drainage easement should be shown across Lot 20. U " P�v
Utilities and Fire Department/County Planning: -
r — iob
Wastewater: Sewer main extension required with easements if service is required for
the project. Contact Little Rock Wastewater Utility at 688-1414 for additional details.
Entergy: No comment received. �A Lii,
Center -Point Energy: No comment received.-
r
SBC: No comment received.
Central Arkansas Water: A water main extension will be required in order to provide
service to this property. Each lot served must have frontage on this water main. A
Capital Investment Charge based on the size of the meter connection (s) will apply to
this project in addition to normal charges. This development will have minor impact on
existing water distribution system. Proposed water facilities will be sized to provide
adequate pressure and fire protection. Contact Central Arkansas Water at 992-2438 for
additional details.
Fire Department: Place fire hydrants per code. Contac the Little Rock Fire Department
at 918-3572 for additional details.
County Planning: No comment received.
CATA: The site is not located on a dedicated bus route and has no effect on bus
radius, turnout and route.
Planning Division: No comment.
Landscape: No comment.
Revised plat/plan: Submit four (4) copies of a revised site plan (to include the
additional information as noted above) to staff on Wednesday, April 16, 2003.
May 1, 2003
ITEM NO.: 3
NAME: The Villages of Wellington Phase III Preliminary Plat
LOCATION: On Parliament Court just south of Lamplight Way
DEVELOPER:
Winrock Development Company
2222 Cottondale Lane, Suite 300
Little Rock, AR 72203
FNC;INFFR-
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 6.3 acres NUMBER OF LOTS: 23
CURRENT ZONING: R-2, Single-family
PLANNING DISTRICT: 19 - Chenal
CENSUS TRACT: 42.07
FILE NO.: S-1042-V
FT. NEW STREET: 910
VARIANCESMAIVERS REQUESTED: Reduced platted building line for Lots 13 — 20
Block 5 and Lots 10 — 19 Block 4.
Increased length of a minor residential street (910 linear feet).
BACKGROUND:
A preliminary plat for a subdivision of a 16.6 acre tract, creating 45 single-family lots
along with 1680 feet of new street was proposed to the Commission in November 1994.
The proposal included an area located to the west of the existing proposal, which is
listed as an alternative church site. The acreage matching the current preliminary plat
was a request to develop the area into twenty (20) lots, which averaged eighty by one
hundred fifteen or 9,200 square feet. The lots were to be served by a single cul-de-sac
with the typical three lots at the end of the cul-de-sac.
May 1, 2003
SUBDIVISION
ITEM NO.: 3 (Cont.) FILE NO.: S-1042-V
A. PROPOSAL:
The applicant proposes to revise a previously approved preliminary plat to
subdivide this 6.3 acre tract into 23 single-family lots. The area was previously
approved with 20 single-family lots with an average width of 80-feet.
The lots will be accessed by an extension of Parliament Court with the
construction of 910 linear feet of new street. The applicant proposes to terminate
the street with a "hammer head" rather than the traditional cul-de-sac. The
applicant is requesting a variance to allow an increased length of the minor
residential street (950 linear feet). The applicant proposes the lots to average 70
feet by 120 feet and contain approximately 8,400 square feet.
The applicant proposes the street to be constructed with 26-feet of pavement in a
50-foot right-of-way. The applicant is proposing a reduced platted building line
of 15-feet adjacent to the right-of-way for proposed Lots 13 — 20 of Block 5 and
10 — 19 of Block 4. The remainder of the lots will have a 25-foot platted building
line.
The applicant has indicated all utilities are available to the site. The applicant
has also indicated the stormwater detention requirements were met with the
construction of the existing lake several years ago.
B. EXISTING CONDITIONS:
The site is a vacant tree covered site with rolling topography, dropping towards
the southwest from a high point along the northeast boundary of the site. The
area to the north has been developed as single-family homes by the applicant
with a similar lot size as proposed. The area to the south of the site abuts the
Chenal Park Apartments accessed by Chenal Parkway. There is vacant 0-1
zoned property to the west of the proposed development and a church located
along Wellington Village Drive.
Other uses in the area include mini -warehouse, office, and vacant commercially
zoned properties. To the east of the site the St. Charles Subdivision abuts the
site and to the southeast is the Parkway Village Retirement Community.
C. NEIGHBORHOOD COMMENTS:
All abutting property owners, along with the St. Charles Neighborhood
Association were notified of the Public Hearing. As of this writing, Staff has not
received any comment from the neighborhood.
D. ENGINEERING COMMENTS:
Public Works:
The length of Parliament Court exceeds the criteria (750') for classification as
a minor residential street. Therefore, a circular cul-de-sac would be required
as shown on a previous plat, or a variance must be approved.
2
May 1, 2003
SUBDIVISION
E
NO.: 3 (Cont.
2. A drainage easement should be shown across Lot 20.
UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
0.: S-1042-V
Wastewater: Sewer main extension required with easements if service is
required for the project. Contact Little Rock Wastewater Utility at 688-1414 for
additional details.
Entergy: No comment received.
Center -Point Energy: No comment received.
SBC: No comment received.
Central Arkansas Water: A water main extension will be required in order to
provide service to this property. Each lot served must have frontage on this
water main. A Capital Investment Charge based on the size of the meter
connection (s) will apply to this project in addition to normal charges. This
development will have minor impact on existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection. Contact Central Arkansas Water at 992-2438 for additional details.
Fire Department: Place fire hydrants per code. Contac the Little Rock Fire
Department at 918-3572 for additional details.
County Planning: No comment received.
CATA: The site is not located on a dedicated bus route and has no effect on bus
radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Plannina Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT:
(April 10, 2003)
Mr. Joe White of White-Daters and Associates and Mr. Doug McNeil of Winrock
Development were present representing the application. Staff introduced the
item indicating the area was previously preliminary platted as a 20-lot subdivision
served by a cul-de-sac. Staff stated the current request was for 23-lots to be
served by a "hammer -head turnaround". Staff stated the request would involve a
variance to allow the increased length of the "hammer -head turnaround".
41
May 1, 2003
SUBDIVISION
ITEM NO.: _3 (Cont.�_ _ FILE NO.: _S-1042-V
Public Works comments were discussed including a request for a drainage
easement to be shown across Lot 20. Staff questioned how the drainage would
be taken care of. Mr. White stated the applicant's intentions were to pipe the
water in this area around Lot 20 to allow Lot 20 to still be a viable lot.
Staff questioned if the three additional lots were critical. Mr. White stated the
three lots were critical to justify the spending of the funds to place the
infrastructure in the area. Staff stated 750-feet was the maximum length of a
minor residential street. Staff stated the sanitation department did not like to
exceed this length because of safety concerns with the backing of garbage trucks
further lengths. Staff stated since the length was so close to the allowable length
Staff could support the requested variance to allow an increase in the length.
There was a general discussion concerning the platted building line and existing
driveway grades within the previous development. Staff questioned if a 15-foot
building line would allow for less steep drives. Mr. White stated he would check
to see if this would offer flexibility. He questioned if 15-foot was allowable under
the hillside development standard. Staff stated the proposed lots did not meet
the minimum required 10,000 square feet.
Comments from the utilities were noted. Staff suggested the applicant contact
these agencies for additional information regarding their comments. Staff noted
fire hydrants would be required per code as stated by the Little Rock Fire
Department.
There were no additional items for discussion. The Committee then forwarded
the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised preliminary plat to Staff addressing the issues
raised at the Subdivision Committee meeting. The applicant has indicated a 15-
foot platted building line on all lots fronting onto Parliament Court or Lots 13 — 20
of Block 5 and 10 — 19 of Block 4. Staff feels due to the topography of.the area
the reduced platted building line will allow for a better development of the homes
in the area with less of a grade for driveways.
The applicant has also indicated an increased length of the minor residential
street. The maximum length allowed per the Master Street Plan is 750-feet. The
applicant has indicated the length of the street to be 910-feet. This request will
have minor impact on the city sanitation department since without the traditional
cul-de-sac the garbage trucks will have to back the entire length of the street to
exit. There is some concern for safety in the backing of trucks that far and the
rounding of a curve in the process. The applicant has indicated a southern curve
radius to allow the truck a space to pull-out of traffic. Since the street only serves
17 lots there should be limited traffic on the street. Staff supports the requested
variance associated with the request to allow an increased length in the minor
residential street.
0
May 1, 2003
SUBDIVISION
ITEM NO.: 3 (Cont.)
FILE NO.: S-1042-V
To Staff's knowledge, there are no other outstanding issues associated with the
proposed request. If developed in the manner proposed the development should
have minimal to no impact on the surrounding neighborhood.
STAFF RECOMMENDATION:
Staff recommends approval of the proposed preliminary plat as filed subject to
compliance with the conditions outlined in paragraphs D, E and F of this report.
Staff recommends approval of the requested variance to allow a reduced platted
building line on Lots 13 -- 20 of Block 5 and Lots 10 — 19 of Block 4.
Staff recommends approval of the requested variance to allow an increased
length of a minor residential street.
5
May 1, 2003
ITEM NO.: 3 FILE NO.: S-1042-V
NAME: The Villages of Wellington Phase III Preliminary Plat
LOCATION: On Parliament Court just south of Lamplight Way
DEVELOPER:
Winrock Development Company
2222 Cottondale Lane, Suite 300
Little Rock, AR 72203
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 6.3 acres NUMBER OF LOTS: 23
CURRENT ZONING- R-2, Single-family
PLANNING DISTRICT: 19 - Chenal
CENSUS TRACT: 42.07
FT. NEW STREET: 910
VARIANCESM/AIVERS REQUESTED: Reduced platted building line for Lots 13 — 20
Block 5 and Lots 10 — 19 Block 4.
Increased length of a minor residential street (910 linear feet).
BACKGROUND:
A preliminary plat for a subdivision of a 16.6 acre tract, creating 45 single-family lots
along with 1680 feet of new street was proposed to the Commission in November 1994.
The proposal included an area located to the west of the existing proposal, which is
listed as an alternative church site. The acreage matching the current preliminary plat
was a request to develop the area into twenty (20) lots, which averaged eighty by one
hundred fifteen or 9,200 square feet. The lots were to be served by a single cul-de-sac
with the typical three lots at the end of the cul-de-sac.
May 1, 2003
SUBDIVISION
ITEM NO.: 3 (Cont,
A. PROPOSAL:
FILE NO.: S-1042-V
The applicant proposes to revise a previously approved preliminary plat to
subdivide this 6.3 acre tract into 23 single-family lots. The area was previously
approved with 20 single-family lots with an average width of 80-feet.
The lots will be accessed by an extension of Parliament Court with the
construction of 910 linear feet of new street. The applicant proposes to terminate
the street with a "hammer head" rather than the traditional cul-de-sac. The
applicant is requesting a variance to allow an increased length of the minor
residential street (950 linear feet). The applicant proposes the lots to average 70
feet by 120 feet and contain approximately 8,400 square feet.
The applicant proposes the street to be constructed with 26-feet of pavement in a
50-foot right-of-way. The applicant is proposing a reduced platted building line
of 15-feet adjacent to the right-of-way for proposed Lots 13 — 20 of Block 5 and
10 — 19 of Block 4. The remainder of the lots will have a 25-foot platted building
line.
The applicant has indicated all utilities are available to the site. The applicant
has also indicated the stormwater detention requirements were met with the
construction of the existing lake several years ago.
B. EXISTING CONDITIONS:
The site is a vacant tree covered site with rolling topography, dropping towards
the southwest from a high point along the northeast boundary of the site. The
area to the north has been developed as single-family homes by the applicant
with a similar lot size as proposed. The area to the south of the site abuts the
Chenal Park Apartments accessed by Chenal Parkway. There is vacant 0-1
zoned property to the west of the proposed development and a church located
along Wellington Village Drive.
Other uses in the area include mini -warehouse, office, and vacant commercially
zoned properties. To the east of the site the St. Charles Subdivision abuts the
site and to the southeast is the Parkway Village Retirement Community.
C. NEIGHBORHOOD COMMENTS:
All abutting property owners, along with the St. Charles Neighborhood
Association were notified of the Public Hearing. As of this writing, Staff has not
received any comment from the neighborhood.
D. ENGINEERING COMMENTS:
Public Works:
The length of Parliament Court exceeds the criteria (750') for classification as
a minor residential street. Therefore, a circular cul-de-sac would be required
as shown on a previous plat, or a variance must be approved.
2
May 1, 2003
SUBDIVISION
ITEM NO.: 3 (Cont.) FILE NO.: S-1042-V
2. A drainage easement should be shown across Lot 20.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements if service is
required for the project. Contact Little Rock Wastewater Utility at 688-1414 for
additional details.
Enter : No comment received.
Center -Point Enerav: No comment received.
SBC: No comment received.
Central Arkansas Water: A water main extension will be required in order to
provide service to this property. Each lot served must have frontage on this
water main. A Capital Investment Charge based on the size of the meter
connection (s) will apply to this project in addition to normal charges. This
development will have minor impact on existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection. Contact Central Arkansas Water at 992-2438 for additional details.
Fire Department: Place fire hydrants per code. Contac the Little Rock Fire
Department at 918-3572 for additional details.
County Planning: No comment received.
CATA: The site is not located on a dedicated bus route and has no effect on bus
radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Plannina Division: No comment.
Landscape: No comment-
G. SUBDIVISION COMMITTEE COMMENT:
(April 10, 2003)
Mr. Joe White of White-Daters and Associates and Mr. Doug McNeil of Winrock
Development were present representing the application. Staff introduced the
item indicating the area was previously preliminary platted as a 20-lot subdivision
served by a cul-de-sac. Staff stated the current request was for 23-lots to be
served by a "hammer -head turnaround". Staff stated the request would involve a
variance to allow the increased length of the "hammer -head turnaround".
3
May 1, 2003
SUBDIVISION
ITEM N
FILE NO.: S-1042-V
Public Works comments were discussed including a request for a drainage
easement to be shown across Lot 20. Staff questioned how the drainage would
be taken care of. Mr. White stated the applicant's intentions were to pipe the
water in this area around Lot 20 to allow Lot 20 to still be a viable lot.
Staff questioned if the three additional lots were critical. Mr. White stated the
three lots were critical to justify the spending of the funds to place the
infrastructure in the area. Staff stated 750-feet was the maximum length of a
minor residential street. Staff stated the sanitation department did not like to
exceed this length because of safety concerns with the backing of garbage trucks
further lengths. Staff stated since the length was so close to the allowable length
Staff could support the requested variance to allow an increase in the length.
There was a general discussion concerning the platted building line and existing
driveway grades within the previous development. Staff questioned if a 15-foot
building line would allow for less steep drives. Mr. White stated he would check
to see if this would offer flexibility. He questioned if 15-foot was allowable under
the hillside development standard. Staff stated the proposed lots did not meet
the minimum required 10,000 square feet.
Comments from the utilities were noted. Staff suggested the applicant contact
these agencies for additional information regarding their comments. Staff noted
fire hydrants would be required per code as stated by the Little Rock Fire
Department.
There were no additional items for discussion. The Committee then forwarded
the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised preliminary plat to Staff addressing the issues
raised at the Subdivision Committee meeting. The applicant has indicated a 15-
foot platted building line on all lots fronting onto Parliament Court or Lots 13 — 20
of Block 5 and 10 — 19 of Block 4. Staff feels due to the topography of the area
the reduced platted building line will allow for a better development of the homes
in the area with less of a grade for driveways.
The applicant has also indicated an increased length of the minor residential
street. The maximum length allowed per the Master Street Plan is 750-feet. The
applicant has indicated the length of the street to be 910-feet. This request will
have minor impact on the city sanitation department since without the traditional
cul-de-sac the garbage trucks will have to back the entire length of the street to
exit. There is some concern for safety in the backing of trucks that far and the
rounding of a curve in the process. The applicant has indicated a southern curve
radius to allow the truck a space to pull-out of traffic. Since the street only serves
17 lots there should be limited traffic on the street. Staff supports the requested
variance associated with the request to allow an increased length in the minor
residential street.
12
May 1, 2003
SUBDIVISION
ITEM NO.: 3 (Co
FILE NO.:
To Staff's knowledge, there are no other outstanding issues associated with the
proposed request. If developed in the manner proposed the development should
have minimal to no impact on the surrounding neighborhood.
STAFF RECOMMENDATION:
Staff recommends approval of the proposed preliminary plat as filed subject to
compliance with the conditions outlined in paragraphs D, E and F of this report.
Staff recommends approval of the requested variance to allow a reduced platted
building line on Lots 13 — 20 of Block 5 and Lots 10 — 19 of Block 4.
Staff recommends approval of the requested variance to allow an increased
length of a minor residential street.
PLANNING COMMISSION ACTION: (MAY 1, 2003)
Mr. Joe White of White-Daters and Associates was present representing the application.
There were objectors present. Staff presented the item with a recommendation of
approval of the proposed preliminary plat, as filed, subject to compliance with the
conditions outlined in paragraphs D, E •and F of the above report.
Staff presented a recommendation of approval of the requested variance to allow a
reduced platted building line on Lots 13 — 20 of Block 5 and Lots 10 — 19 of Block 4 and
Staff presented a recommendation of approval of the requested variance to allow an
increased length of a minor residential street.
Ms. Sarah Wacaster spoke in opposition of the proposed plat. She stated her home
was located on Lot 8 just north of the proposed development. She stated the site was
currently wooded and the trees acted as a buffer between the multi -family located south
of the proposed site. She stated when the lots were developed the view of the multi-
family would no longer be shielded and the noise level would increase. She stated with
the development of fewer lots then a larger buffer could be retained, which would assist
in the visual and noise concerns. She also questioned the sale -ability of the lots since
they would abut multi -family to the south.
Ms. Heather Metzler spoke in opposition of the proposed development. She questioned
the statement of the 10,000 square feet minimum lot size. Staff stated this related to
hillside development and if the lots did qualify for hillside development standards the
requested fifteen foot building line would be allowed by -right.
She also questioned the statement of backing of garbage trucks. Staff stated the
statement was incorrect and the trucks would turn -around in the hammer head. Staff
stated the turning around in a hammer head was more difficult than in a traditional cul-
de-sac.
There was a general discussion concerning the buffer to the south. Mr. White stated
the development of homes between the multi -family and the existing homes would act
as a buffer.
5
May 1, 2003
SUBDIVISION
ITEM NO.: 3 (Cont.
FILE NO.: S-1042-V
A motion was made to approve the requested preliminary plat and the requested
variances to include all staff recommendations and comments. The motion carried by a
vote of 10 ayes, 0 noes and 1 absent.
0
FILE NO.: S-1042-V
NAME: The Villages of Wellington Phase III Preliminary Plat
LOCATION: On Parliament Court just south of Lamplight Way
DEVELOPER:
Winrock Development Company
2222 Cottondale Lane, Suite 300
Little Rock, AR 72203
ENGINEER:
White-Daters and Associates
#24 Rahling Circle
Little Rock, AR 72223
AREA: 6.3 acres NUMBER OF LOTS: 23
CURRENT ZONING
R-2, Single-family
PLANNING DISTRICT: 19 - Chenal
CENSUS TRACT: 42.07
FT. NEW STREET: 910
VARIANCESMAIVERS REQUESTED: Reduced
Block 5 and Lots 10 — 19 Block 4.
Increased length of a minor residential street (910
BACKGROUND:
platted building line for Lots 13 — 20
linear feet).
A preliminary plat for a subdivision of a 16.6 acre tract, creating 45 single-family lots
along with 1680 feet of new street was proposed to the Commission in November 1994.
The proposal included an area located to the west of the existing proposal, which is
listed as an alternative church site. The acreage matching the current preliminary plat
was a request to develop the area into twenty (20) lots, which averaged eighty by one
hundred fifteen or 9,200 square feet. The lots were to be served by a single cul-de-sac
with the typical three lots at the end of the cul-de-sac.
FILE NO.: S-1042-V (Cont.
U'1
C
A
PROPOSAL:
The applicant proposes to revise a previously approved preliminary plat to
subdivide this 6.3 acre tract into 23 single-family lots. The area was previously
approved with 20 single-family lots with an average width of 80-feet.
The lots will be accessed by an extension of Parliament Court with the
construction of 910 linear feet of new street. The applicant proposes to terminate
the street with a "hammer head" rather than the traditional cul-de-sac. The
applicant is requesting a variance to allow an increased length of the minor
residential street (950 linear feet). The applicant proposes the lots to average 70
feet by 120 feet and contain approximately 8,400 square feet.
The applicant proposes the street to be constructed with 26-feet of pavement in a
50-foot right-of-way. The applicant is proposing a reduced platted building line
of 15-feet adjacent to the right-of-way for proposed Lots 13 — 20 of Block 5 and
10 — 19 of Block 4. The remainder of the lots will have a 25-foot platted building
line.
The applicant has indicated all utilities are available to the site. The applicant
has also indicated the stormwater detention requirements were met with the
construction of the existing lake several years ago.
EXISTING CONDITIONS:
The site is a vacant tree covered site with rolling topography, dropping towards
the southwest from a high point along the northeast boundary of the site. The
area to the north has been developed as single-family homes by the applicant
with a similar lot size as proposed. The area to the south of the site abuts the
Chenal Park Apartments accessed by Chenal Parkway. There is vacant 0-1
zoned property to the west of the proposed development and a church located
along Wellington Village Drive.
Other uses in the area include mini -warehouse, office, and vacant commercially
zoned properties. To the east of the site the St. Charles Subdivision abuts the
site and to the southeast is the Parkway Village Retirement Community.
IGHBORHOOD COMMENT
All abutting property owners, along with the St. Charles Neighborhood
Association were notified of the Public Hearing. As of this writing, Staff has not
received any comment from the neighborhood.
ENGINEERING COMMENTS:
Public Works:
1. The length of Parliament Court exceeds the criteria (750') for classification as
a minor residential street. Therefore, a circular cul-de-sac would be required
as shown on a previous plat, or a variance must be approved.
2. A drainage easement should be shown across Lot 20.
4
FILE NO.- S-1042-V (Cont.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements if service is
required for the project. Contact Little Rock Wastewater Utility at 688-1414 for
additional details.
Enter : No comment received.
Center -Point Energy: No comment received.
SBC: No comment received.
Central Arkansas Water: A water main extension will be required in order to
provide service to this property. Each lot served must have frontage on this
water main. A Capital Investment Charge based on the size of the meter
connection (s) will apply to this project in addition to normal charges. This
development will have minor impact on existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection. Contact Central Arkansas Water at 992-2438 for additional details.
Fire Department: Place fire hydrants per code. Contac the Little Rock Fire
Department at 918-3572 for additional details.
County Plannin : No comment received.
CATA: The site is not located on a dedicated bus route and has no effect on bus
radius, turnout and route.
F. ISSUES/TECHNICAL/DESIGN:
Planning Division: No comment.
Landscape: No comment.
G. SUBDIVISION COMMITTEE COMMENT: (April 10, 2003)
Mr. Joe White of White-Daters and Associates and Mr. Doug McNeil of Winrock
Development were present representing the application. Staff introduced the
item indicating the area was previously preliminary platted as a 20-lot subdivision
served by a cul-de-sac. Staff stated the current request was for 23-lots to be
served by a "hammer -head turnaround". Staff stated the request would involve a
variance to allow the increased length of the "hammer -head turnaround".
Public Works comments were discussed including a request for a drainage
easement to be shown across Lot 20. Staff questioned how the drainage would
3
FILE NO.: S-1042-V Cont.
be taken care of. Mr. White stated the applicant's intentions were to pipe the
water in this area around Lot 20 to allow Lot 20 to still be a viable lot.
Staff questioned if the three additional lots were critical. Mr. White stated the
three lots were critical to justify the spending of the funds to place the
infrastructure in the area. Staff stated 750-feet was the maximum length of a
minor residential street. Staff stated the sanitation department did not like to
exceed this length because of safety concerns with the backing of garbage trucks
further lengths. Staff stated since the length was so close to the allowable length
Staff could support the requested variance to allow an increase in the length.
There was a general discussion concerning the platted building line and existing
driveway grades within the previous development. Staff questioned if a 15-foot
building line would allow for less steep drives. Mr. White stated he would check
to see if this would offer flexibility. He questioned if 15-foot was allowable under
the hillside development standard. Staff stated the proposed lots did not meet
the minimum required 10,000 square feet.
Comments from the utilities were noted. Staff suggested the applicant contact
these agencies for additional information regarding their comments. Staff noted
fire hydrants would be required per code as stated by the Little Rock Fire
Department.
There were no additional items for discussion. The Committee then forwarded
the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised preliminary plat to Staff addressing the issues
raised at the Subdivision Committee meeting. The applicant has indicated a 15-
foot platted building line on all lots fronting onto Parliament Court or Lots 13 — 20
of Block 5 and 10 — 19 of Block 4. Staff feels due to the topography of the area
the reduced platted building line will allow for a better development of the homes
in the area with less of a grade for driveways.
The applicant has also indicated an increased length of the minor residential
street. The maximum length allowed per the Master Street Plan is 750-feet. The
applicant has indicated the length of the street to be 910-feet. This request will
have minor impact on the city sanitation department since without the traditional
cul-de-sac the garbage trucks will have to back the entire length of the street to
exit. There is some concern for safety in the backing of trucks that far and the
rounding of a curve in the process. The applicant has indicated a southern curve
radius to allow the truck a space to pull-out of traffic. Since the street only serves
17 lots there should be limited traffic on the street. Staff supports the requested
variance associated with the request to allow an increased length in the minor
residential street.
To Staff's knowledge, there are no other outstanding issues associated with the
proposed request. If developed in the manner proposed the development should
have minimal to no impact on the surrounding neighborhood.
0
FILE NO.: S-1042-V (Colt.
STAFF RECOMMENDATION:
Staff recommends approval of the proposed preliminary plat as filed subject to
compliance with the conditions outlined in paragraphs D, E and F of this report.
Staff recommends approval of the requested variance to allow a reduced platted
building line on Lots 13 — 20 of Block 5 and Lots 10 — 19 of Block 4.
Staff recommends approval of the requested variance to allow an increased
length of a minor residential street.
PLANNING COMMISSION ACTION: (MAY 1, 2003)
Mr. Joe White of White-Daters and Associates was present representing the application.
There were objectors present. Staff presented the item with a recommendation of
approval of the proposed preliminary plat, as filed, subject to compliance with the
conditions outlined in paragraphs D, E and F of the above report.
Staff presented a recommendation of approval of the requested variance to allow a
reduced platted building line on Lots 13 — 20 of Block 5 and Lots 10 — 19 of Block 4 and
Staff presented a recommendation of approval of the requested variance to allow an
increased length of a minor residential street.
Ms. Sarah Wacaster spoke in opposition of the proposed plat. She stated her home
was located on Lot 8 just north of the proposed development. She stated the site was
currently wooded and the trees acted as a buffer between the multi -family located south
of the proposed site. She stated when the lots were developed the view of the multi-
family would no longer be shielded and the noise level would increase. She stated with
the development of fewer lots then a larger buffer could be retained, which would assist
in the visual and noise concerns. She also questioned the sale -ability of the lots since
they would abut multi -family to the south.
Ms. Heather Metzler spoke in opposition of the proposed development. She questioned
the statement of the 10,000 square feet minimum lot size. Staff stated this related to
hillside development and if the lots did qualify for hillside development standards the
requested fifteen foot building line would be allowed by -right.
She also questioned the statement of backing of garbage trucks. Staff stated the
statement was incorrect and the trucks would turn -around in the hammer head. Staff
stated the turning around in a hammer head was more difficult than in a traditional cul-
de-sac.
There was a general discussion concerning the buffer to the south. Mr. White stated
the development of homes between the multi -family and the existing homes would act
as a buffer.
A motion was made to approve the requested preliminary plat and the requested
variances to include all staff recommendations and comments. The motion carried by a
vote of 10 ayes, 0 noes and 1 absent.
5