Loading...
HomeMy WebLinkAboutS-0285-X(4) Application11 IN 111 I III 2017039303 PRESENTED 06-21-201711 51 08AM RECORDED 06-21-2017 11 56 11 AM In Official Records of Larry Crane CircuiVCounty Clerk PULASKI CO, AR FEE $25.00 I -II � w NOTICE OF ADDITIONAL PROPERTY TO PARKLAND HEIGHTS SUBDIVISION PHASE 1E Parkland Heights Ranch Properties, LLC, files this Notice of Additional Property as written evidence and acknowledgement of the exercise of its rights to annex additional lands to become a part of Parkland Heights Subdivision pursuant to subsection ( c ) of Article AVI of the Bill of Assurance of Parkland Heights Subdivision filed and recorded in the official records of the Pulaski County Circuit/County Clerk's Office where the same appears as instrument number 2007045678 and having been subsequently amended by the Amendment to the Bill of Assurance of Parkland Heights Subdivision filed of record in the office of the Recorder od Pulaski County, Arkansas on or about May 21", 2008, as instrument number 2008035192 and Second Amendment to the Bill of Assurance of Parkland Heights Subdivision filed of record in the office of the Recorder of Pulaski County, Arkansas on July 281h, as instrument number 2008051608. The property to be annexed into Parkland Heights Subdivision is described in Exhibit "A" attached hereto (the "Property") Parkland Ranch Heights Properties, LLC, the sole owner of the Property, for and in consideration of the benefits accrued and to accrue to it, which benefits are hereby acknowledged to be of value, has caused a plat of the property, a copy of which is attached hereto as Exhibit "B", showing surveys made by Kyle Pennington of Hope Consulting, Inc., registered professional surveyor, and bearing a Certificate of Approval executed by the Little Rock Planning Commission, filed of record in the office of the Circuit Clerk and Ex Officio Recorder of Pulaski County, Arkansas, in Plat Book , Page the same to be hereby designed as, and to be hereafter referred to as, "Parkland Heights Subdivisior Phase 1E an Addition tothe City of Little Rock, Pulaski County, Arkansas". The Property described above and hereby annexed into Parkland Heights Subdivision shall be subject to the Bill of Assurance of Parkland Heights Subdivision, as amended, and subject to assessment to the same extent as if it were originally included in the Property on the date the Bill of Assurance was filed and recorded of record, and every deed of conveyance of any Lot or Tract therein describing the same by the number or numbers shown on the Plat shall be deemed a sufficient description thereof. PL AT ( ` t)3cj � p44 thda of u e 2017 MELANIE A GENTRY Arkansas - Saline County Notary Public - Comm# 12379607 My Commission ExpirPc Nov 5 ?0?0 My Commission Expires: _&)Oo, 5 , 2®Lf) NOTARY PUBLIC 'mayL r.,4j Ic.- Inc! -`:On of !ni-Mum 5`? n-:da. raquued { y L e (amity ^: Lillo Nock suhd:v,s'on fwr 1260n& Bili 4i P! tum—Ir'^ FrovisiL-r:s r.5M-.:shod b-w1h3 ci,rjefc.pr,r may exti+n-J Frilf: n ;^.} tvTu1a'j0M of 4M Fmk subdivision and :oriinglarrdinar-ces. {-j Utoo Flock Planning Ccrrac scion PARKLAND HEIGHTS RANCH PROPERTIES, LLC Title: ACKNOWLEDGEMENT On this 154"' day of June, 2017, before the undersigned, a Notary Public, duly commissioned, qualified and acting, within and for the County and State aforesaid, appeared in person within named Shabbir Dharamsey, to me personally well known, who stated that he was the manager of Parkland Heights Ranch Properties, LLC, a Florida limited liability company, and was duly authorized in his respective capacity to execute the foregoing instrument for in the name and behalf of said limited liability company, and further stated and acknowledged that he had so signed, executed and delivered the foregoing instrument for the consideration, uses, and purposes therein mentioned and set forth. IN TESTIMONY WHEREOF, I have hereunto set my hand and official seal this 15 day of June, 2017. My Commission Expires: :hs 1. Notary Public MELANIE A GENTRY — — Arkansas - Saline County Notary Public - Comm# 12379607 My Commission Expires Nov 5, 2020 EXHIBIT A TO NOTICE OF ADDITIONAL PROPERTY TO PARKLAND HEIGHTS SUBDIVISION PHASE 1E PART OF TRACT J, THE RANCH, AN ADDITION TO THE CITY OF LITTLE ROCK, PULASKI COUNTY, ARKANSAS, LOCATED IN THE NORTHEAST QUARTER, OF SECTION 14, TOWNSHIP 2 NORTH, RANGE 14 WEST, PULASKI COUNTY, ARKANSAS, MORE PARTICULARY DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHEAST CORNER OF LOT SEVEN (7), BLOCK ONE (1), PARKLAND HEIGHTS, PHASE 1A, AN ADDITION TO THE CITY OF LITTLE ROCK„ PULASKI COUNTY, ARKANSAS; THENCE NORTH 65 DEGREES 51 MINUTES 16 SECONDS EAST ALONG THE SOUTH LINE OF TRACT A, SAID BLOCK ONE (1) PARKLAND HEIGHTS, PHASE 1A, 102.13 FEET; THENCE NORTH 64 DEGREES 49 MINUTES 13 SECONDS EAST CONTINUING ALONG SAID SOUTH LINE, 102.14 FEET, TO A POINT ON THE WEST LINE OF LOT SIXTEEN (16), BLOCK ONE (1), PARKLAND HEIGHTS, PHASE ID; THENCE SOUTH 25 DEGREES 10 MINUTES 32 SECONDS EAST ALONG SAID WEST LINE AND ALONG THE WEST LINE OF LOTS SEVENTEEN (17), EIGHTEEN (18), NINETEEN (19), TWENTY (20), TWENTY ONE (21), AND TRACT D, SAID BLOCK ONE (1), PARKLAND HEIGHTS, PHASE 1D, 238.59 FEET TO THE SOUTHWEST CORNER OF SAID TRACT D, BLOCK ONE (1); THENCE SOUTH 66 DEGREES 55 MINUTES 57 SECONDS WEST ALONG THE NORTH LINE OF TRACT B, BLOCK ONE (1), PARKLAND HEIGHTS, PHASE 1A, 127.92 FEET; THENCE SOUTH 69 DEGREES 42 MINUTES 36 SECONDS WEST CONTINUING ALONG SAID NORTH LINE, 48.79 FEET; THENCE SOUTH 63 DEGREES 57 MINUTES 10 SECONDS WEST CONTINUING ALONG SAID NORTH LINE, 27.81 FEET, TO A POINT ON THE EAST LINE OF SAID TRACT A, BLOCK ONE (1), PARKLAND HEIGHTS, PHASE 1A; THENCE NORTH 25 DEGREES 10 MINUTES 32 SECONDS WEST ALONG SAID EAST LINE AND ALONG THE EAST LINE OF LOTS NINE (9), EIGHT (8) AND SEVEN (7), SAID BLOCK ONE (1), 231.98 FEET TO THE POINT OF BEGINNING. James, Donna From: Jonathan Hope <jonathanlhope@gmail.com> Sent: Wednesday, May 17, 2017 8:51 AM To: James, Donna Subject: Fwd: Entergy: notification and approval request ---------- Forwarded message ---------- From: NEUMEIER, BERNARD <BNEUMEI�?aa@entergy.com> Date: Fri, Apr 28, 2017 at 1:15 PM Subject: RE: Entergy: notification and approval request To: Jonathan Hope <ianathanlhope@,=ail.com> Jonathan, I sent an e-mail earlier related to the same piece of land. The attachments with the previous e-mail seemed to be telling me that this piece of land was to be used for 5 duplexes. The attachment which came with this e-mail looks like the property is being subdivided into 10 Lots (10A thru 1413). In either case my previous comments still apply.... "Entergy does not object to the plat and approves as long as you are aware that we do have existing buried facilities along part of the eastern edge of the property and part of the northern edge of the property (underground primary wire and a transformer). Any digging over or near our facilities should be done only after AR One Call is contacted and facilities are marked. Anything constructed on or over our facilities within the easement may need to be removed for Entergy to access their facilities for future maintenance reasons." Thanks, ,�etnatd o4reume&t Region Engineering Supervisor Entergy Arkansas, Inc. 8-721-5158 501-954-5158 501-954-5175 fax 501-733-0045 cell From: Jonathan Hope[mailto:jonathan!hope(agmall.com] Sent: Tuesday, April 25, 2017 2:01 PM To: NEUMEIER, BERNARD Subject: Fwd: Entergy: notification and approval request EXTERNAL SENDER. DO NOT click links, or open attachments, if sender is unknown, or the message seems suspicious in any way. DO NOT provide your user ID or password. ---------- Forwarded message ---------- From: Jonathan Hope c'onathanlho a ail.com> Date: Tue, Apr 25, 2017 at 1:58 PM Subject: Fwd: Entergy: notification and approval request To: "NEUMEIER, BERNARD" <BNEUMEI0a entergy.com> My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17-0057 Parkland FP Phase 1E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope www.hopeconsultina.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope www.hopeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope x www. hop eeonsu 1 t ing. can 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 It O - ,3 a *s. r � �, - - - - - % i f L _ 1 L v 1 - 'sz m 0L4 W- yxGr2=t i M C n 2' K lonmjLX — z James, Donna From: Vincent Hotho <Steven.Hotho@lrwu.com> Sent: Tuesday, April 25, 2017 5:04 PM To: Jonathan Hope Cc: James, Donna Subject: RE: LR Wastewater: notification and approval request If you wish to plat the units individually as you have shown, then a separate complete sewer service line is required for each unit, all the way to the main. Main extensions will also be required to service lots 10B and 11B as there is no main line adjoining those lots. A separate connection permit will be required for each connection. Thanks, Vince S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 M bl: 501.609.6332 From: Jonathan Hope fmailto:jonathanlhope@gmail.com] Sent: Tuesday, April 25, 2017 1:52 PM To: Vincent Hotho <Steven.Hotho@lrwu.com> Subject: LR Wastewater: notification and approval request My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17-0057 Parkland FP Phase 1E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope 19- www.hopeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 James, Donna From: Vincent Hotho <Steven.Hotho@lrwu.com> Sent: Friday, April 28, 2017 5:01 PM To: Jonathan Hope Cc: James, Donna Subject: RE: LR Wastewater: notification and approval request I don't see the main extension for the two inside units as referenced below. Please advise. S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 Mbl: 501.609.6332 From: Jonathan Hope [mailto:jonathanlhope@gmail.com] Sent: Friday, April 28, 2017 2:26 PM To: Vincent Hotho <Steven.Hotho @Irwu.com> Cc: djames@littlerock.gov Subject: Re: LR Wastewater: notification and approval request Vincent - Take a look at the revised drawings with your comments addressed. Thanks On Tue, Apr 25, 2017 at 5:03 PM, Vincent Hotho <Steven.Hotho@Irwu.com> wrote: If you wish to plat the units individually as you have shown, then a separate complete sewer service line is required for each unit, all the way to the main. Main extensions will also be required to service lots 10B and 11B as there is no main line adjoining those lots. A separate connection permit will be required for each connection. Thanks, Vince S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 Mbl: 501.609.6332 1 From: Jonathan Hope [mailto:ionathanlhope@gmail.com] Sent: Tuesday, April 25, 2017 1:52 PM To: Vincent Hotho <Steven.Hotho@lrwu.com> Subject: LR Wastewater: notification and approval request My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17-0057 Parkland FP Phase 1E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. 1 I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope w w w. h02econsu lti n a. com 117 South Market Street Benton, Arkansas 72015 Telephone: 501 315 - 2626 Sincerely, James, Donna From: Jonathan Hope <jonathanlhope@gmail.com> Sent: Friday, April 28, 2017 2:26 PM To: Vincent Hotho Cc: James, Donna Subject: Re: LR Wastewater: notification and approval request Attachments: 17-0057-Surface grading ultilities 4-27-17 B-SITE.pdf, 17-0057-Surface grading ultilities 4-27-17 B-grading.pdf Vincent - Take a look at the revised drawings with your comments addressed. Thanks On Tue, Apr 25, 2017 at 5:03 PM, Vincent Hotho <Steyen.HothoQlrwu.com> wrote: If you wish to plat the units individually as you have shown, then a separate complete sewer service line is required for each unit, all the way to the main. Main extensions will also be required to service lots 1 OB and I IB as there is no main line adjoining those lots. A separate connection permit will be required for each connection. Thanks. Vince S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 Mbl: 501.609.6332 From: Jonathan Hope [mailto: jonathanlhope@mg ail.com] Sent: Tuesday, April 25, 2017 1:52 PM To: Vincent Hotho <Steven.Hotho@lrwu.com> Subject: LR Wastewater: notification and approval request My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17-0057 Parkland FP Phase 1E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope 19- www.holzeconsultinz.coni 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope 1q- www.hopgconsultin,-z.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 2 James, Donna From: Floriani, Vince Sent: Tuesday, May 2, 2017 1:01 PM To: Jonathan Hope Cc: James, Donna; Harper, Vance Subject: RE: Public Works: notification and approval request Mr. Hope, Staff has reviewed the plat and have the following comments: 1. Revise the plat to reflect the floodplain and floodway as scaled from the effective FIRM which was adopted after the preliminary plat was approved; 2. Revise plat to provide the numerical finished floor elevation on each lot on the plat to conform with Chap 13 of the CLR Code of Ordinances which requires at least 1 ft of freeboard; 3. Development or fill within the floodway is prohibited. In accordance with Section 31-176, floodway areas must be shown as floodway easements or be dedicated to the City of Little Rock. In addition, a 25 ft access and maintenance easement is required adjacent to the floodway boundary; 4. Revise the floodplain statement on the plat. Vince Floriani, P.E. Little Rock Public Works -Civil Engineering 701 W. Markham St. Little Rock, Arkansas 72201 501-371-4817 From: Jonathan Hope [mailto:jonathanihope@gmail.com] Sent: Tuesday, April 25, 2017 1:58 PM To: Floriani, Vince Subject: Public Works: notification and approval request Mr. Floriani, My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17-0057 Parkland FP Phase 1E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope James, Donna From: Jonathan Hope <jonathanlhope@gmail.com> Sent: Wednesday, May 17, 2017 4:17 PM To: James, Donna Subject: Fwd: FW: AT&T: notification and approval request Attachments: 17-0057_PH 1 E LOTS_R-2 Parkland FP Phase 1 E (1).pdf ---------- Forwarded message ---------- From: MANION, JOSEPH E cim4138@.att.com> Date: Wed, May 17, 2017 at 4:11 PM Subject: FW: AT&T: notification and approval request To: Jonathan Hope <jonathanlhope@gmail.com> I was able to go look at this today. AT&T approves this plat. From: Jonathan Hope[mailto:ionathanlhope@gmail.com] Sent: Tuesday, May 16, 2017 2:39 PM To: MANION, JOSEPH E <imt 4138 a@att.com> Subject: Re: AT&T: notification and approval request Let me know if you can approve this plat for the city. Thanks On Tue, May 16, 2017 at 8:34 AM, jonathan hope < onathanlhope r@@gmail.com> wrote: Any update on the infrastructure for AT&T on this Block? On May 11, 2017, at 8:05 AM, jonathan hope <jonathanlhope@gmail.com> wrote: Our project is on the block that says "Phase 1B" on your drawing, which is not showing anything on your drawing. On Tue, May 9, 2017 at 1:03 PM, MANION, JOSEPH E <jm413$Q9t.com> wrote: I have added a file showing our job that placed the cable originally. If we need to meet on site I can work that out. Thank You, (70sep4 /ffavr w AT&T Mgr. Engineering/Design 501-373-8892 From: KEATHLEY, CHRIS Sent: Wednesday, April 26, 2017 8:54 AM To: MANION, JOSEPH E <im4138@att.com> Cc: ionathanlhope@�mail.com Subject: FW: AT&T: notification and approval request Joseph.... Would you check this out for Jonathan please? Thanx Chris Chris Keathley Lead 05P Ping & Eng bsgn 501.373.6594 0 501.615.5823 C From: Jonathan Hope fmaiito:jonathanlhope@gmail.comj Sent: Tuesday, April 25, 2017 1:56 PM To: Chris.Keathle att.com Subject: AT&T: notification and approval request My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17-0057 Parkland FP Phase 1E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). f I I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope www.h2peconsulting.com 1I 117 South Market Street I Benton, Arkansas 72015 Telephone: (501 ] 3 E 5- 2626) 3 E 5- 2626 C Sincerely, Jonathan Hope www.hopeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501 ) 315 - 2626 Sincerely, Jonathan Hope www.hopeconsultinp,.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501)_3.15 - 2626 Sincerely, Jonathan Hope www.hopeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 . ........ ............ ... is 1, mmm (L N 4 <4 James, Donna From: Jonathan Hope <jonathanlhope@gmail.com> Sent: Wednesday, May 24, 2017 12:56 PM To: James, Donna Subject: Fwd: Central Arkansas Water: notification and approval request ---------- Forwarded message ---------- From: Jason Lowder <Jason.Lowder@carkw.com> Date: Wed, May 24, 2017 at 12:54 PM Subject: RE: Central Arkansas Water: notification and approval request To: Jonathan Hope <'onathanlho a mail.com> Central Arkansas Water approves with no comments. Jason Lowder, Engineering Technician iaso n. lowde r @ ca rkw. co m 501-377-1245 XzWker 11609DOlm From: Jonathan Hope [mailto:jonathanlhope@gmail.com] Sent: Wednesday, May 24, 2017 8:30 AM To: Jason Lowder Subject: Re: Central Arkansas Water: notification and approval request See attached. Thanks On Wed, May 24, 2017 at 8:27 AM, Jason Lowder <Jason.Lowder@,carkw.com> wrote: No attachments were sent. Please resend the revised plans for approval. Jason Lowder, Engineering Technician kaaajgKder@carkw.com n.lowder@ca rkw.com 501-377-1245 a+asYYc��I" DeeritrldDoo�lm� From: Jonathan Hope [mailto: onathanihopeC@gmail.com) Sent: Tuesday, May 23, 2017 9:43 AM To: Jason Lowder Subject: Re: Central Arkansas Water: notification and approval request Are the revised drawings acceptable? Thank you Jason! On Wed, May 17, 2017 at 8:48 AM, Jonathan Hope <jonathanlhope@7a grnaiLcorn> wrote: Please find the attached revised drawings. On Wed, Apr 26, 2017 at 3:42 PM, Jason Lowder <Jason.Lowderpcarkw.com> wrote: Jonathan, All of the mains in this development are in a 10' easement. Please include them on the plat and return for approval. Jason Lowder, Engineering Technician 0ason.lowder@carkw.com 501-377-1245 From: Jonathan Hope[ma iIto: ionathanlhope(agmail.com] Sent: Tuesday, April 25, 2017 1:20 PM To: Jason Lowder Subject: Central Arkansas Water: notification and approval request Mr. Lowder, My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17-0057 Parkland FP Phase 1 E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope www.hopeconsu ltm�.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope www.liapeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope www.hapecansu lting.c_om 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope www.hopeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope Ej www.hopeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 James, Donna MMEMEN From: Jonathan Hope <jonathanlhope@gmail.com> Sent: Monday, May 22, 2017 2:30 PM To: Vincent Hotho Cc: James, Donna Subject: Re: LR Wastewater: notification and approval request Attachments: 17-0057-Surface grading ultilities 5-9-17-SITE.pdf, 17-0057-EX. SEWER UTILITY.pdf Sorry Mr. Hotho, This did not affect sewer but I did want you to be reviewing the most up to date plat. On Mon, May 22, 2017 at 2:24 PM, Vincent Hotho <Steven.Hotho rC�i�.lrw-Li wrote: We require a 10' clearance between sewer and all other utilities, including storm drainage. How does a little more easement for Centerpoint account for this? Does it allow the required separation? S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 Mbl: 501.609.6332 From: Jonathan Hope[mailto:'onathanlhope(a7gmaii.com] Sent: Monday, May 22, 2017 1:08 PM To: Vincent Hotho <Steven.HothoC trwu.com>; James, Donna <DJames@littlerock.grg� Subject: Re: LR Wastewater: notification and approval request We have added a little more easement for Centerpoint. Let me know your thoughts. Thanks On Wed, May 17, 2017 at 8:47 AM, Jonathan Hope <jonathanihope@p-mail.com> wrote: See attached Revised drawings. Thank you! On Fri, Apr 28, 2017 at 5:00 PM, Vincent Hotho <Steven.Hotho lrwu.com> wrote: I don't see the main extension for the two inside units as referenced below. Please advise. I S. Vincent Hotho, P.E. i Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 Mbl: 501.609.6332 From: Jonathan Hope[mailto:jonathanlhopeoamail.com] Sent: Friday, April 28, 2017 2:26 PM To: Vincent Hotho <Steven.Hotho lrwu.com> Cc: diames@ ittlerock.gov Subject: Re: LR Wastewater: notification and approval request i Vincent - Take a look at the revised drawings with your comments addressed. Thanks On Tue, Apr 25, 2017 at 5:03 PM, Vincent Hotho <Steven.Hotho�,ia,lrwu.corn> wrote: If you wish to plat the units individually as you have shown, then a separate complete sewer service line is required for each unit, all the way to the main. Main extensions will also be required to service lots 1 OB and 11B as there is no main line adjoining those lots. A separate connection permit will be required for each connection. i Thanks, Vince S. Vincent Hotho, P.E. 2 Program Supervisor Little Rock Wastewater Utility Ofc:501.688.1452 Mb1: 501.609.6332 From: Jonathan Hope [mailto:jonathanlhope@°a. Mail.com] Sent: Tuesday, April 25, 2017 1:52 PM To: Vincent Hotho <Steven.Hotho cr rwu.com> Subject: LR Wastewater: notification and approval request My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17- + 0057 Parkland FP Phase 1E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). i ;I I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope www_. nopeconsu icina.com 117 South Market Street Benton, Arkansas 72015 9 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope www.nopeconsuitlpz.com I I 117 South Market Street I Benton, Arkansas 72015 Telephone: (501) 315 _ 2626 11 i Sincerely, Jonathan Hope 119 ` www.hopecotisultinp-.com 117 South Market Street 4 Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope IHI www.hopeconsu Itin- 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope 15- www.hopeconsultin.g.com 11South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 6i James, Donna From: Vincent Hotho <Steven.Hotho@lrwu.com> Sent: Monday, May 22, 2017 2:25 PM To: Jonathan Hope; James, Donna Subject: RE: LR Wastewater: notification and approval request We require a 10' clearance between sewer and all other utilities, including storm drainage. How does a little more easement for Centerpoint account for this? Does it allow the required separation? S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 M bl: 501.609.6332 From: Jonathan Hope[mailto:jonathanlhope@gmail.com] Sent: Monday, May 22, 2017 1:08 PM To: Vincent Hotho <Steven.Hotho@lrwu.com>; James, Donna <DJames@littlerock.org> Subject: Re: LR Wastewater: notification and approval request We have added a little more easement for Centerpoint. Let me know your thoughts. Thanks On Wed, May 17, 2017 at 8:47 AM, Jonathan Hope <ionathanihooe@gmail.com> wrote: See attached Revised drawings. Thank you! On Fri, Apr 28, 2017 at 5:00 PM, Vincent Hotho <Steven.Hotho@Irwu.com> wrote: I don't see the main extension for the two inside units as referenced below. Please advise. S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 M bl: 501.609.6332 From: Jonathan Hope[mailto:ionathanlhopeC@gmail.com] Sent: Friday, April 28, 2017 2:26 PM To: Vincent Hotho <Steven.Hotho@Irwu.com> 1 Cc: d i a rn es@ Iittlerock .gov Subject: Re: LR Wastewater: notification and approval request Vincent - Take a look at the revised drawings with your comments addressed. Thanks On Tue, Apr 25, 2017 at 5:03 PM, Vincent Hotho <Steven.Hotho@lrwu.com> wrote: If you wish to plat the units individually as you have shown, then a separate complete sewer service line is required for each unit, all the way to the main. Main extensions will also be required to service lots 1013 and 1113 as there is no main line adjoining those lots. A separate connection permit will be required for each connection. Thanks, Vince S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 Mbl: 501.609.6332 From: Jonathan Hope[mailto:fonathanlhope@gmail.com] Sent: Tuesday, April 25, 2017 1:52 PM To: Vincent Hotho <Steven.Hotho@lrwu.com> Subject: LR Wastewater: notification and approval request My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17-0057 Parkland FP Phase 1E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. 2 i I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope www.tiopeconsititing.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 f Sincerely, Jonathan Hope _www. ho pe con su It i ng.com 117 South Market Street 91 Benton, Arkansas 72015 Telephone: ( 01) 315 - 2626 Sincerely, Jonathan Hope 19- www.ligpeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope IN.- www.hol2econsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 ki James, Donna From: Jonathan Hope <jonathanlhope@gmail.com> Sent: Monday, May 22, 2017 2:09 PM To: James, Donna Subject: Fwd: Fw: Arkla: notification and approval request ---------- Forwarded message ---------- From: Townsend, Andrew W<andrew.townsend@cent=ointenergy.comma Date: Mon, May 22, 2017 at 2:06 PM Subject: RE: Fw: Arkla: notification and approval request To: Jonathan Hope cjonathanlhopei AMait.com> Jonathan, Thanks for the adjustment, the proposed plat is approved. Please be advised the developer should schedule removal of the existing Centerpoint pipeline before any construction begins. Thank you, Andrew W Townsend Engineer II 1 Southern Gas Operations I Arkansas/Oklahoma Region 401 W. Capitol Ave, Suite 600 1 Little Rock, AR 72201 Office:501.377-4679 1 Fax:501-377-4733 1 Mobile:501-519-1836 Andrew.TownsendO-Centemointenergv.cam 1 From: Jonathan Hope[mailto:ionathan[hopeC(a)gmail.com] Sent: Monday, May 22, 2017 11:08 AM To: Townsend, Andrew W Subject: Fwd: Fw: Arkla: notification and approval request Andrew, See attached revised plan with additional easement. IS this acceptable to receive a recommendation to L.R.? ---------- Forwarded message ---------- From: Brian Johnson cbrian@hopeconsulting.biz> Date: Mon, May 22, 2017 at 10:55 AM Subject: Fw: Arkla: notification and approval request To: Jonathan Hope <jonathanlhope@&mail.com> From: Brian Johnson Sent: Monday, May 22, 2017 10:13 AM To: Jonathan Hone Subject: Re: Fwd: Arkla: notification and approval request From: Jonathan Hope Sent: Monday, May 22, 2017 8:30 AM To: Brian Johnson Subject: Fwd: Arkla: notification and approval request Please add this additional easement to plat and send it back to me asap. ---------- Forwarded message ---------- From: Townsend, Andrew W <andrew.townsend@centerpointenergy.com> Date: Thu, May 18, 2017 at 2:34 PM Subject: RE: Arkla: notification and approval request To: Jonathan Hope <jonathanlhope@gmail.com> Jonathan, In order to ensure the proper serving of natural gas to the new planned buildings, I would request an additional 5' easement and setback be included as indicated on the attached plat. I would also recommend this location for installing gas service to those buildings. Thank you, Andrew 'W. Tmvnsend- Engineer II 1 Southern Gas Operations I Arkansas/Oklahoma Region 401 W. Capitol Ave, Suite 600 1 Little Rock, AR 72201 Office:501-377.4679 1 Fax:501-377-4733 1 Mobile:501-519-1836 Andrew.Townsend AGenternoi nten erqy-com L'�I�e►Pb�iot Energy From: Jonathan Hope[ma iIto: jonathanihopeOgmail.com] Sent: Wednesday, May 17, 2017 8:53 AM To: Townsend, Andrew W Subject: Re: Arkla: notification and approval request Please find the revised plat. Let me know if you approve so we can get this through the city. Thanks 3 On Fri, May 5, 2017 at 11:03 AM, Townsend, Andrew W <andrew.townsend cente ointener .comma wrote: Jonathan, As I have reviewed the proposed changes, I agree existing Centerpoint Energy facilities will need to be relocated. I see two issues with this: 1.) 1 do not see a dedicated utility easement for the relocation of those facilities so they may serve the new buildings. 2.) The costs to relocate our facilities will likely be incurred by the developer. Thank you, Andrew W. Tmwend Engineer II 1 Southern Gas Operations I Arkansas/Oklahoma Region 401 W. Capitol Ave, Suite 600 1 Little Rock, AR 72201 Office:501-377a9679 I Fax:501-377-4733 1 Mobile:501-519-1836 And rew.Towns and Cal Ce me rp o inte nerd v. com 4D cenfwfthm. &erg From: Jonathan Hope[ma iIto: ionathanlhope(o)gmail.com] Sent: Friday, May 05, 2017 9:11 AM To: Townsend, Andrew W Subject: Re: Arkla: notification and approval request Andrew, Do you have any issues with our plat? 4 On Tue, Apr 25, 2017 at 1:53 PM, Jonathan Hope cionathanlhopeQginail.com> wrote: My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17-0057 Parkland FP Phase 1E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope 19, WWWAl❑ econsultin .co111 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope 15! www.hopeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 _ 2626 ***** This email is from an external sender outside of the CenterPoint Energy network. Be cautious about clicking links or opening attachments from unknown sources. ***** Sincerely, Jonathan Hope 15-- www.hopeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501 ) 315 - 2626 Sincerely, 6 Jonathan Hope 191-1 www.liopecolisultin2.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Virus -free. www.av, Sincerely, Jonathan Hope 19- www.bopeconsulting.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope 19-- www. hopeconsultina.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 James, Donna From: Jonathan Hope <jonathanlhope@gmail.com> Sent: Monday, May 22, 2017 1:08 PM To: Vincent Hotho; James, Donna Subject: Re: LR Wastewater: notification and approval request Attachments: 17-0057_PH 1 E LOTS_R-3 Parkland FP Phase 1 E.pdf We have added a little more easement for Centerpoint. Let me know your thoughts. Thanks On Wed, May 17, 2017 at 8:47 AM, Jonathan Hope <jonathanlhope�?a�,gmail.com> wrote: See attached Revised drawings. Thank you! On Fri, Apr 28, 2017 at 5:00 PM, Vincent Hotho <Steven.Hotho(a@lrwu.co_m> wrote: l I don't see the main extension for the two inside units as referenced below. Please advise. S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 I' Mbl: 501.609.6332 I From: Jonathan Hope [mailto:'onathanlho a mail.com] Sent: Friday, April 28, 2017 2:26 PM To: Vincent Hotho <Steven.Hotho@,Irwu.com> Cc: diames(a@littlerock.gov Q Subject: Re: LR Wastewater: notification and approval request Vincent - Take a look at the revised drawings with your comments addressed. Thanks , On Tue, Apr 25, 2017 at 5:03 PM, Vincent Hotho <5teven.Hotho@lrwu.com> wrote: 1 If you wish to plat the units individually as you have shown, then a separate complete sewer service line is required for each unit, all the way to the main. Main extensions will also be required to service lots 1 OB and 11B as there is no mainline adjoining those lots. A separate connection permit will be required for each connection. Thanks, Vince S. Vincent Hotho, P.E. Program Supervisor Little Rock Wastewater Utility Ofc: 501.688.1452 Mbl: 501.609.6332 From: Jonathan Hope[mailto:jonathanlhope@gmail.com] Sent: Tuesday, April 25, 2017 1:52 PM To: Vincent Hotho <Steven.Hotho@,1rwu.com> Subject: LR Wastewater: notification and approval request My firm is platting the last Phase in Parkland Heights 1E. I have attached the Proposed Final Plat below(17-0057 Parkland FP Phase 1E). I have attached an existing overall survey of Parkland Heights(17-0057 Parkland Overall Survey). I have also attached a proposed Site Plan and Utility Plan of the future work to be done on site. Some of the existing Utilities will be abandoned or moved into easements. I am asking for your approval along with the other utilities to move forward with the approval of this plat. Contact me if you have any questions!! Sincerely, Jonathan Hope www. hopeconsulting.com 117 South Market Street 1 Benton, Arkansas 72015 Telephone: (501) 315 - 2626 Sincerely, Jonathan Hope www.hopeconsulting.com 1 i 117 South Market Street Benton, Arkansas 72015 I Telephone: (501) 315 - 2626 I 91 Sincerely, Jonathan Hope N! www.hopeconsultin .c�om 117 South Market Street Benton, Arkansas 72015 Telephone: 501 315 - 2626 Sincerely, Jonathan Hope 15. www.hopeconsultin,o,.com 117 South Market Street Benton, Arkansas 72015 Telephone: (501) 315 - 2626 L.iWe Rack June 6, 2017 Mr. Will McFadden, P.E. Hope Consulting 117 S. Market St. Benton, AR 72015 RE: Approval Letter for Project: Parkland Heights 127-2-1715 Dear Mr. McFadden: Little Rock Wastewater (LRW)has reviewed the above referenced plans. They are approved as submitted with one (1) copy being returned to you for your files with this letter. Approval is being granted to the applicant to construct and install a sewer main extension. The applicant shall be responsible for any and all costs associated with the installation of the sewer main extension in order to obtain wastewater service from the Little Rock Wastewater. Please be advised that this approval is based upon signed acceptance of and compliance by the Applicant (Owner) with the following conditions. 1. All significant changes in the plans (i.e., changes in alignment, grade, pipe size, materials, or in the function of the project) for the proposed construction must be approved prior to construction, and all construction shall comply with the applicable requirements and specifications of the latest edition of the Little Rock Wastewater Standard Specifications For Sewer Construction In The City of Little Rock which may be found at littu:llwww.Irwu-co niIspecs . 2. Continuous project responsibility by the engineer is an express condition of this plan approval. Reference is made to Part 4 of Section 01100 Standard Specifications For Sewer Construction In The City of Little Rock. 3. The name of the Resident Inspector shall be furnished to LRW prior to the start of construction. No construction may begin until this Approval Letter is acknowledged by the Applicant (Owner) and returned to LRW along with any applicable charges shown on Page 3 of this Approval Letter. 4. This Approval Letter shall be in force for a period of one (1) year. If construction of the project has not begun by,June 6. 2018, then LRW's approval of the project will expire. No fees paid to Little Rock Wastewater for this project shall be reimbursed should the project approval expire. 5. Sanitary sewer lines shall be kept a minimum horizontal distance of S' from all underground utilities (Including Storm Drainage) except water lines, which shall be kept a minimum distance of 10' from sanitary sewer lines. 11 Clearwater Drive I Little Rock, AR 72204 1 501-376-2903 1 www.Irwu.com June 6, 2017 6. Connection of the proposed sewer main to the existing sewer main shall not be made until the proposed sewer main has been tested, inspected, and accepted by LRW. The applicant shall convey title to the sewer main extension together with all necessary easements, free and clear of all liens and encumbrances, by the appropriate documents. All Final Paperwork must be submitted to LRW prior to the connection of the proposed sewer mains being made. 7. Ductile Iron Pipe shall be used on this project as shown on plans and any time the cover to the existing or proposed ground is less than thirty inches (30") or where clearance between twd pipes is less than eighteen inches (18"). It shall be the Engineer's and the Contractor's responsibility to check the depth of cover and the clearance. 8. All Existing and Proposed Manholes shall be located outside of the top bank of all existing or proposed ditches and shall be at such an elevation as not to allow rainwater entry during periods of normal rainfall. Manholes with a difference in elevation of two feet or greater shall be a Drop Manhole unless approved by LRW. Manhole Steps are not allowed in Little Rock Wastewater Standard Specifications For Sewer Construction In The City of Little Rock. 9. All sewer mains shall be constructed within easements meeting Utility Specifications or in a public right of way. Minimum width of proposed easement shall be ten (10') feet (or the depth of cover whichever is greater) and shall be equal distance either side of the sewer main as constructed. 10. No sewer main may be constructed under or within ten feet of any existing detention basin or any detention basin being constructed for this project. 11. All buildings must be capable of being served by gravity sewer service. If minimum floor elevations are required, it is the responsibility of the Developer to notify the builder or Owner to assure gravity service is maintained. Individual pump stations will not be accepted without LRW approval. This includes basement floor elevations. 12. Applicant agrees to obtain all necessary permits and approvals from all other governing agencies including any applicable Improvement District prior to the start of construction. APPLICANT SHOULD MAKE AN INDEPENDENT DETERMINATION of the existence, status or amount of any fees which may be due to third parties (such as Improvement Districts) which may be owed to the third party in addition to those fees due to LRW for sewer lines and or sewer facilities installation proposed by applicant. LRW and the Little Rock Water Reclamation Commission have no such information of amounts due third parties, if any, and assume no responsibility for furnishing such information to Applicant and expressly disclaim any such duty or liability of any nature whatsoever arising out of Applicant's failure to make that determination. 13. This approval applies only to that portion of the proposed sewer mains which are to be dedicated to the public, however all other sewer line work must also comply with Little Rock Wastewater Standard Specifications. June 6, 2017 Special Conditions 1. Applicant agrees to pay the following charges prior to start of construction of the project: N/A Approval of this project is conditioned upon the Applicant's (Owner) signed acceptance of and compliance with the above -referenced conditions. It shall be the Engineer's responsibility to notify the Applicant (Owner) and the Contractor of all the items mentioned above. Failure to notify the Applicant of any of the items mentioned above does not relieve the Applicant from constructing the project in accordance with Little Rock Wastewater Standard Specifications and the terms of this Approval Letter. If you have any questions concerning this matter, I may be reached by telephone at the numbers listed below. Sincerely, LITTLE ROCK W EWATER V [cent Hoth , P.E. Proiram Supervisor Department of Engineering Services Office Phone 501-688-1452 Cell Phone 501-609-6332 Email vii�c�_it:�elin t� 17 �v��.ccm cc Vern Stubbs, Construction Inspector enc. Acknowledgement: Applicant (Owner) Print Name 3