Loading...
HomeMy WebLinkAboutS-0285-CC Staff AnalysisJune 26, 1997 ITEM NO.: 5 FILE NO.: 5-285-CC NAME: Cypress Point Subdivision - The Ranch Preliminary Plat LOCATION: North and east of Ranch Blvd. DEVELOPER: ENGINEER• Ranch Properties, Inc. Joe White 900 South Shackleford White-Daters and Associates Little Rock, AR 401 South Victory Street Little Rock, AR 72201 AREA: 12.42 acres NUMBER OF LOTS: 34 FT. NEW STREET: 1,200 LF ZONING: R-2 PLANNING DISTRICT: #1 River Mountain CENSUS TRACT: 42.05 VARIANCES/DEFERRAL WAIVER: 4 Open ditch section on Ranch Blvd. A. PROPOSAL• To subdivide 12.42 acres into 34 single family residential lots. A large lake is also planned. B. EXISTING CONDITIONS: The site is vacant pasture land. C. NEIGHBORHOOD COMMENTS: Staff has received no public comments on this preliminary plat. D. ENGINEERING COMMENTS: PUBLIC WORKS CONDITIONS: 1.Lots 233 and 234 of Cypress Pt. Addition are platted as Lots 4 and 5 of Ranch Addition. 2.A grading permit and development permit for special flood hazard area are required prior to construction. Minimum floor elevations will be required on lots with floodplain on lot limits. June 26, 1997 SUBDIVISION ITEM NO.: 5 Cont_ FILE NO.: S-285-CC 3. Construct Ranch Boulevard to collector standards with curb and gutter and sidewalk. Radii and tangent distance appear to be less than required by the Master Street Plan. Show street profiles showing existing and proposed centerlines. 4. Provide Preliminary Plan for Buckland Road extension and temporary turn -a -round at end. 5. Stormwater detention ordinance applies to this property. 6. Prepare letter for street lights as required by Sec. 31- 403. 7. Utility excavation within proposed rights -of -way shall be per Article V of Section 30. 8. Contact the USACE-LRD for approval prior to start of work. Contact the ADPC&E for approval prior to start of work. 9. Addition will add 340 trips per day to Ranch Boulevard traffic. E. UTILITIES• Wastewater: Sewer main extension required with easements. Protection or relocation of existing sewer mains will be required due to construction of lakes. AP&L : No Comment. Arkla: No Comment. Southwestern Bell: No Comment. Water: Water main extensions required. Fire Department: Provide 50 foot radius. Place new hydrants per code. CATA: N/A F. ISSUES/TECHNICAL/DESIGN: Issues: • Who will maintain lake? What uses are proposed in respect to the lake? Will individual parcels have boat docks? Planning Division: N/A Landscape: N/A G. ANALYSIS: The major questions concerning the plat have been answered. However, staff needs clarification of the lake element of the project. Planning Staff is taking no position on the variance request to allow open ditch section on Ranch Blvd. il� June 26, 1997 SUBDIVISION ITEM NO.: 5 (Cont.) FILE NO.: S-285-CC H. STAFF RECOMMENDATIONS: APPROVAL of the preliminary plat based on conditions in paragraphs D and E of this report. SUBDIVISION COMMITTEE COMMENT: (JUNE 5, 1997) Joe White presented the project to the Committee. Planning Staff requested the following information: e Dimension all lots ® Show phasing lines. ■ Provide more information on proposed lake. • Existing sewer line will run through proposed lake. The group discussed the developer's request to use an open ditch section on Ranch Blvd. The item was referred to the Planning Commission meeting on June 26, 1997 for determination. PLANNING COMMISSION ACTION: (JUNE 26, 1997) This preliminary plat was included in the Consent Approval agenda. Motion to approve passed with 7 ayes, 0 nays, and 4 absent. 3