HomeMy WebLinkAboutS-0285-U Staff AnalysisNovember 29, 1994
ITEM NO.: 16 FILE ND • S-285-T
NAME: SADDLE CREEK APARTMENTS -- SITE PLAN REVIEW
LOCATION: Approximately 0.4 mile north of Highway 10, between
Chenonceau Blvd. and Patrick County Rd.
DEVELOPER:
RANCH PROPERTIES, INC.
P. O. Box 56350
Little Rock, AR 72215
224-9600
AREA• 14.97 ACRES
ZONING: MF-18 & R-2
PLANNING DISTRICT: 20
CENSUS TRACT: 42.05
ENGINEER:
WHITE-DATERS & ASSOCIATES, INC.
401 S. Victory St.
Little Rock, AR 72201
374-1666
NUMBER OF LOTS: 1 FT. NEW STREET: 0
PROPOSED USES: Multi -Family Residential
VARIANCES RE VESTED: Deferral of the required Master Street Plan
improvements for Patrick Country Road, and a waiver of the
requirement to construct the bridge spanning the creek on Patrick
Country Road.
STATEMENT OF PROPOSAL:
The applicant proposes the development of a 260-unit apartment
complex on a 14.6 acre site. The site is zoned MF-18, with a 20
foot wide strip of R-2 zoned land lying along the north property
line which is be used as a buffer area. The project will consist
of the construction of 13 apartment buildings with a total square
footage of 225,000 square feet, plus a clubhouse building and a
mail building. Of the apartment buildings, 3 are to be two
stories in height and 10 are to be three stories. Parking for
520 vehicles is proposed, with 260 of these space to be covered.
The development is to be divided into 2 phases, with Phase I
involving the construction of 9 buildings containing 188 units,
and the clubhouse. Phase II involves the construction of 4
buildings containing 72 apartment units. The time -frame for
construction of the 2 phases in not determined, since development
of the second phase will depend on the market and financial
conditions which develop. No access is proposed to be taken to
the west, to Patrick Country Rd., and a deferral of the required
street improvements for Patrick Country Rd. is requested. The
required right-of-way for this road, however, is proposed to be
dedicated. A wavier of the requirement to construct the bridge
which spans the creek which crosses Patrick Country Rd. is
requested.
November 29, 1994
SUBDIVISION
ITEM NO. 16 (Continued) _ FILE NO. 5-285--T
A. PROPOSALIREOUEST:
Approval by the Planning Commission of the site plan for the
Saddle Creek Apartment complex is requested.
(Note: Since the proposal involves approval of a
preliminary plat as a separate issue, and since the
requested variance and wavier are being considered as a part
of the preliminary plat item, there is no need to address
these variance and waiver issues as a separate issue in this
request. There is, however, a need to make the approval of
the site plan conditioned on the approval by the Board of
Directors of the variance and waiver.)
B. EXISTING CONDITIONS:
The site is undeveloped and wooded. The topography is
rolling, dropping generally to the south from an elevation
along the north property line of approximately 270-300 feet
MSL (Mean Sea Level) to 265-270 feet MSL along the southern
boundary of the lot. There is a creek lying along the south
boundary of the proposed lot.
The existing zoning of the majority of the site is MF-18,
although there is a 20 foot wide strip of R-2 land lying
along the north boundary of the lot.
C. ENGINEER_T GLUTILITY CONTENTS:
Public Works comments that: 1) the minimum drainage
requirements (pursuant to Section 31 of the Code) are not
met by the site layout as presented; 2) one-half street
improvements will be required for Patrick Country Rd., and
this street must be developed to the standards of a
collector street of a 36 foot wide street with a sidewalk,
and the full width of the bridge spanning the creek which
crosses Patrick country Rd. must be built; 3) the Base Flood
elevation at this site is approximately 264 NGVD, and the
floodplain encroaches on this property (Note: Contact
Public Works, ADPC&E, AND USAGE-LRD prior to beginning any
site work.); 4) both vertical and horizontal roadway
alignment for Chenonceau Blvd. must be verified to assure
adequate sight distance; and, 5). street plan, stormwater
detention, and boundary survey information will be required.
Water Works comments that a water main extension will be
required in order to serve this property. On -site fire
protection will be required.
Wastewater comments that a capacity analysis will be
required. Capacity contribution fees, Hinson Reimbursement
2
November 29, 1994
SUBDIVISION
ITEM NO.: 16 (Continued_ _FILE NO.: 5-285-T
Fees, The Ranch Reimbursement Fees, and Chenal North Slope
Reimbursement Fees will be assessed.
Arkansas Power and Light Co. comments that 15 foot easements
will be required along all four boundaries of the site.
Arkansas Louisiana Gas Co. approved the submittal without
comment.
Southwestern Bell Telephone Co. approved the submittal
without comment.
The Fire Department will require additional fire hydrants
for this complex.
Landscape review comments that the proposed buffer width
along Chenonceau Blvd. drops below the 30 foot width
required. The minimum requirement is 20 feet. A portion of
the proposed buffer drops -to a width of 5 feet. A 6 foot
high opaque screen is required along the northern site
perimeter. This screen may either be a "good neighbor" wood
fence, or be dense evergreen plantings.
D. ISSUESLIJGALLTECHNICAL/DESIGN:
The applicant proposes 2 phases for the development. The
second phase is the portion of the development which lies
along the west boundary of the site. The required
improvements for Patrick Country Rd. would not be required
until the Phase 2 development begins. However, the
applicant may construct the entire project at one time, and
is seeking, as part of the preliminary plat approval, a
deferral of the Patrick Country Rd. improvement requirements
and a wavier of the requirement to construct the bridge over
the creek in Patrick Country Rd.
There are issues regarding buffer widths and screening which
remain to be resolved.
E. ANALYSIS•
The site plan which has been submitted meets the technical
requirements of the ordinance; however, there are the issues
of buffer width along the Chenonceau Blvd. frontage and of
the street and bridge improvement requirements to be
resolved.
F. STAFF RECOMMENDATIONS:
Staff recommends approval of the site plan, subject to the
applicant meeting the requirements for landscape and land
use buffering, and subject to the Board of Directors
3
November 29, 1994
SUBDIVISION
ITEM NO.: 15 (Continued) FILE NO.: S-285-T
approving the requested deferral and waiver, or the
applicant complying with the Master Street Plan
requirements.
SUBDIVISION COMMITTEE COMMENT: (NOVEMBER 10, 1994)
Mr. Joe White, with White-Daters & Associates, Inc., the project
engineering firm, was present. Mr. White reviewed the comments
continued in the discussion outline. The Public Works staff
person outlined the Public Works concerns, and Mr. White, the
Public Works staff person, and the Committee members discussed
the concerns. Mr. White indicated that it was the developers
understanding that the bridge construction would be the City's
responsibility, and that the developer was proposing to defer
constructing one-half collector street improvements until the
City built the bridge. Mr. White indicated that he would need to
discuss this issue with the applicant in more detail. The
Committee forwarded the proposed plat to the full Commission for
the public hearing.
PLANNING COMMISSION ACTION: (NOVEMBER 29, 1994)
Staff reported that there are no outstanding technical issues to
resolve. The applicant, staff reported, has requested a 5 foot
height variance for the buildings, so that the apartment
buildings may be three-story buildings, and explained that the
variance is minimal. Staff recommended approval of the variance.
The item, approval of the site plan and a recommendation of
approval of the height variance, was included on the consent
agenda for approval and was approved with the vote of 10 ayes,
0 nays, 1 absent, and 0 abstentions.