HomeMy WebLinkAboutS-0045-A-78 ApplicationCIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
FINAL PLAT NAME: SETTLER'S SUBDIVISION LOTS 1R, 2R & 3R
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
y All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
Certain Improvements remain uncompleted and a punch list has been prepared and sent.
Engineering Specialist Date:
ADDRESSING SPECIALIST REPORT
I have reviewed the plat and find that the street names and street configuration are acceptable.
Addressing Specialist Date:
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
All streetlight installation, striping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
street signs should be ordered and billed to developer. Work orders have been prepared for signage.
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Approved engineering drawings for streetlight system have been receives., and approved. Applicant is
responsible to furnish as -built drawings once streetlights have been installed.
Traffic Engineer Elate:
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
As -built drainage plans in electronic form have been submitted.
All other requirements for final plat approval have been satisfied.
Civil Engineer I/II
SURVEYOR REPORT
I have reviewed the plat and find that:
All requirements for final plat approval have been satisfied.
Surveyor
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
Date:
Design Review Engineer/Civil Engineering Manager
Effective: Feb 22, 2017
Date:
Date:.a
James, Donna
From:
Clark, Samuel T <samuel.clark@centerpointenergy.com>
Sent:
Thursday, February 9, 2017 4:29 PM
To:
James, Donna
Cc:
Townsend, Andrew W
Subject:
14415 W Baseline Rd - Plat Review
Good afternoon,
Earlier today, Ron Settlers came to our office to have someone review his request to replat the property at 14415 W
Baseline Rd. I reviewed the plat and CNP does not operate facilities in the land. Therefore, CNP does not have any
objections to the proposed replat.
If you have any questions, please don't hesitate to contact me.
Thank you,
Sam Clark, PE
Engineer III
Southern Gas Operations I Arkansas/Oklahoma Region
401 W. Capitol Ave, Suite 60o I Little Rock, AR 72201
Direct:501-377-4738 1 Mobile:5o1-680-2095
samuel.clarkO.centerpo€nteneW.com
iX2noftint
James, Donna
From:
KEATHLEY, CHRIS <ck0826@att.com>
Sent:
Thursday, February 9, 2017 2:02 PM
To:
James, Donna
Cc:
rdsettlers@att.net; MANION, JOSEPH E
Subject:
Lots 1 & 2 Settlers. Subdivision
To whom it may concern:
AT&T approves the request to replats lots 1 & 2 of Settlers Subdivision in the City of Little Rock into lots 1R, 2R, and 3R.
Thanks Chris
Chris Keathley
Lead 05P Ping & Eng bsgn
501.373.6594 0
501.615.5823 C
James, Donna
From: Carney, Dana
Sent: Thursday, February 9, 2017 2:48 PM
To: James, Donna
Subject: FW: Lots 1 R, 2R and 3R Settlers Subdivision
From: NEUMEIER, BERNARD [mailto:BNEUMEI@entergy.com]
Sent: Thursday, February 9, 2017 2:44 PM
To: Carney, Dana <DCarney@littlerock.gov>
Cc: rbsettlers@att.net
Subject: Lots 1R, 211 and 311 Settlers Subdivision
Dana,
Mr. Settlers brought a revised plat by my office for Settlers Subdivision — Lots 1R, 2R and 311 off of West Baseline Road
just west of the intersection with Colonel Miller Road. After review, Entergy does not objection to the re -plat. Electrical
service is already being provided to the structures contained in the platted area and there are no encroachment issues
created by the re -plat.
Thanks,
.Betnatd OVewnelet
Region Engineering Supervisor
Entergy Arkansas, Inc.
8-721-5158
501-954-5158
501-954-5175 fax
501-733-0045 cell
James, Donna
From:
Jonathan Long <Jonathan.Long @carkw.com>
Sent:
Thursday, February 9, 2017 11:04 AM
To:
James, Donna
Subject:
Lots 1 R 2R and 3R Settlers Subdivision
Donna,
CAW has no objection to this replat.
Thanks
Jonathan
Jonathan Long, P.E.
Senior Engineer
Central Arkansas Water
501.377.1224
James, Donna
From: Vincent Hotho <Steven.Hotho@lrwu.com>
Sent: Thursday, February 9, 2017 9:54 AM
To: James, Donna
Cc: rbsettlers@att.net
Subject: Ronald Settlers - Lots 1 R, 2R, 3R Settlers Subdivision
Donna,
I don't have a problem with the existing septic systems remaining for the existing residences on the proposed
replat. Please advise if you have further questions.
S. Vincent Hotho, P.E.
Program Supervisor
Little Rock Wastewater Utility
Ofc: 501.688.1452
M bl: 501.609.6332