Loading...
HomeMy WebLinkAboutS-0045-II Staff AnalysisDecember 18, 1984 SUBDIVISIONS Item No. 5 I NAME: Otter Creek Commercial Subdivision Preliminary (Revised) LOCATION: NW Corner of Otter Creek Parkway and Stagecoach Road DEVELOPER: ENGINEER: Rock Venture The Hodges Firm Little Rock, AR 209 1/2 West 2nd Street Little Rock, AR 72201 • 375-4404 AREA: 14.07 acres NO. OF LOTS: 9 FT. NEW STREET: 300 ZONING: PROPOSED USES: "C-2" PLANNING DISTRICT: 16 CENSUS TRACT: 41.04 A. Site History This site is part of the total development scheme of mixed uses submitted previously by the applicant. A commercial subdivision on the property was approved by the Commission on February 14, 1984. B. Existing Conditions The site is located at an intersection on the eastern end of the Otter Creek Subdivision. The land is basically flat with portions located both in the floodplain and floodway. C. Development Proposal This is a proposal to develop 14.07 acres into nine lots for commercial use. New feet of street involves 300'. D. Engineering Comments 1. Dedicate right-of-way and improve Highway 5 to arterial standards. December 18, 1984 SUBDIVISIONS Item No. 5 - Continued 2. Clarify relationsh'ip of Otter Creek Court to median cuts on Otter Creek Parkway. Clarify access points from Lots 1, 6, 7 and 8 onto Otter Creek Parkway. E. Analysis Actually, this submission represents a replat of property that was approved previously. The new submission consists of nine lots. The prior approval involves six lots and a concern that the lot lines be extended into the floodway. The latter has been addressed with this proposal. There has been no change in the amount of acreage involved. F. Staff Recommendation Approval, subject to: (1) Dedication of right-of-way and improvements of Highway 5 to arterial standards. (2) Clarification of Otter Creek Court to median cuts on parkway/access points on Lots 1, 6, 7 and 8 onto the parkway. G. Subdivision Committee Review The plan was reviewed by the Committee. It was pointed out that the project is zoned "C-2," which requires site plan review. Site plans have been approved on Lots 8 and 9. Before the proposal is final platted, all site plans should have been submitted for review. Water Works - 15' easement adjacent west right-of-way Highway 5. A 16" water main extension will be required to serve Lot 9. On -site fire lines may be required for development of the rear portions of Lots 3, 4 and 9. LANNING COMMISSION ACTION: The applicant was present. There were no objectors. A motion for approval was made and passed by a vote of: 8 ayes, 0 noes, 1 absent, 1 abstention and 1 open.