Loading...
HomeMy WebLinkAboutS-0045-Z Staff AnalysisFebruary 14, 1984 SUBDIVISIONS Item No. 3 NAME: Otter Creek Commercial Subdivision LOCATION: NE Corner of State Highway #5 and Otter Creek Parkway DEVELOPER: ENGINEER: The Hodges Firm The Hodges Firm 209 1/2 West 2nd Street 209 1/2 West 2nd Street Little Rock, AR 72217 Little Rock, AR 72217 Phone: 375-4404 Phone No. 375-4404 AREA: 14.96 acres NO. OF LOTS: 6 FT. OF NEW ST.: 290 ZONING: 11C-1" PROPOSED USES: Commercial A. Site Histor This site is part of the total development scheme of mixed uses submitted previously by the applicant. B. Existing Conditions The site is located at an intersection on the eastern end of the Otter Creek Subdivision. The land is basically flat with portions located both in the floodplain and floodway. C. Development Proposal This is a proposal to: develop 14.96 acres into six lots for commercial use. New access will be provided by 290' of new street in the form of a cul-de-sac. Access will also be provided for two lots from State Highway No. 5. D. Engineering Comments 1. Identify location of the floodway on the plat; Lot 2 floor elevation should be 301. 2. Otter Creek Court should be a 36' street with a 60' right-of-way. February 14, 1984 SUBDIVISIONS Item No. 3 - Continued 3. Dedicate right-of-way and improve Highway No. 5 to minor arterial standards. E. Staff Analysis Staff's only concern is that the applicant is that the applicant provide assurances as to the utility of Lot 6 since it appears to be very low. If this plat extends into the unbuildable floodway area, down zoning to "O-S" will be required. F. Staff Recommendation Approval, subject to comments made. SUBDIVISION COMMITTEE REVIEW: The Committee reviewed the application and requested that the applicant specify that area that is unbuildable as a tract, give it a lot number and dedicate it. Staff pointed out that Lots 5 and 6 may need to be combined depending on a location on the floodway. Water Works reported that there is an easement requirement for the 15' adjoining the proposed west right-of-way of State Highway #5. PLANNING COMMISSION ACTION: The applicant was present. There were no objectors. It was reported that all floodway concerns were worked out with the City Engineers. A motion for approval was made and passed, subject to the submission of a revised plat showing the extension of lot lines into the floodway area. The vote was 11 ayes, 0 noes and 0 absent.