Loading...
HomeMy WebLinkAboutS-0045-F Staff AnalysisNovember 9, 1982 SUBDIVISIONS Item No. 5 - File No. _ 45F NAME NAME LOCATION° - N DEVELOPER Otter Creek Dev. P•O• Box 868 Little Rock, AR AREA: 31.1 acres ZONING: "C-3" Otter Creek Village I-30 at Otter Creek Road ENGINEER - Co. PROPOSED USES: Commercial/Retail VARIANCES REQUESTED: None. A. M EXISTING CONDITIONS ---��. . The majority of this tract is currently covered b structure, which is anhoffice ere is only one existing y an abundance of Pines. use located on what is Proposed to be Lot 6. DEVELOPMENT PROPOSAL This is a request to s ranging from request tsubdivide 31.1 acres into six Of new streets o 5.86 acres, approximatel lots reincluded. The I-30 interchange improvements and 50 Road will be constructed proposed relocation of Otter Creek Creek Mall. Phasing n conjunction with Constructing Otter for the project will first einvolve I-30 Service Road Otter Cre n Village Drive secondly, g Otter Creek. between the I-30 Frontage Otter Creek Village and g Road and the i Drive between the A temporary connection will existir�g Otter Creek streets with the existin connect the two Road. Additionally,g Otter Creek Road. proposed lot final be allowedplicant is requesting that a one I November 9, 1982 SUBDIVISIONS Item No. 5 - Continued C. CONFORMANCE TO THE ORDINANCE No variances requested. D. LEGAL CONSIDERATIONS None. E. ENGINEERING CONSIDERATIONS Will comment at the meeting. F, ANALYSIS Staff's major concern with this proposal revolves around the increased amount of traffic which will be generated by more commercial development in such close proximity to the proposed mall. A traffic study by Barton-Aschman indicates that access roads planned in conjunction with the first phase of Otter Creek Mall plat will be operating at capacity upon mall completion. Since this plat will greatly magnify traffic, the Engineering Department has been asked to look into resulting implications and/or the capacity of the "ring road" for further commercial development. G. STAFF RECOMMENDATION Approval, subject to comments made. SUBDIVISION COMMITTEE RECOMMENDATION: A motion in agreement with the staff's recommendation was made and passed by a vote of 5 ayes, 0 noes and 0 absent (see minutes from No. 4). PLANNING COMMISSION ACTION: The applicant was present. There were no objectors. A motion in agreement with the Subdivision Committee's recommendation was made and passed by a vote of 9 ayes, 0 noes, 1 absent and 1 open position.