HomeMy WebLinkAboutS-0170-WWW ApplicationBILL OF ASSURANCE
KNOW ALL MEN BY THESE PRESENTS:
THAT WHEREAS: Joseph Mowery and Elizabeth Mowery, husband and
wife, are the sole owners of the following described property lying in the
City of Little Rock, Pulaski County, Arkansas.
LOT 3, BLOCK 52, PLEASANT VALLEY ADDITION
NOW, THEREFORE: The Grantors have caused said property to be
surveyed by 011en Dee Wilson, and a Replat thereof, identified by the title
of LOT 3R, BLOCK 52, PLEASANT VALLEY ADDITION to the City of
Little Rock, Pulaski County, Arkansas. The plat bears the seals and
signatures of 011en Dee Wilson, Registered Professional Land Surveyor, the
signature of the Grantors and bears a Certificate of Approval executed by
the Little Rock Planning Commission on May 19, 2008, and is on record in
the office of the Circuit Clerk and ex-officio Recorder of Pulaski County,
Arkansas, in Plat Book Page and the grantors do hereby
make this Bill of Assurance.
And the grantors do hereby certify that they have replatted said real estate
in accordance with said plat. The lands embraced in said plat shall be
forever -known as designed on said plat; and every deed of conveyance for
said property shall use this designation.
The filing of this Bill of Assurance and plat for record in the Office of the
Circuit Clerk and ex-officio Recorder of Pulaski County shall be a valid and
complete delivery and dedication of the streets and easements shown on the
said plat.
The purpose of this Instrument is to amend the thirty foot building line
along and parallel with Sumter Forest Drive allowing construction of a
storage building within sixteen feet of the east line of said lot as authorized
by the Zoning Board of Adjustment, Case No. Z-8346, at its meeting on
May 19, 2008.
WITNESS, our hands this .. 7 "-k day of l.12008.
922��41Z
Joseph ow
Elizabeth M ery
STATE OF ARKANSAS)
COUNTY OF PULASKI)
BE IT REMEMBERED that on this day came before me a Notary Public
within and for the County and State aforesaid, the undersigned and
stated tha�,�f-
440 executed the foregoing Bill of Assurance
.t■' out ''a�,,
���`y+ ���.. C11�. • �pG�Y ,ram:
:NOTARY
OTARY
PUBLIC
.,,�rS'�f rd y7-2p�.•';�P�.= aiary Public
My Cor;,�i'ires p
Little Rock Planning Commission Date
rf!czulrcc by -fi" amity of L's.3a Rx::sub&!$iar reguiaGaris.
BIl1 of rucuianco pro,,
as1a>111shed by ti a
GVl ttls Rrocic subdiMs on axcood nIMUM nd Zc i g ardiranoes, the
�;. of Little Rock Planning [;Qmmission
CIVIL ENGINEERING DIVISION
FINAL PLAT FILING APPROVALS
NAME PLEASANT VALLEY ADD LOT 3R BLOCK 52
INSPECTOR REPORT
I have made a final inspection of the improvements and find that:
✓/ All improvements shown on construction drawings for the development are constructed and in conformance
with City requirements/standards.
C ain Imp vem nts rem ' uncompleted and a punch list has been prepared and sent.
g P
Engineering Specialist Date:
g
ADDRESSING SPEC[ LIST'S REPORT
I have revie d the plat and find t at the street names and street configuration are acceptable.
zti2��_ Addressing Specialist Date:
TRAFFIC ENGINEER REPORT
I have reviewed the plat and find that:
I/ All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in
conformance with City requirements/standards.
Work orders have been prepared for signage and street lights.
Indicate the number of street signs ordered for this plat for billing to developer
Certain improvements remain uncompleted and a punch list has been prepared and sent.
Traffic Engineer
CIVIL ENGINEER REPORT
I have reviewed the file for this matter and find that:
Date: /0 /z:?4.)'F
The maintenance bond has been submitted and it is the proper type and amount.
Financial assurance for the uncompleted improvements listed above has been received.
All other requirements for final plat approval have been satisfied.
t—L-%_
aZ3jol � Civil Engineer I/II Date:_ /
SURVEYOR'S REPORT
I have reviewed the plat and find that:
All re is for final plat approval have been satisfied.
Surveyor
MANAGER APPROVAL
All Civil Engineering requirements for filing this final plat have been satisfied.
` ° I�1Z3/o�-
�� �� Date:
Design Review Engineer/Civil Engineering Manager
February 2007
Date: / 0 Z�