Loading...
HomeMy WebLinkAboutS-0170-WWW ApplicationBILL OF ASSURANCE KNOW ALL MEN BY THESE PRESENTS: THAT WHEREAS: Joseph Mowery and Elizabeth Mowery, husband and wife, are the sole owners of the following described property lying in the City of Little Rock, Pulaski County, Arkansas. LOT 3, BLOCK 52, PLEASANT VALLEY ADDITION NOW, THEREFORE: The Grantors have caused said property to be surveyed by 011en Dee Wilson, and a Replat thereof, identified by the title of LOT 3R, BLOCK 52, PLEASANT VALLEY ADDITION to the City of Little Rock, Pulaski County, Arkansas. The plat bears the seals and signatures of 011en Dee Wilson, Registered Professional Land Surveyor, the signature of the Grantors and bears a Certificate of Approval executed by the Little Rock Planning Commission on May 19, 2008, and is on record in the office of the Circuit Clerk and ex-officio Recorder of Pulaski County, Arkansas, in Plat Book Page and the grantors do hereby make this Bill of Assurance. And the grantors do hereby certify that they have replatted said real estate in accordance with said plat. The lands embraced in said plat shall be forever -known as designed on said plat; and every deed of conveyance for said property shall use this designation. The filing of this Bill of Assurance and plat for record in the Office of the Circuit Clerk and ex-officio Recorder of Pulaski County shall be a valid and complete delivery and dedication of the streets and easements shown on the said plat. The purpose of this Instrument is to amend the thirty foot building line along and parallel with Sumter Forest Drive allowing construction of a storage building within sixteen feet of the east line of said lot as authorized by the Zoning Board of Adjustment, Case No. Z-8346, at its meeting on May 19, 2008. WITNESS, our hands this .. 7 "-k day of l.12008. 922��41Z Joseph ow Elizabeth M ery STATE OF ARKANSAS) COUNTY OF PULASKI) BE IT REMEMBERED that on this day came before me a Notary Public within and for the County and State aforesaid, the undersigned and stated tha�,�f- 440 executed the foregoing Bill of Assurance .t■' out ''a�,, ���`y+ ���.. C11�. • �pG�Y ,ram: :NOTARY OTARY PUBLIC .,,�rS'�f rd y7-2p�.•';�P�.= aiary Public My Cor;,�i'ires p Little Rock Planning Commission Date rf!czulrcc by -fi" amity of L's.3a Rx::sub&!$iar reguiaGaris. BIl1 of rucuianco pro,, as1a>111shed by ti a GVl ttls Rrocic subdiMs on axcood nIMUM nd Zc i g ardiranoes, the �;. of Little Rock Planning [;Qmmission CIVIL ENGINEERING DIVISION FINAL PLAT FILING APPROVALS NAME PLEASANT VALLEY ADD LOT 3R BLOCK 52 INSPECTOR REPORT I have made a final inspection of the improvements and find that: ✓/ All improvements shown on construction drawings for the development are constructed and in conformance with City requirements/standards. C ain Imp vem nts rem ' uncompleted and a punch list has been prepared and sent. g P Engineering Specialist Date: g ADDRESSING SPEC[ LIST'S REPORT I have revie d the plat and find t at the street names and street configuration are acceptable. zti2��_ Addressing Specialist Date: TRAFFIC ENGINEER REPORT I have reviewed the plat and find that: I/ All streetlight installation, stripping, signage and other traffic improvements have been constructed and are in conformance with City requirements/standards. Work orders have been prepared for signage and street lights. Indicate the number of street signs ordered for this plat for billing to developer Certain improvements remain uncompleted and a punch list has been prepared and sent. Traffic Engineer CIVIL ENGINEER REPORT I have reviewed the file for this matter and find that: Date: /0 /z:?4.)'F The maintenance bond has been submitted and it is the proper type and amount. Financial assurance for the uncompleted improvements listed above has been received. All other requirements for final plat approval have been satisfied. t—L-%_ aZ3jol � Civil Engineer I/II Date:_ / SURVEYOR'S REPORT I have reviewed the plat and find that: All re is for final plat approval have been satisfied. Surveyor MANAGER APPROVAL All Civil Engineering requirements for filing this final plat have been satisfied. ` ° I�1Z3/o�- �� �� Date: Design Review Engineer/Civil Engineering Manager February 2007 Date: / 0 Z�