HomeMy WebLinkAboutHDC2024-010 COC signedDEPARTMENT OF PLANNING AND DEVELOPMENT
723 West Markham Street
Little Rock, Arkansas 72201-1334
Phone: (501) 371-4790 Fax:(501) 399-3435
www.tittLerock.gov
CERTIFICATE OF COMPLIANCE
H DC2024-010
Property Owner/Agent: KGM Holdings LLC/Adam White, Cast Iron Construction
Address of Property: 1422 Scott Street
Project Description with Conditions listed:
1) Wood Siding and Trim Board Repair
a) Trim Boards and Siding Repair
i) Repair damaged trim boards and siding where possible by patching deteriorated wood
with wood putty, repair larger areas using wood epoxies, and repair significantly
deteriorated areas by removing damage and fitting with a new piece of wood, i.e. a
dutchman repair.
b) Trim Boards and Siding Replacement
i) Remove irreparably damaged trim boards and siding pieces and replace with boards of
same dimension, shape and profile.
ii) High grade cedar or cypress is recommended as replacement material.
iii) Caulk, prime, and paint. Back prime new boards by applying a coat of primer to the
reverse side and edges.
c) Trim Boards around Windows
i) Repair damaged trim boards and siding where possible by patching deteriorated wood
with wood putty, repair larger areas using wood epoxies, and repair significantly
deteriorated areas by removing damage and fitting with a new piece of wood, i.e. a
dutchman repair.
ii) Remove damaged trim boards and replace with boards of same dimension, shape and
profile. Match details of existing windows.
iii) Caulk, prime, and paint. Back prime new boards by applying a coat of primer to the
reverse side and edges.
2) Wood Soffit and Fascia Repair
a) Repair damaged soffit and fascia pieces where possible by patching deteriorated wood
with wood putty, repair larger areas using wood epoxies, and repair significantly
deteriorated areas by removing damage and fitting with a new piece of wood, i.e. a
dutchman repair.
b) Remove damaged soffit and fascia pieces and replace with wood boards of same
dimension, shape and profile.
c) High grade cedar or cypress is recommended as replacement material.
d) Caulk, prime, and paint. Back prime new boards by applying a coat of primer to the reverse
side and edges.
3) Painting
a) Scrape areas as needed.
b) Apply one coat of primer, and two coats of paint.
c) Back prime new boards by applying a coat of primer to the reverse side and edges.
d) Avoid non -breathable coatings which trap moisture.
S Sign ure Issue Date
Expiration Date (Ord. No. 22,338)
The original is printed on pale orange paper.
POSTING OF COC ON PROPERTY DURING PROJECT: Pursuant to Little Rock, Ark. Ordinance No. 22,338, a Certificate
of Compliance, or copy, shall be posted, available for inspection, and prominently displayed on the site of the work at
the front of the property to be seen from the street until the completion of the project.
COC EXPIRATIONS AND EXTENSIONS: Pursuant to Little Rock, Ark. Ordinance No. 22,338, a Certificate of
Compliance shall expire and be considered null and void on the expiration date noted above. If an extension is needed
to complete work, please review terms of extension and expiration in Ord. No. 22,338 and contact Planning &
Development staff at least one month prior to the expiration date.