Loading...
HomeMy WebLinkAboutResponse to Comments 020624City of Little Rock Planning and Development Planning Commission Hearing/March 14, 2024 Applicant Comment Response for Proposed Development RE: Family Peace Center – POD (Z-8764-B) East Side of Dailey Drive (9000 Block) Development Staff Comments: 1. Provide a more detailed description of proposed use. The Family Peace Center will receive and disperse donations to victims of domestic violence, while also providing temporary housing, as well as an array of services (noted in comment response 3). 2. Will there be overnight/temporary boarding? Yes. There will be overnight and temporary boarding. 3. What services will be provided to clients? Services will include: o Statewide Domestic Violence 24-Hour Hotline o Emergency Shelter o Sexual assault program o Children’s Program o Outreach clients/legal help o Camp Hope (refuge for children) o Advocacy Program and Support (medical, housing, employment) o Transitional Housing o Adult Education o Community Education and outreach program 4. Provide complete/executed Affidavit. See attached for completed affidavit. 5. Will there be a dumpster on site? If so, dumpster areas must be screened and comply with Section 36-523 of the City’s Zoning Ordinance. Yes, there will be a dumpster onsite and it will be screened and comply with Section 36-523. 6. Any sight lighting must be low-level and directed away from adjacent properties. Noted, all site lighting will be low-level. 7. Will there be a sign? If so, all signage must comply with Section 36 -553 (signs permitted in institutional and office zones). The developers are discussing if they will have a sign or a temporary sign. In either case, the sign, whether permanent or temporary, will comply will Section 36-553. NAME TYPE ISSUE COMMENTS EAST SIDE OF DAILY DR (9000 BLOCK Z-8764-B All Central Arkansas Water requirements in effect at the time of request for water service must be met. Please submit plans for water facilities and/or fire protection system to Central Arkansas Water for review. Plan revisions may be required after additional review. Contact Central Arkansas Water regarding procedures for installation of water facilities and/or fire service. Approval of plans by the Arkansas Department of Health Engineering Division and Little Rock Fire Department is required. A Capital Investment Charge based on the size of meter connection(s) will apply to this project in addition to normal charges. This fee will apply to all connections including metered connections off the private fire system. Contact Central Arkansas Water regarding the size and location of the water meter. The facilities on-site will be private. When meters are planned off private lines, private facilities shall be installed to Central Arkansas Water's material and construction specifications and installation will be inspected by an engineer, licensed to practice in the State of Arkansas. Execution of Customer Owned Line Agreement is required. Due to the nature of this facility, installation of an approved reduced pressure zone backflow preventer assembly (RPZ) is required on the domestic water service. This assembly must be installed prior to the first point of use. Central Arkansas Water (CAW) requires that upon installation of the RPZA, successful tests of the assembly must be completed by a Certified Assembly Tester licensed by the State of Arkansas and approved by CAW. The test results must be sent to CAW's Cross Connection Section within ten days of installation and annually thereafter. Contact the Cross Connection Section at 377-1226 if you would like to discuss backflow prevention requirements for this project. Fire sprinkler systems which do not contain additives such as antifreeze shall be isolated with a double detector check valve assembly. If additives are used, a reduced 4 noted, will comply noted, will comply noted, will comply noted, will comply noted, will comply noted, will comply noted, will comply NAME TYPE ISSUE COMMENTS pressure zone backflow preventer shall be required. 305 LINWOOD CRT Z-9906 NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. 205 FLETCHER RIDGE DR Z-9409-B Please provide an easement for the existing water utilities at the South East corner of the property. 305 FLETCHER LOOP Z-9409-C NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. 5024 LEE AVE Z-9918 NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. 8 CHERRY VALLEY DR Z-9928 NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. 4 CATALINA CRT Z-9933 NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. 8 SERENITY DR Z-9936 The existing 54" water main at the West property line should be shown along with the existing easement. 1715 N TYLER ST Z-9938 NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. 1616 N GRANT ST Z-9940 NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. 1711 N GRANT ST Z-9939 NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. 415 N MONROE ST Z-9941 NO OBJECTIONS; All Central Arkansas Water requirements in effect at the time of request for water service must be met. 5