HomeMy WebLinkAboutZ-8503-D Staff AnalysisFILE NO.: Z-8503-D
NAME: Herrick Heights Long -form PD-R
LOCATION: Located on the west side of South Bowman Road between Brodie Creek
Subdivision and the Pointe at Brodie Creek Apartments
DEVELOPER:
The Pointe at Brodie Creek, LLC
9800 Maumelle Boulevard
North Little Rock, AR 72113
ENGINEER:
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 70+ acres
CURRENT ZONING
ALLOWED USES
PROPOSED ZONING
PROPOSED USE
NUMBER OF LOTS: 1
R-2, Single-family
Single-family residential
-M
FT. NEW STREET: 0 LF
Single-family, Multi -family, 0-1, Quiet Office District
VARIANCE/WAIVERS: A variance from the City's Land Alteration Ordinance to allow
grading of the entire multi -family development site with the development of the first
phase of the apartments.
BACKGROUND:
On October 8, 2015, the Planning Commission denied a request to rezone 23 acres of
an overall larger tract from R-2, Single-family to Planned Development Residential to
allow construction of 400+ units of multi -family housing. The developer had indicated
an overall development plan including boundary street improvements to South Bowman
Road and a commitment to develop the northern portion of the property as single-family.
The rezoning request did not include the entire 70+ acres and there were no measures
for staff to enforce the developer's proposal.
FILE NO.: Z-8503-D Cont.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
The applicant is now proposing to rezone the entire site (73.95-acres) to Planned
Development Residential to allow for an overall development plan of the entire
acreage. The proposal includes the entire tract the developer is proposing to
purchase. The plan indicates the northern portion of the site with single-family
detached homes. There is an area located along South Bowman Road which is
indicated for future development with a use other than multi -family. The plan
indicates single-family residential contained within 27.25 acres, the multi -family
development contained on 23.45 aces, floodway and open space containing
11.75 acres and 0-1, Quiet Office District uses containing 11.50 acres.
The multi -family development will be accessed from the existing development
located on South Bowman Road. The multi -family portion of the development is
proposed with 408 units. The units will be developed in phases with 120 units
open for leasing in 2017, 96 units in 2018, 96 units in 2019 and 96 units in 2020.
B. EXISTING CONDITIONS:
The overall site contains 70+ acres located on the west side of South Bowman
Road. The entire site is heavily wooded and is occupied by one single-family
home. The area proposed for rezoning to Planned Development Residential is
located to the rear of this acreage and is not visible from South Bowman Road.
In this area there are 600 units constructed to the south of this site in the Pointe
at Brodie Creek. There are an additional 500 units approved located across
South Bowman Road. Clearing and grading has been completed and there are
currently buildings under construction. Across from the 70-acre parcel is
a nursing home and single-family homes located in the Sandpiper Subdivision.
North of the parcel are single-family homes located in the Brodie Creek
subdivision. South Bowman Road is an unimproved roadway with open ditches
for drainage.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
property owners. All property owners located within 200 feet of the site along
with the Woodlands Edge Community Association and the John Barrow
Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
submitted and approved prior to the start of construction. Is a variance
K
FILE NO.: Z-8503-❑ Cont.
requested to advance grade future phases of construction with construction
of Phase 1?
2. Stormwater detention ordinance applies to this property. Show the
proposed location for stormwater detention facilities on the plan.
3. If disturbed area is 1 or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
4. A special Grading Permit for Flood Hazard Areas will be required per
Section 8-283 prior to construction.
5. The minimum Finish Floor elevation of at least 1 foot above the base flood
elevation of Building 6 and 7 should be shown on grading plans.
6. In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25 foot
wide drainage and access easement is required adjacent to the floodway
boundary.
7. Alteration of the water course will require approval from the Little Rock
District of the US Army Corps of Engineers prior to start of work.
8. Prior to construction of retaining walls, an engineer's certification of design
and plans must be submitted to Public Works for approval. After
construction, an as -built certification is required for construction of the
retaining wall.
9. The owner and/or manager of each multi -family residence of 100 or more
dwelling units shall provide recycling and encourage participation by the
tenants, renters, or owners of each unit. Contact Melinda Glasgow at
501.371.4646 mglasgow@littlerock.org for more information. Show the
trash and recycling locations on the site plan.
10. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
11. Bowman Road is classified on the Master Street Plan as a minor arterial.
A dedication of right-of-way 45 feet from centerline will be required.
12. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to Bowman
Road including 5-foot sidewalks with the planned development. The new
back of curb should be located 29.5 feet from centerline. A left turn lane
should be provided for all driveways.
13. Submit a Traffic Impact Study for the proposed project. Study should
address trip generation and trip distribution for the development and also
should take into account existing and projected traffic growth. Study should
include: Roadway Level of Service Analysis for 2-lane sections of Bowman
Road. (Existing and projected), and signal warrant analysis for Bowman at
Cherry Side and Brodie Creek.
3
ILE NO.: Z-8503-D (Cont.
14. If the north driveway will be used for more than secondary emergency
access, provide a letter prepared by a registered engineer certifying the
sight distance at the intersection(s) comply with 2004 AASHTO Green Book
standards.
15. If the driveway will be used other than secondary emergency access, the
driveway should be paved with asphalt, curb and gutter.
16. Show the proposed driveways or access locations to the proposed
residential and proposed non-residential use areas.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements if new sewer
service is required for this project. Capacity fee analysis required. Contact Little
Rock Wastewater Utility for additional information.
Entergy: Entergy does not object to this proposal. A three phase power line
exists along the east side of Bowman Road on the east side of this property.
Another 3 phase line exists to the north of the property. There do not appear to
be any conflicts with existing Entergy facilities. Contact Entergy in advance
regarding future service requirements to the development and future facilities
locations as this project proceeds.
CenterPoint Energ : No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required.
If additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
3. Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering Division and the Little Rock
Fire Department is required.
4. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
4
FILE NO.: Z-8503-D Cont.
5. If there are facilities that need to be adjusted and/or relocated, contact
Central Arkansas Water. That work would be done at the expense of the
developer.
6. Contact Central Arkansas Water regarding the size and location of water
meter.
7. Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZA) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water requires that upon installation of the
RPZA, successful tests of the assembly must be completed by a Certified
Assembly Tester licensed by the State of Arkansas and approved by
Central Arkansas Water. The test results must be sent to Central Arkansas
Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226
if you would like to discuss backflow prevention requirements for this
project.
8. The facilities on -site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's
materials and construction specifications and installation will be inspected
by an engineer, licensed to practice in the State of Arkansas. Execution of
a Customer Owned Line Agreement is required.
9. Fire sprinkler systems which do not contain additives such as antifreeze
shall be isolated with a double detector check valve assembly. If additives
area used, a reduced pressure zone back flow preventer shall be required.
10. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire Department:
Maintain Access:
Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
fire apparatus access road, the minimum road width shall be 26 feet, exclusive of
shoulders.
Grade. Maintain fire apparatus access roads as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire
apparatus access roads shall not exceed 10 percent in grade except as
approved by the fire chief.
Loading. Maintain fire apparatus access road design as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and
loading. Facilities, buildings or portions of buildings hereafter constructed shall
5
FILE NO.: Z-8503-D (Cont.
be accessible to fire department apparatus by way of an approved fire apparatus
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least
75,000 pounds.
30' Tall Buildings - Maintain aerial fire apparatus access roads as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D105.1 — D105.4
D105.1 Where Required. Where the vertical distance between the grade
plane and the highest roof surface exceed 30', approved aerial fire apparatus
access roads shall be provided. For the purposes of this section the highest roof
surfaces shall be determined by measurement to the eave of a pitched roof, the
intersection of a roof to the exterior wall, or the top of the parapet walls,
whichever is greater.
D105.2 Width. Aerial fire apparatus access roads shall have a minimum
unobstructed with of 26', exclusive of shoulders, in the immediate vicinity of the
building or portion thereof.
D105.3 Proximity to building. At least one of the required access routes
meeting this condition shall be located within a minimum of 15 feet and a
maximum of 30 feet from the building, and shall be positioned parallel to one
entire side of the building. The side of the building on which the aerial fire
apparatus access road is positioned shall be approved by the fire code official.
D105.4 Obstructions. Overhead utility and power lines shall not be
located over the aerial fire apparatus access road or between the aerial fire
apparatus road and the building. Other obstructions shall be permitted to be
places with the approval of the fire code official.
Dead Ends. Maintain fire apparatus access roads at dead end locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.4 Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet
shall be provided with width and turnaround provisions in accordance with Table
D103.4. Requirements for Dead-end fire apparatus access roads.
Gates. Maintain fire apparatus access road gates as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus
access road gates. Gates securing the fire apparatus access roads shall
comply with all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by
one person.
4. Gate components shall be maintained in an operable condition at all times
and replaces or repaired when defective.
R
FILE NO.: Z-8503-D(Cont.)
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices
shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and
padlock unless they are capable of being opened by means of forcible
entry tools or when a key box containing the keys to the lock is installed at
the gate location.
7. Locking device specifications shall be submitted for approval \by the fire
code official
8. Electric gate operators, where provided, shall be listed in accordance with
UL 325.
9. Gates, intended for automatic operation shall be designed, constructed
and installed to comply with requirements of ASTM F 2200.
Multi -Family Residential Developments. As per Appendix D, Section
D106.1 of the 2012 Arkansas Fire Prevention Code Vol. 1. Projects having
more than 100 dwelling units. Multiple -family residential projects having more
than 100 dwelling units shall be equipped throughout with two separate and
approved fire apparatus access roads.
Exception: Projects having up to 200 dwelling units may have a single
approved fire apparatus access road when all building, including nonresidential
occupancies are equipped throughout with approved automatic sprinkler systems
installed in accordance with Section 903.3.1.1 or 903.3.1.2.
As per Appendix D, Section D106.2 of the 2012 Arkansas Fire prevention
Code Vol. 1. Projects having more than 200 dwelling units. Multiple -family
residential projects having more than 200 dwelling units shall be provided with
two separate and approved fire apparatus access roads regardless of whether
they are equipped with an approved automatic sprinkler system.
Fire Hydrants. Locate Fire Hydrants as per Appendix C of the
2012 Arkansas Fire Prevention Code. Section C101 — C105, in conjunction
with Central Arkansas Water (Jason Lowder 501.377.1245) and the Little Rock
Fire Marshal's Office (Captain Tony Rhodes 501.918.3757 or Capt. John Hogue
501-918-3754). Number and Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: The area is not currently served by METRO. We would like
to emphasize maintaining the sidewalk connections to the neighborhood for
transit rider access to jobs and shopping. The area is part of our future plans for
the West Little Rock express and community shuttle/flex service. METRO has
plans to continue to serve near the area on Route 9 and plans to provide service
enhancements.
7
FILE NO.: Z-8503-D Cont.
F. ISSUES/TECHNICAL/DESIGN:
Building Code: Project is subject to full commercial plan review and approval
prior to issuance of a building permit. For information on submittal requirements
and the review process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; cricheVCaNittlerock.orq or
Mark Alderfer at 501.371.4875; malderfer@littl_erock.orq.
Planning Division: This request is located in the Ellis Mountain Planning District.
The Land Use Plan shows Residential Low Density (RL) and Residential Medium
Density (RM) for this property. Residential Low Density allows for single family
homes at densities not to exceed 6 dwelling units per acre. Such residential
development is typically characterized by conventional single family homes, but
may also include patio or garden homes and cluster homes, provided that the
density remain less than 6 units per acre. Residential Medium Density
accommodates a broad range of housing types including single family attached,
single family detached, duplex, town homes, multi -family and patio or garden
homes. Any combination of these and possibly other housing types may fall in
this category provided that the density is between six (6) and twelve (12) dwelling
units per acre. The applicant has applied for a rezoning from R-2 (Single Family
District) to PDR (Planned District Residential) to allow the construction of an
apartment development at 17.4 units per acre, 27 acres of single family at an
undetermined density and 11.5 acres of unknown non-residential uses on
the site.
Master Street Plan: Bowman Road is a Minor Arterial on the Master Street Plan.
A Minor Arterial provides connections to and through an urban area and their
primary function is to provide short distance travel within the urbanized area.
Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on Bowman Road. This street may require dedication of right-of-way
and may require street improvements for entrances and exits to the site.
Bicycle Plan: A Class II Bike Lane is shown along Bowman Road. Bike Lanes
provide a portion of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. The north, south, and east properties are zoned R-2. As a component of all
land use buffer requirements, opaque screening, whether a fence or other
device, a minimum of six (6) feet in height shall be required along these
perimeters of the site.
�:3
FILE NO.: Z-8503-D
3. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). For developments with more than one hundred fifty (150) parking
spaces the minimum size of an interior landscape area shall be three hundred
(300) square feet. Interior islands must be a minimum of seven and one half
(7 1/2) feet in width. Trees shall be included in the interior landscape areas at
the rate of one (1) tree for every twelve (12) parking spaces.
4. An automatic irrigation system to water landscaped areas shall be required
for developments of one (1) acre or larger.
5. The development of two (2) acres or more requires the landscape plan to be
stamped with the seal of a Registered Landscape Architect.
6. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper
or larger.
G. SUBDIVISION COMMITTEE COMMENT:
(October 28, 2015)
Mr. Tim Daters of White-Daters and Associates was present representing the
request. Staff presented an overview of the item stating there were additional
items necessary to complete the review process. Staff requested Mr. Daters
provide details of the proposed development including the proposed street
construction plan. Staff requested he provide the proposed signage plan, the
proposed phasing plan and the future uses of the area identified as
non-residential.
Public Works comments were addressed. Staff stated a grading plan was
required prior to any development of the site. Staff also stated a traffic impact
study was required for the proposed development. Staff questioned the driveway
access between the existing and new development. Mr. Daters stated the drive
would serve as the construction access and upon completion of the project the
drive would provide exit only service to the residence. Staff requested Mr. Daters
provide a sketch grading and drainage plan.
Landscaping comments were addressed. Staff stated a land use buffer was
required along the sites northern, western and eastern perimeters. Staff stated
screening was also required along the same perimeters. Staff stated an
automatic irrigation system to water landscape areas was required at the time of
development. Staff stated a minimum of eight percent (8%) of the interior paved
areas was to be landscaped.
There were no more issues for discussion. The Committee then forwarded
the item to the full Commission for final action.
0
FILE NO.: Z-8503-D (Cont.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the
technical issues associated with the request raised at the October 28, 2015,
Subdivision Committee meeting. The applicant has provided the proposed
building elevations, the construction materials, location and material of any
proposed fencing and the location of any proposed signage. The applicant has
also provided the proposed phasing plan and indicated the development would
not be subdivided into separate lots.
The project is approximately 70-acres located on the west side of South of
Bowman Road between the Brodie Creek Subdivision and the Pointe at Brodie
Creek apartments. The request is a rezoning of this site from R-2, Single-family
to Planned Development Residential to allow the approval of the zoning and a
site plan for 408 units of multi -family housing, future development of age
restricted residential or single-family and 0-1, Quiet Office District.
The multi -family portion of the development is an addition to the existing
600 units located to the south of this site. The acreage of this area is
23.45-acres. This development is proposed containing 408 units. There is an
emergency access which will also serve as an exit drive along this property's
southern boundary to allow egress for the residents of this development.
All ingress is from the existing drive serving the Pointe at Brodie Creek
apartments.
An area along the northern perimeter is indicated on the site plan for future
development of single-family or age restricted housing. The area of this portion
of the site contains 27.25-acres. The development of this area will include
detached homes, which will conform to the development criteria of the R-2,
Single-family zoning district. If developed as attached age restricted housing the
density will not exceed six (6) units per acre.
The applicant has indicated the future use of the non-residential portion of the
site. The acreage of this area is 11.50-acres. The applicant has indicated this
area will develop with uses as allowed within the 0-1, Quiet Office Zoning
District. In addition to 0-1, the applicant is requesting the allowance of a nursing
home or convalescent home or attached residential homes at a density not to
exceed six (6) units per acre.
Within the 70+ acre tract the proposal includes maintaining 11.75-acres which is
located within the floodway or has been designated as open space. These buffer
areas are along the northern, eastern and western perimeters of the proposed
multi -family development area. The minimum width of the open space buffer will
be 50-feet. The plan also includes an area along South Bowman Road which will
be retained as an open space buffer should the area develop with a residential
use. The open space buffers for the most part are to remain in their natural state
`M
FILE NO.: Z-8503-D (Cont.
unless approved for modification by the City. Within the buffer areas recreational
use by the adjacent residents will be allowed. Construction of walks, walking
paths, parks and playgrounds will be allowed. Utilities will be allowed to cross
the open space buffers provided the utilizes are placed in a manner so as to
minimize the disturbance to existing vegetation and work necessary to maintain
underground utilities. Any work authorized by the City for any necessary
maintenance related to stormwater drainage will be allowed. Should it become
necessary in the future to provide access across the street the applicant will work
with the City and FEMA to determine the best access with the least disturbance.
The development is proposed with materials similar to the existing apartments.
The building materials will include brick, stone, drivit and/or siding. The roof will
be asphalt architectural shingles. The building is proposed with a maximum
building height of 45-feet. The buildings are proposed as three (3) story
buildings.
The site plan indicates the placement of dumpsters in various locations
throughout the site. The dumpsters will be screened per the typical ordinance
requirement or a minimum of two (2) feet above the height of the trash container.
Recycling will also be provided for the development. Recycling containers will
also be screened per the minimum ordinance standard. The hours of dumpster
service have been limited to daylight hours.
The site plan notes wood fencing will be placed along the site's, northern,
eastern and western perimeter. The site plan also notes an 8-foot tall vinyl fence
will be installed on the north and eastern perimeter. The note states all fencing
and locations will match the fencing installed within the existing development.
The applicant has indicated no new signage is proposed for this development.
The development does not have street frontage and signage and the placement
of signage would be of no benefit to the development. All ingress to the site is
from the existing drive entrance which has signage within an entrance feature
along South Bowman Road.
The development is proposed in four (4) phases. Phase I includes the
construction of five (5) buildings and a pool and pool house. Phase II includes
the construction of two (2) additional buildings, Phase III will include the
construction of seven (7) buildings and in the final phase three (3) buildings will
be constructed. The development contains 17 buildings with 24 units per
building. Within the development there are 190 units with one (1) bedroom,
170 units with two (2) bedrooms and 48 units have three (3) bedrooms.
Construction of the units will begin in June 2016 with the final phase of
construction beginning in June 2019. The plan includes the construction of
120 units in 2016, 96 units in each of the years from 2018 to 2020.
11
FILE NO.: Z-8503-D Cont.)
The development is proposed with 890 parking spaces. The plan indicates
102 garage spaces, 198 carport spaces and 590 uncovered spaces. Parking for
a multi -family development is based on one and one-half parking spaces per unit.
Based on this calculation 612 parking spaces would typically be required to serve
a development containing 408 units.
With the construction of the first phase of the apartments the street
improvements to South Bowman Road will be completed adjacent to the
70+ acre site. These improvements include one-half street construction to
Master Street Plan standard. The certificate of occupancy for the first phase of
the apartments will not be issued until the street construction is completed.
The request includes a variance from the City's Land Alteration ordinance to
allow grading of the entire site with the development of the first phase. The
applicant has stated the grading is necessary to allow the site to balance with
regard to cuts and fill. The applicant has stated the grading will not be visible
from South Bowman Road and any visual impact of the clearing will only be seen
from within the existing and the proposed new development area. The tract
adjacent to South Bowman Road will not be cleared or graded until the area is a
part of a development plan where construction is imminent.
The applicant has engaged a traffic engineer to review and prepare a traffic
analysis for this development and the potential impact of this development on
South Bowman Road. Staff and the traffic engineer are currently reviewing the
traffic analysis and will provide additional information at the public hearing.
STAFF RECOMMENDATION:
Staff recommendation forthcoming.
PLANNING COMMISSION ACTION: (NOVEMBER 19, 2015)
The applicants were present. There were a few registered objectors present. Staff
presented the item with a recommendation of approval.
Mr. Tim Daters of White Daters and associates addressed the Commission on behalf of
the application. Mr. Daters stated the development was a mixed use development
including single-family and multi -family residential, non-residential and/or a combination
of both. He stated the non-residential would be limited to density as allowed in the
MF-6 zoning district. He stated there was a 700 foot buffer along the western perimeter
of the site. Stated all other areas would be buffered with a minimum buffer width of
50 feet. He stated the land use for the property was RM, Residential Medium, which
allowed a density between 6 and 12 units per acre.
Mr. Keith Richardson addressed the Commission as the potential developer of the
property. He stated he was not actively seeking to purchase additional property. He
12
FILE NO.: Z-8503-D
stated the property owner contacted him to see if he was interested in purchasing the
land. He stated his primary objective for buying the land was to protect his existing
development. He stated the property was shown for multi -family on the City's land use
plan. He stated at some point the property would be developed as multi -family. He
stated his company had a substantial investment in the area and his goal was to protect
his investment.
Ms. Ruth Bell addressed the Commission in opposition of the request. She questioned
the number of units being built on substandard roads. She stated the Commission had
heard from residents on South Bowman and on Kanis Road both expressing their
concern with the growing traffic on these streets. She stated there was a concern with
placing a large number of apartments within one area. She stated this area appeared to
be ripe for apartment development. She requested the Commission to direct staff to
review the overall development plan for the area and determine the number of units
which could be expected and the carrying capacity of the roads in the area.
Devo Shipley addressed the Commission in opposition of the request. He stated he
was elected spokesman for the Woodlands Edge Neighborhood. He stated although
the Commission had received a letter of support from the POA Board not all residents
were in support of the development. He stated the POA Boards of both Brodie Creek
and Woodlands Edge had elected to not inform the residents of the proposed
development. He stated there were a number of concerned residents in the area who
were very opposed to the request. He stated traffic was a concern. He stated the
number of units concentrated in one area would decrease property values. He stated
there was a meeting with the residents on Wednesday November 18'h. He stated a
number of the residents felt this was a done deal and there was no way to oppose the
future development of the multi -family units. He stated he understood the land
was zoned for single-family and requested the Commission not rezone the property
for multi -family.
Mr. Richardson addressed the Commission stating there was a meeting with the
neighborhood. He stated he had worked with both the POA's for three (3) months and
modified the plan a number of times to address their concerns. He stated he felt the
property would develop with multi -family and he was the better developer to develop the
property based on his existing investment. He stated other developers would develop
the entire project without regard to occupancy rates in the City. He stated there were
40 to 45 residents in attendance at the meeting and there were only two (2) person here
today to address the Commission in opposition.
There was a general discussion by the Commission concerning the proposed
development and the areas to be set aside for green space. Mr. Richardson stated the
floodway would be placed in an open space zoned buffer. He stated all other areas
would be set aside for green space as well. Commissioner Bubbus questioned if the
open space areas were included in the multi -family portion of the development to
reduce the density. Mr. Richardson stated they were included in the multi -family portion
of the development and would remain as green space.
13
FILE NO.: Z-8503-D Cont.
There was a general discussion by the Commission concerning multi -family and the
overall longevity of multi -family developments. Mr. Richardson stated the difference in
his development and others was he had a substantial reserve for maintenance and
upkeep of the units. He stated the difference in Reservoir Road and his development
was maintenance and design. He stated the construction materials were superior to the
older development and the units were well maintained.
Ms. Joy Fugarsky addressed the Commission. She stated there were a number of
residents opposed to the development. She stated the residents had not been informed
of the development until earlier in the week. She stated the residents could not change
plans on such short notice. She stated residents had to work and could not get off and
there were commitments with others that could not be changed. She stated the
residents moved to Woodlands Edge because of the quality of the subdivision and the
large areas of green space. She stated a number of the residents at the meeting felt
the development was already approved and did not feel coming down to address the
Commission would change anything.
Mr. Janes Aronson addressed the Commission in opposition. He stated he felt the lack
of communication from the Brodie Creek POA Board was the reason there were not a
great number of residence in attendance. He stated he understood this was
neighborhood politics and not something the Commission could address. He stated
traffic in the area was heavy and it was difficult to exit the subdivision during the
AM rush. He stated he felt the traffic engineer had under projected the future traffic on
the street. He requested Mr. Richardson fund a traffic signal at the Bowman -Brodie
Creek intersection.
Mr. Ernie Peters of Peters and Associates addressed the Commission with regard to the
traffic study which had been prepared. He stated traffic in the area was currently heavy
and would continue to be heavy. He stated with this development the level of service
was not impacted significantly. He stated a review was made to determine the need for
traffic signals at various street intersections with South Bowman Road. He stated
Brodie Creek did meet the AM warrant but did not meet warrants any other time of day.
The Commission questioned the location and the desire for the number of units being
built and projected for the area. Mr. Richardson stated the area was convenient to
shopping and work. He stated there were a number of medical personnel who lived in
his apartments as well as residents who worked downtown. He stated this location was
convenient to interstate access. He stated the residents of the area also felt safe.
He stated the one bedroom units rented for $1,000 per month up to $1,600 for a
three bedroom. He stated with the rents being paid most of the residents could afford to
make a house payment but chose to rent instead.
A motion was made to approve the request as recommended by staff. The motion
carried by a vote of 7 ayes, 4 noes and 0 absent. A motion was made to approve the
advanced grading request. The motion carried by a vote of 7 ayes, 4 noes and
0 absent.
14
FILE NO.: Z-8503-D (Cont.
STAFF UPDATE:
This item was on the Board of Directors agenda for March 1, 2016, at which a
lengthy discussion took place. During the discussions the applicant offered three
(3) amendments to the application which the Board of Directors determined were
significant modifications and requested the item be returned to the Commission for
review and consideration of the three (3) amendments. The three (3) amendments
included the construction of a round -about on South Bowman Road at the Brodie Creek
entrance, the commitment to develop single-family homes along the northern portion of
the development area and that the single-family homes would have a minimum lot width
of 80-feet and there would a green space buffer of a minimum of 50-feet
between the proposed single-family homes and the existing homes located in the
Brodie Creek Subdivision.
The applicant contacted staff on March 25, 2016, stating additional time was necessary
to provide concise details of the proposed layout of the development and the
proposed round -about. Staff recommends deferral of this item to the May 19, 2016,
public hearing.
PLANNING COMMISSION ACTION:
(APRIL 7, 2016)
The applicant was present. There were no registered objectors present. Staff
presented the item stating the applicant had contacted them on March 25, 2016, stating
additional time was necessary to provide concise details of the proposed layout of the
development and the proposed round -about. Staff presented a recommendation of
deferral of the item to the May 19, 2016, public hearing. There was no further
discussion. The item was placed on the consent agenda and approved as
recommended by staff by a vote of 8 ayes, 0 noes and 3 absent.
STAFF UPDATE:
As noted previously this item was before the Board of Directors at their March 1, 2016,
meeting and during the discussions the applicant offered three (3) amendments to the
application which the Board of Directors determined were significant modifications and
requested the item be returned to the Commission for review and consideration of
the three (3) amendments. The applicant has provided to staff their intent for the three
(3) amendments. They are as follows:
1. Contribute $100,000 towards the construction of a traffic signal or roundabout
at the intersection of Brodie Creek Trail and Bowman Road. This would be
available for a period of five (5) years from approval of the PRD.
2. Provide a 50 foot wide buffer along the northern boundary of the PRD. No
trees would be removed from the buffer, but additional plant materials may be
added as part of an approved Landscape Plan.
15
FILE NO.: Z-8503-D
3. That portion of the PRD marked "Proposed Residential" will be developed as
single family residential, with lots widths and home sizes similar to those in
either the Brodie Creek and/or Woodlands Edge developments.
The Board's directive to the Commission was to review these three (3) modifications
and determine if the modifications would change the Planning Commission's
recommendation of the item.
Staff has reviewed the amendments proposed by the developer. The developer at this
time is not providing the same amendments as presented to the Board of Directors.
At the Board meeting, the developer proposed to fully fund and construct a roundabout
with construction of the proposed development. Staff has not provided suggestions nor
agreed on what improvements or amendments are needed since the Board of Directors
meeting.
From review, staff does not recommend approval of condition #1 as stated. The
contribution of $100,000 only partially funds (less than half) the construction of either a
traffic signal or roundabout at the Brodie Creek Trail and Bowman Road
intersection. The additional funding needed and the actual construction would have to
come from other sources and not the development. At this time, a public street project
is not proposed for Bowman Road.
PLANNING COMMISSION ACTION: (MAY 19, 2016)
Mr. Tim Daters of White-Daters and Associates was present representing the request.
There were registered objectors present. Staff presented the item stating the applicant
had amended the request related to Condition #1. Staff stated the applicant's current
proposal before the Commission for consideration were as follows:
1. Construct a single lane roundabout including landscape and restoration of landscape
within the right-of-way provided or when warranted, and within five years of approval
of the PRD, the developer will pay the City of Little Rock for the cost of constructing,
or construct, a traffic signal. The constructed signal improvements consists of
necessary poles, foundations, mast arms, signal heads, pedestrian poles and heads
for pedestrians crossings as needed, conduits, wiring, cabinet, controller, radio,
video equipment, electrical service connection and all incidental work related
there to.
2. Provide a 50 foot wide buffer along the northern boundary of the PRD. No trees
would be removed from the buffer, but additional plant materials may be added as
part of an approved Landscape Plan.
3. That portion of the PRD marked "Proposed Residential" will be developed as single
family residential, with lots widths and home sizes similar to those in either the
Brodie Creek and/or Woodlands Edge developments.
16
FILE NO.: Z-8503-D Cont.
Staff stated the Board's directive to the Commission was to review these
three (3) modifications and determine if the modifications would change the Planning
Commission's recommendation of the item.
Mr. Tim Daters addressed the Commission stating the three (3) items were related to
buffering, lot sizes and the construction of a traffic light or a roundabout. He stated his
client was willing to construct either the roundabout or fully fund the traffic signal.
Mr. Daters stated the funds would be placed in escrow for a period of five (5) years.
Mr. David Shipley addressed the Commission in opposition of the request. He stated to
move forward with the apartments at this time should not occur. He stated there was an
overabundance of apartments in the area. He stated Mr. Richardson had met with the
Brodie Creek POA but not the Woodlands Edge POA in recent months. He stated the
last meeting with Woodlands Edge was in November. He stated the reason there were
not more residents in attendance at the previous public hearing was because the
residents were unaware of the proposal. He stated the long range plan included single-
family for this area and not more apartments. He stated the apartments were not only
bad for Brodie Creek and Woodlands Edge but for Cherry Creek as well. He stated
Cherry Creek was a good starter home neighborhood. He stated with the construction
of additional apartments the area would no longer be in demand. He requested the
Commission and City hold off on approving more apartments until the final study was
completed for the need for multi -family in the area.
Ms. Jane Evans addressed the Commission. She stated she had been contacted by a
Master Gardener stating Brodie Creek would be a good area for a spring tour next year.
Ms. Evans stated she then informed the person she was working to prepare for today's
meeting concerning the construction of apartments in the area. She stated the person
could not believe the City would allow the construction of additional apartments in the
area and to allow such a beautiful area to be destroyed. Ms. Evans stated she did not
drive and recent rode with Uber. She stated she questioned the person driving as to the
number of fairs in the area and the age of the persons. She stated the driver told her
the persons were young and were usually out having a good time and did not need to
drive themselves. She stated Mr. Richardson had indicated the residents of his
development were young professionals. She stated the driver indicated he felt the
residents he drove were college students. She stated if she had known there would be
apartments in the area when she bought her home she would not have bought. She
stated recently she met a new neighbor and questioned if she would have bought in the
neighborhood if she had known the number of apartments proposed and developed in
the area. She stated the young lady stated she would have bought elsewhere if she
had known the number of apartments proposed and within the area. She stated there
were currently drainage issues in the area. She stated with the additional development
drainage problems would only increase.
Ms. Jamie Shipley addressed the Commission. She stated her concerns were the City
rezoning property and not following their land use plan. She stated most residents
bought their homes based on the Future Land Use Plan and the zoning of property.
She stated there was also a concern of the City's notification process. She stated only
17
FILE NO.: Z-8503-D Cant.
residents within 200 feet of the site were notified of the public hearing. She stated the
original hearing before the Commission the residents were not informed of the hearing
until two (2) days before the meeting. She stated most of the residents of the
neighborhood worked and had children. She stated a two (2) day notice did not allow
ample time to prepare for the meeting. She stated in meeting with the developer the
tone of the meeting had been if you don't support this proposal I will give you something
you do not like. She stated it appeared the City put the wants of the developers before
the wants of the neighborhood. She stated the City did not have the funds to build
streets and therefore told the developer you build the street and we will allow the
zoning. She stated this practice put the neighborhood at a disadvantage.
Ms. Shipley stated the developer's willingness to fund a roundabout or a traffic signal
was not the best plan. She stated the roundabout would not work on a busy street like
Bowman Road. She stated the 50 foot buffer being proposed was not a true buffer.
She stated she understood the Commission had taken a field trip recently and had
driven by this area as a part of the trip. She stated the buffer proposed by the applicant
was the same buffer being provided along the northern perimeter of his development on
the east side of Bowman Road. She stated there was not a buffer in place just a
scattering of trees and undergrowth. She questioned what would happen when the
developer was unable to sell the single-family lots at a price necessary to recoup his
cost based on the price he paid for the land would he then return to the Commission
asking for more apartments. She stated the process was an unfair process. She stated
Mr. Richardson had purchased the property. She stated she felt he know the vote when
he purchase single-family zoned property at the cost of apartment land.
Mr. Doug Steward addressed the Commission in opposition. He stated his home was in
Brodie Creek and he used Bowman Road to travel to Kanis. He stated the traffic in the
area had increased. He stated there was not a consensus in the neighborhood
concerning a traffic signal or a roundabout. He stated he did not feel the decision of
which to install should be determined by the residents with no expertise in determining
the best fit for the street. He stated the Commission should hold off on approving the
development until all the current development in the area was completed.
Casey Covington addressed the Commission. He stated his home was in
Cherry Creek and when he bought his home there were no apartments on South
Bowman Road. He stated since that time three (3) apartment developments had been
approved on South Bowman Road. He stated the argument the residents were making
was the same argument presented by staff in the original proposal submitted by the
developer. He stated the Commission should look at the full development plan for an
area. He requested the Commission support the neighborhoods and not support the
development.
Mr. Dan Veach addressed the Commission. He stated his home was located in
Woodlands Edge behind the proposed development area. He stated based on the
zoning the property was to develop as single-family. He stated with the approval of the
im
FILE NO.: Z-8503-D [Cont.
apartments this would change from single-family homes to near 3,000 people in his
back yard. He stated he understood the battle was at the Board but felt the
Commission's job was to protect the neighborhoods.
Mr. Daters stated the project was the same project the Commission approved in
November. He stated the request before the Commission was to determine if the
three (3) additional conditions proposed by the applicant were of benefit to the project.
He stated the development included 27 acres of single-family lots adjacent to the Brodie
Creek Subdivision. He state the developer was proposing to provide a buffer between
his development and the single-family homes in Brodie Creek. He stated this was not
required or provided anywhere else in the City.
There was a lengthy discussion concerning the funding of the traffic signal or the
roundabout. Mr. Daters stated the improvement would be completed when the City felt
the improvement was necessary. He stated the traffic volumes today did not meet the
warrants for the placement of the signal. He stated the roundabout was not required to
meet any measure of traffic flow.
The Commission questioned what would happen if the warrants were not met in
five (5) years. Staff stated the funds would be returned to the developer.
Commissioner Bubbus questioned Mr. Daters if the funds could be placed in escrow for
a longer period of time. Mr. Daters stated he was willing to amend his request
regarding the funding the proposed improvement. He stated the developer would
construct the improvement (a traffic signal or a roundabout) when the need was met as
determined by the City with the various phases of the proposed apartment development
or if the need for the improvement was not met by the final phase of the proposed
apartment development the developer would place the cost of the improvement with the
City in the form of an in -lieu payment and allow the funds to remain with the City for a
period of five (5) years from the date of completion of the final phase of the proposed
apartment development.
A motion was made to accept the three (3) conditions as proposed and amended by the
developer. The motion carried by a vote of 7 ayes, 4 noes and 0 absent.
19
FILE NO.: Z-8503-D
NAME: Herrick Heights Long -form PD-R
LOCATION: Located on the west side of South Bowman Road between Brodie Creek
Subdivision and the Pointe at Brodie Creek Apartments
DEVELOPER:
The Pointe at Brodie Creek, LLC
9800 Maumelle Boulevard
North Little Rock, AR 72113
FNC;INFFR
White-Daters and Associates
24 Rahling Circle
Little Rock, AR 72223
AREA: 70+ acres
CURRENT ZONING
ALLOWED USES
PROPOSED ZONING
PROPOSED USE
NUMBER OF LOTS: 1
R-2, Single-family
Single-family residential
m
FT. NEW STREET: 0 LF
Single-family, Multi -family, 0-1, Quiet Office District
VARIANCEMAIVERS: A variance from the City's Land Alteration Ordinance to allow
grading of the entire multi -family development site with the development of the first
phase of the apartments.
BACKGROUND:
On October 8, 2015, the Planning Commission denied a request to rezone 23 acres of
an overall larger tract from R-2, Single-family to Planned Development Residential to
allow construction of 400+ units of multi -family housing. The developer had indicated
an overall development plan including boundary street improvements to South Bowman
Road and a commitment to develop the northern portion of the property as single-family.
The rezoning request did not include the entire 70+ acres and there were no measures
for staff to enforce the developer's proposal.
FILE NO.: Z-8503-D Cont.)
A. PROPOSAUREQUEST/APPLICANT'S STATEMENT:
The applicant is now proposing to rezone the entire site (73.95-acres) to Planned
Development Residential to allow for an overall development plan of the entire
acreage. The proposal includes the entire tract the developer is proposing to
purchase. The plan indicates the northern portion of the site with single-family
detached homes. There is an area located along South Bowman Road which is
indicated for future development with a use other than multi -family. The plan
indicates single-family residential contained within 27.25 acres, the multi -family
development contained on 23.45 aces, floodway and open space containing
11.75 acres and 0-1, Quiet Office District uses containing 11.50 acres.
The multi -family development will be accessed from the existing development
located on South Bowman Road. The multi -family portion of the development is
proposed with 408 units. The units will be developed in phases with 120 units
open for leasing in 2017, 96 units in 2018, 96 units in 2019 and 96 units in 2020.
B. EXISTING CONDITIO
C
The overall site contains 70+ acres located on the west side of South Bowman
Road. The entire site is heavily wooded and is occupied by one single-family
home. The area proposed for rezoning to Planned Development Residential is
located to the rear of this acreage and is not visible from South Bowman Road.
In this area there are 600 units constructed to the south of this site in the Pointe
at Brodie Creek. There are an additional 500 units approved located across
South Bowman Road. Clearing and grading has been completed and there are
currently buildings under construction. Across from the 70-acre parcel is
a nursing home and single-family homes located in the Sandpiper Subdivision.
North of the parcel are single-family homes located in the Brodie Creek
subdivision. South Bowman Road is an unimproved roadway with open ditches
for drainage.
NEIGHBORHOOD COMMENTS:
As of this writing, staff has received several informational phone calls from area
property owners. All property owners located within 200 feet of the site along
with the Woodlands Edge Community Association and the John Barrow
Neighborhood Association were notified of the public hearing.
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. A grading permit in accordance with Section 29-186 (c) and (d) will be
required prior to any land clearing or grading activities at the site. Other
than residential subdivisions, site grading and drainage plans must be
7
FILE NO.: Z-8503-D (Cont.
submitted and approved prior to the start of construction. Is a variance
requested to advance grade future phases of construction with construction
of Phase 1 ?
2. Stormwater detention ordinance applies to this property. Show the
proposed location for stormwater detention facilities on the plan.
3. If disturbed area is 1 or more acres, obtain a NPDES stormwater permit
from the Arkansas Department of Environmental Quality prior to the start of
construction.
4. A special Grading Permit for Flood Hazard Areas will be required per
Section 8-283 prior to construction.
5. The minimum Finish Floor elevation of at least 1 foot above the base flood
elevation of Building 6 and 7 should be shown on grading plans.
6. In accordance with Section 31-176, floodway areas must be shown as
floodway easements or be dedicated to the public. In addition, a 25 foot
wide drainage and access easement is required adjacent to the floodway
boundary.
7. Alteration of the water course will require approval from the Little Rock
District of the US Army Corps of Engineers prior to start of work.
8. Prior to construction of retaining walls, an engineer's certification of design
and plans must be submitted to Public Works for approval. After
construction, an as -built certification is required for construction of the
retaining wall.
9. The owner and/or manager of each multi -family residence of 100 or more
dwelling units shall provide recycling and encourage participation by the
tenants, renters, or owners of each unit. Contact Melinda Glasgow at
501.371.4646 mglasaaw r littlerock.org for more information. Show the
trash and recycling locations on the site plan.
10. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
11. Bowman Road is classified on the Master Street Plan as a minor arterial.
A dedication of right-of-way 45 feet from centerline will be required.
12. With site development, provide the design of street conforming to the
Master Street Plan. Construct one-half street improvement to Bowman
Road including 5-foot sidewalks with the planned development. The new
back of curb should be located 29.5 feet from centerline. A left turn lane
should be provided for all driveways.
13. Submit a Traffic Impact Study for the proposed project. Study should
address trip generation and trip distribution for the development and also
should take into account existing and projected traffic growth. Study should
include: Roadway Level of Service Analysis for 2-lane sections of Bowman
Road. (Existing and projected), and signal warrant analysis for Bowman at
Cherry Side and Brodie Creek.
3
FILE NO.: Z-8503-D (Cont.
14. If the north driveway will be used for more than secondary emergency
access, provide a letter prepared by a registered engineer certifying the
sight distance at the intersection(s) comply with 2004 AASHTO Green Book
standards.
15. If the driveway will be used other than secondary emergency access, the
driveway should be paved with asphalt, curb and gutter.
16. Show the proposed driveways or access locations to the proposed
residential and proposed non-residential use areas.
E. UTILITIES AND FIRE DEPARTMENT/COUNTY PLANNING:
Wastewater: Sewer main extension required with easements if new sewer
service is required for this project. Capacity fee analysis required. Contact Little
Rock Wastewater Utility for additional information.
Entergy: Entergy does not object to this proposal. A three phase power line
exists along the east side of Bowman Road on the east side of this property.
Another 3 phase line exists to the north of the property. There do not appear to
be any conflicts with existing Entergy facilities. Contact Entergy in advance
regarding future service requirements to the development and future facilities
locations as this project proceeds.
CenterPoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for
water service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine
whether additional public and/or private fire hydrant(s) will be required.
If additional fire hydrant(s) are required, they will be installed at the
Developer's expense.
3. Please submit plans for water facilities and/or fire protection system to
Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures
for installation of water facilities and/or fire service. Approval of plans by the
Arkansas Department of Health Engineering Division and the Little Rock
Fire Department is required.
4. A Capital Investment Charge based on the size of meter connection(s) will
apply to this project in addition to normal charges. This fee will apply to all
connections including metered connections off the private fire system.
4
FILE NO.: Z-8503-D
5. If there are facilities that need to be adjusted and/or relocated, contact
Central Arkansas Water. That work would be done at the expense of the
developer.
6. Contact Central Arkansas Water regarding the size and location of water
meter.
7. Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZA) is required on the
domestic water service. This assembly must be installed prior to the first
point of use. Central Arkansas Water requires that upon installation of the
RPZA, successful tests of the assembly must be completed by a Certified
Assembly Tester licensed by the State of Arkansas and approved by
Central Arkansas Water. The test results must be sent to Central Arkansas
Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226
if you would like to discuss backflow prevention requirements for this
project.
8. The facilities on -site will be private. When meters are planned off private
lines, private facilities shall be installed to Central Arkansas Water's
materials and construction specifications and installation will be inspected
by an engineer, licensed to practice in the State of Arkansas. Execution of
a Customer Owned Line Agreement is required.
9. Fire sprinkler systems which do not contain additives such as antifreeze
shall be isolated with a double detector check valve assembly. If additives
area used, a reduced pressure zone back flow preventer shall be required.
10. This development will have minor impact on the existing water distribution
system. Proposed water facilities will be sized to provide adequate
pressure and fire protection.
Fire Department:
Maintain Access:
Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.1 Access road width with a hydrant. Where a fire hydrant is located on a
fire apparatus access road, the minimum road width shall be 26 feet, exclusive of
shoulders.
Grade. Maintain fire apparatus access roads as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire
apparatus access roads shall not exceed 10 percent in grade except as
approved by the fire chief.
Loading. Maintain fire apparatus access road design as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and
loading. Facilities, buildings or portions of buildings hereafter constructed shall
be accessible to fire department apparatus by way of an approved fire apparatus
5
FILE NO.: Z-8503-D (Cont.
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least
75,000 pounds.
30' Tall Buildings - Maintain aerial fire apparatus access roads as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D105.1 — D105.4
D105.1 Where Required. Where the vertical distance between the grade
plane and the highest roof surface exceed 30', approved aerial fire apparatus
access roads shall be provided. For the purposes of this section the highest roof
surfaces shall be determined by measurement to the eave of a pitched roof, the
intersection of a roof to the exterior wall, or the top of the parapet walls,
whichever is greater.
D105.2 Width. Aerial fire apparatus access roads shall have a minimum
unobstructed with of 26', exclusive of shoulders, in the immediate vicinity of the
building or portion thereof.
D105.3 Proximity to building. At least one of the required access routes
meeting this condition shall be located within a minimum of 15 feet and a
maximum of 30 feet from the building, and shall be positioned parallel to one
entire side of the building. The side of the building on which the aerial fire
apparatus access road is positioned shall be approved by the fire code official.
D105.4 Obstructions. Overhead utility and power lines shall not be
located over the aerial fire apparatus access road or between the aerial fire
apparatus road and the building. Other obstructions shall be permitted to be
places with the approval of the fire code official.
Dead Ends. Maintain fire apparatus access roads at dead end locations as
per Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section
D103.4 Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet
shall be provided with width and turnaround provisions in accordance with Table
D103.4. Requirements for Dead-end fire apparatus access roads.
Gates. Maintain fire apparatus access road gates as per Appendix D of the
2012 Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus
access road gates. Gates securing the fire apparatus access roads shall
comply with all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by
one person.
4. Gate components shall be maintained in an operable condition at all times
and replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices
shall be approved by the fire code official.
0
FILE NO.: Z-8503-
6. Manual opening gates shall not be locked with a padlock or chain and
padlock unless they are capable of being opened by means of forcible
entry tools or when a key box containing the keys to the lock is installed at
the gate location.
7. Locking device specifications shall be submitted for approval \by the fire
code official
8. Electric gate operators, where provided, shall be listed in accordance with
U L 325.
9. Gates, intended for automatic operation shall be designed, constructed
and installed to comply with requirements of ASTM F 2200.
Multi -Family Residential Developments. As per Appendix D, Section
D106.1 of the 2012 Arkansas Fire Prevention Code Vol. 1. Projects having
more than 100 dwelling units. Multiple -family residential projects having more
than 100 dwelling units shall be equipped throughout with two separate and
approved fire apparatus access roads.
Exception: Projects having up to 200 dwelling units may have a single
approved fire apparatus access road when all building, including nonresidential
occupancies are equipped throughout with approved automatic sprinkler systems
installed in accordance with Section 903.3.1.1 or 903.3.1.2.
As per Appendix D, Section D106.2 of the 2012 Arkansas Fire prevention
Code Vol. 1. Projects having more than 200 dwelling units. Multiple -family
residential projects having more than 200 dwelling units shall be provided with
two separate and approved fire apparatus access roads regardless of whether
they are equipped with an approved automatic sprinkler system.
Fire Hydrants. Locate Fire Hydrants as per Appendix C of the
2012 Arkansas Fire Prevention Code. Section C101 — C105, in conjunction
with Central Arkansas Water (Jason Lowder 501.377.1245) and the Little Rock
Fire Marshal's Office (Captain Tony Rhodes 501.918.3757 or Capt. John Hogue
501-918-3754). Number and Distribution of Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: The area is not currently served by METRO. We would like
to emphasize maintaining the sidewalk connections to the neighborhood for
transit rider access to jobs and shopping. The area is part of our future plans for
the West Little Rock express and community shuttle/flex service. METRO has
plans to continue to serve near the area on Route 9 and plans to provide service
enhancements.
7
FILE NO.: Z-8503-D Cont.
F. ISSUES/TECHNICAL/DESIGN:
Building Code: Project is subject to full commercial plan review and approval
prior to issuance of a building permit. For information on submittal requirements
and the review process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; crichey@ littlerack.orq or
Mark Alderfer at 501.371.4875; jTalderfer littlerock.orq.
Plannin Division: This request is located in the Ellis Mountain Planning District.
The Land Use Plan shows Residential Low Density (RL) and Residential Medium
Density (RM) for this property. Residential Low Density allows for single family
homes at densities not to exceed 6 dwelling units per acre. Such residential
development is typically characterized by conventional single family homes, but
may also include patio or garden homes and cluster homes, provided that the
density remain less than 6 units per acre. Residential Medium Density
accommodates a broad range of housing types including single family attached,
single family detached, duplex, town homes, multi -family and patio or garden
homes. Any combination of these and possibly other housing types may fall in
this category provided that the density is between six (6) and twelve (12) dwelling
units per acre. The applicant has applied for a rezoning from R-2 (Single Family
District) to PDR (Planned District Residential) to allow the construction of an
apartment development at 17.4 units per acre, 27 acres of single family at an
undetermined density and 11.5 acres of unknown non-residential uses on
the site.
Master Street Plan: Bowman Road is a Minor Arterial on the Master Street Plan.
A Minor Arterial provides connections to and through an urban area and their
primary function is to provide short distance travel within the urbanized area.
Entrances and exits should be limited to minimize negative effects of traffic and
pedestrians on Bowman Road. This street may require dedication of right-of-way
and may require street improvements for entrances and exits to the site.
Bicycle Plan: A Class II Bike Lane is shown along Bowman Road. Bike Lanes
provide a portion of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance
requirements.
2. The north, south, and east properties are zoned R-2. As a component of all
land use buffer requirements, opaque screening, whether a fence or other
device, a minimum of six (6) feet in height shall be required along these
perimeters of the site.
3. Eight percent (8%) of the vehicular use area must be designated for green
space; this green space needs to be evenly distributed throughout the parking
area(s). For developments with more than one hundred fifty (150) parking
0
FILE NO.: Z-8503-D (C
spaces the minimum size of an interior landscape area shall be three hundred
(300) square feet. Interior islands must be a minimum of seven and one half
(7 1/2) feet in width. Trees shall be included in the interior landscape areas at
the rate of one (1) tree for every twelve (12) parking spaces.
4. An automatic irrigation system to water landscaped areas shall be required
for developments of one (1) acre or larger.
5. The development of two (2) acres or more requires the landscape plan to be
stamped with the seal of a Registered Landscape Architect.
6. The City Beautiful Commission recommends preserving as many existing
trees as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper
or larger.
G. SUBDIVISION COMMITTEE COMMENT.
(October 28, 2015)
Mr. Tim Daters of White-Daters and Associates was present representing the
request. Staff presented an overview of the item stating there were additional
items necessary to complete the review process. Staff requested Mr. Daters
provide details of the proposed development including the proposed street
construction plan. Staff requested he provide the proposed signage plan, the
proposed phasing plan and the future uses of the area identified as
non-residential.
Public Works comments were addressed. Staff stated a grading plan was
required prior to any development of the site. Staff also stated a traffic impact
study was required for the proposed development. Staff questioned the driveway
access between the existing and new development. Mr. Daters stated the drive
would serve as the construction access and upon completion of the project the
drive would provide exit only service to the residence. Staff requested Mr. Daters
provide a sketch grading and drainage plan.
Landscaping comments were addressed. Staff stated a land use buffer was
required along the sites northern, western and eastern perimeters. Staff stated
screening was also required along the same perimeters. Staff stated an
automatic irrigation system to water landscape areas was required at the time of
development. Staff stated a minimum of eight percent (8%) of the interior paved
areas was to be landscaped.
There were no more issues for discussion. The Committee then forwarded
the item to the full Commission for final action.
H. ANALYSIS:
The applicant submitted a revised site plan to staff addressing most of the
technical issues associated with the request raised at the October 28, 2015,
Subdivision Committee meeting. The applicant has provided the proposed
9
FILE NO.: Z-8503-D [Cont.
building elevations, the construction materials, location and material of any
proposed fencing and the location of any proposed signage. The applicant has
also provided the proposed phasing plan and indicated the development would
not be subdivided into separate lots.
The project is approximately 70-acres located on the west side of South of
Bowman Road between the Brodie Creek Subdivision and the Pointe at Brodie
Creek apartments. The request is a rezoning of this site from R-2, Single-family
to Planned Development Residential to allow the approval of the zoning and a
site plan for 408 units of multi -family housing, future development of age
restricted residential or single-family and 0-1, Quiet Office District.
The multi -family portion of the development is an addition to the existing
600 units located to the south of this site. The acreage of this area is
23.45-acres. This development is proposed containing 408 units. There is an
emergency access which will also serve as an exit drive along this property's
southern boundary to allow egress for the residents of this development.
All ingress is from the existing drive serving the Pointe at Brodie Creek
apartments.
An area along the northern perimeter is indicated on the site plan for future
development of single-family or age restricted housing. The area of this portion
of the site contains 27.25-acres. The development of this area will include
detached homes, which will conform to the development criteria of the R-2,
Single-family zoning district. If developed as attached age restricted housing the
density will not exceed six (6) units per acre.
The applicant has indicated the future use of the non-residential portion of the
site. The acreage of this area is 11.50-acres. The applicant has indicated this
area will develop with uses as allowed within the 0-1, Quiet Office Zoning
District. In addition to 0-1, the applicant is requesting the allowance of a nursing
home or convalescent home or attached residential homes at a density not to
exceed six (6) units per acre.
Within the 70+ acre tract the proposal includes maintaining 11.75-acres which is
located within the floodway or has been designated as open space. These buffer
areas are along the northern, eastern and western perimeters of the proposed
multi -family development area. The minimum width of the open space buffer will
be 50-feet. The plan also includes an area along South Bowman Road which will
be retained as an open space buffer should the area develop with a residential
use. The open space buffers for the most part are to remain in their natural state
unless approved for modification by the City. Within the buffer areas recreational
use by the adjacent residents will be allowed. Construction of walks, walking
paths, parks and playgrounds will be allowed. Utilities will be allowed to cross
the open space buffers provided the utilizes are placed in a manner so as to
minimize the disturbance to existing vegetation and work necessary to maintain
underground utilities. Any work authorized by the City for any necessary
maintenance related to stormwater drainage will be allowed. Should it become
10
FILE NO.: Z-8503-D (Cont.
necessary in the future to provide access across the street the applicant will work
with the City and FEMA to determine the best access with the least disturbance.
The development is proposed with materials similar to the existing apartments.
The building materials will include brick, stone, drivit and/or siding. The roof will
be asphalt architectural shingles. The building is proposed with a maximum
building height of 45-feet. The buildings are proposed as three (3) story
buildings.
The site plan indicates the placement of dumpsters in various locations
throughout the site. The dumpsters will be screened per the typical ordinance
requirement or a minimum of two (2) feet above the height of the trash container.
Recycling will also be provided for the development. Recycling containers will
also be screened per the minimum ordinance standard. The hours of dumpster
service have been limited to daylight hours.
The site plan notes wood fencing will be placed along the site's, northern,
eastern and western perimeter. The site plan also notes an 8-foot tall vinyl fence
will be installed on the north and eastern perimeter. The note states all fencing
and locations will match the fencing installed within the existing development.
The applicant has indicated no new signage is proposed for this development.
The development does not have street frontage and signage and the placement
of signage would be of no benefit to the development. All ingress to the site is
from the existing drive entrance which has signage within an entrance feature
along South Bowman Road.
The development is proposed in four (4) phases. Phase I includes the
construction of five (5) buildings and a pool and pool house. Phase II includes
the construction of two (2) additional buildings, Phase III will include the
construction of seven (7) buildings and in the final phase three (3) buildings will
be constructed. The development contains 17 buildings with 24 units per
building. Within the development there are 190 units with one (1) bedroom,
170 units with two (2) bedrooms and 48 units have three (3) bedrooms.
Construction of the units will begin in June 2016 with the final phase of
construction beginning in June 2019. The plan includes the construction of
120 units in 2016, 96 units in each of the years from 2018 to 2020.
The development is proposed with 890 parking spaces. The plan indicates
102 garage spaces, 198 carport spaces and 590 uncovered spaces. Parking for
a multi -family development is based on one and one-half parking spaces per unit.
Based on this calculation 612 parking spaces would typically be required to serve
a development containing 408 units.
With the construction of the first phase of the apartments the street
improvements to South Bowman Road will be completed adjacent to the 70+
acre site. These improvements include one-half street construction to Master
11
FILE NO.: Z-8503-D
Street Plan standard. The certificate of occupancy for the first phase of the
apartments will not be issued until the street construction is completed.
The request includes a variance from the City's Land Alteration ordinance to
allow grading of the entire site with the development of the first phase. The
applicant has stated the grading is necessary to allow the site to balance with
regard to cuts and fill. The applicant has stated the grading will not be visible
from South Bowman Road and any visual impact of the clearing will only be seen
from within the existing and the proposed new development area. The tract
adjacent to South Bowman Road will not be cleared or graded until the area is a
part of a development plan where construction is imminent.
The applicant has engaged a traffic engineer to review and prepare a traffic
analysis for this development and the potential impact of this development on
South Bowman Road. Staff and the traffic engineer are currently reviewing the
traffic analysis and will provide additional information at the public hearing.
STAFF RECOMMENDATION:
Staff recommendation forthcoming.
PLANNING COMMISSION ACTION: (NOVEMBER 19, 2015)
The applicants were present. There were a few registered objectors present. Staff
presented the item with a recommendation of approval.
Mr. Tim Daters of White Daters and associates addressed the Commission on behalf of
the application. Mr. Daters stated the development was a mixed use development
including single-family and multi -family residential, non-residential and/or a combination
of both. He stated the non-residential would be limited to density as allowed in the
MF-6 zoning district. He stated there was a 700 foot buffer along the western perimeter
of the site. Stated all other areas would be buffered with a minimum buffer width of
50 feet. He stated the land use for the property was RM, Residential Medium, which
allowed a density between 6 and 12 units per acre.
Mr. Keith Richardson addressed the Commission as the potential developer of the
property. He stated he was not actively seeking to purchase additional property. He
stated the property owner contacted him to see if he was interested in purchasing the
land. He stated his primary objective for buying the land was to protect his existing
development. He stated the property was shown for multi -family on the City's land use
plan. He stated at some point the property would be developed as multi -family. He
stated his company had a substantial investment in the area and his goal was to protect
his investment.
Ms. Ruth Bell addressed the Commission in opposition of the request. She questioned
the number of units being built on substandard roads. She stated the Commission had
heard from residents on South Bowman and on Kanis Road both expressing their
12
FILE NO.: Z-8503-D (Cont.
concern with the growing traffic on these streets. She stated there was a concern with
placing a large number of apartments within one area. She stated this area appeared to
be ripe for apartment development. She requested the Commission to direct staff to
review the overall development plan for the area and determine the number of units
which could be expected and the carrying capacity of the roads in the area.
Devo Shipley addressed the Commission in opposition of the request. He stated he
was elected spokesman for the Woodlands Edge Neighborhood. He stated although
the Commission had received a letter of support from the POA Board not all residents
were in support of the development. He stated the POA Boards of both Brodie Creek
and Woodlands Edge had elected to not inform the residents of the proposed
development. He stated there were a number of concerned residents in the area who
were very opposed to the request. He stated traffic was a concern. He stated the
number of units concentrated in one area would decrease property values. He stated
there was a meeting with the residents on Wednesday November 18th. He stated a
number of the residents felt this was a done deal and there was no way to oppose the
future development of the multi -family units. He stated he understood the land
was zoned for single-family and requested the Commission not rezone the property
for multi -family.
Mr. Richardson addressed the Commission stating there was a meeting with the
neighborhood. He stated he had worked with both the POA's for three (3) months and
modified the plan a number of times to address their concerns. He stated he felt the
property would develop with multi -family and he was the better developer to develop the
property based on his existing investment. He stated other developers would develop
the entire project without regard to occupancy rates in the City. He stated there were
40 to 45 residents in attendance at the meeting and there were only two (2) person here
today to address the Commission in opposition.
There was a general discussion by the Commission concerning the proposed
development and the areas to be set aside for green space. Mr. Richardson stated the
floodway would be placed in an open space zoned buffer. He stated all other areas
would be set aside for green space as well. Commissioner Bubbus questioned if the
open space areas were included in the multi -family portion of the development to
reduce the density. Mr. Richardson stated they were included in the multi -family portion
of the development and would remain as green space.
There was a general discussion by the Commission concerning multi -family and the
overall longevity of multi -family developments. Mr. Richardson stated the difference in
his development and others was he had a substantial reserve for maintenance and
upkeep of the units. He stated the difference in Reservoir Road and his development
was maintenance and design. He stated the construction materials were superior to the
older development and the units were well maintained.
Ms. Joy Fugarsky addressed the Commission. She stated there were a number of
residents opposed to the development. She stated the residents had not been informed
of the development until earlier in the week. She stated the residents could not change
plans on such short notice. She stated residents had to work and could not get off and
13
FILE NO.: Z-8503-D (Cont.
there were commitments with others that could not be changed. She stated the
residents moved to Woodlands Edge because of the quality of the subdivision and the
large areas of green space. She stated a number of the residents at the meeting felt
the development was already approved and did not feel coming down to address the
Commission would change anything.
Mr. Janes Aronson addressed the Commission in opposition. He stated he felt the lack
of communication from the Brodie Creek POA Board was the reason there were not a
great number of residence in attendance. He stated he understood this was
neighborhood politics and not something the Commission could address. He stated
traffic in the area was heavy and it was difficult to exit the subdivision during the
AM rush. He stated he felt the traffic engineer had under projected the future traffic on
the street. He requested Mr. Richardson fund a traffic signal at the Bowman -Brodie
Creek intersection.
Mr. Ernie Peters of Peters and Associates addressed the Commission with regard to the
traffic study which had been prepared. He stated traffic in the area was currently heavy
and would continue to be heavy. He stated with this development the level of service
was not impacted significantly. He stated a review was made to determine the need for
traffic signals at various street intersections with South Bowman Road. He stated
Brodie Creek did meet the AM warrant but did not meet warrants any other time of day.
The Commission questioned the location and the desire for the number of units being
built and projected for the area. Mr. Richardson stated the area was convenient to
shopping and work. He stated there were a number of medical personnel who lived in
his apartments as well as residents who worked downtown. He stated this location was
convenient to interstate access. He stated the residents of the area also felt safe.
He stated the one bedroom units rented for $1,000 per month up to $1,600 for a
three bedroom. He stated with the rents being paid most of the residents could afford to
make a house payment but chose to rent instead.
A motion was made to approve the request as recommended by staff. The motion
carried by a vote of 7 ayes, 4 noes and 0 absent. A motion was made to approve the
advanced grading request. The motion carried by a vote of 7 ayes, 4 noes and
0 absent.
14
ITEM NO.: 13.
NAME: Herrick Heights Long -form PD-R
Z-8503-D
LOCATION: located on the west side of South Bowman Road between Brodie Creek
Subdivision and the Pointe at Brodie Creek Apartments
Planning Staff Comments:
1. Provide notification of the property owners located within 200-feet of the
development including the certified abstract list, notice form with affidavit executed
and proof of mailing. The notice must be mailed no later than November 4, 2015.
The Office of Planning and Development must receive the proof of notice no later
than November 13, 2015.
2. In addition to the graphic and supporting documentation required for filing, the owner
shall provide a graphic or narrative outline of methods to be employed to protect
permanent undisturbed buffers. The outline/plan shall be filed for review by the
planning commission not later than the filing date set by the calendar.
3. The applicant shall submit a copy of a valid bill of assurance for the subdivision
within which the subject property is located if such property is located within a
subdivision covered by a valid bill of assurance.
4. Indication of location of structures and structure dimensions, dimensioned distances
between buildings and distances from structures to property lines
5. Proposed treatment of the perimeter of the property, including materials and
techniques used such as screens, fences and walls as well as description of uses,
setbacks and their relationship to surrounding uses.
6. Provide the location of the proposed dumpster facilities to serve the multi -family.
The dumpster may not be located within the front yard setback. Provide a note
concerning the required screening of the proposed dumpster facilities to comply with
typical ordinance standards.
7. Will the hours of dumpster service be limited to daylight hours? If so include a note
on the site plan stating such (7 am to 6 pm Monday through Friday).
8. Provide details of any proposed fencing for the development including perimeter
fencing and any proposed interior fencing.
9. The PZD section of the ordinance requires a minimum of 10 to 15 percent of the
gross planned residential district acres to be designated as open space.
10. Will there be a subdivision and/or apartment identification sign? If so provide the
location(s) and the height and total sign area proposed for the signage.
11. Provide the proposed construction materials for the buildings including the proposed
roofing material.
12. Provide the proposed building elevations for the proposed structures.
13. Provide details of any proposed fencing located along the perimeters.
14. Provide the maximum building height and the number of stories of the proposed
structures.
15. Will the development be constructed in multiple phases or in a single phase?
Provide a detailed phasing plan for the multi -family units.
16. The site plan indicates an area of non-residential. Clarify this category. What is
anticipated for future development of this area?
17. How will access to the single-family be provided?
18.The site plan indicates an area of green/open space and a trail leading to South
Bowman Road as well as an area along South Bowman Road which appears to be
included in the green/open space. Please label the area and provide the intent of
this area.
Variance/Waivers: Land alteration variance
Public Works Conditions:
1. A grading permit in accordance with Section 29-186 (c) and (d) will be required prior
to any land clearing or grading activities at the site. Other than residential
subdivisions, site grading and drainage plans must be submitted and approved prior
to the start of construction. Is a variance requested to advance grade future
phases of construction with construction of Phase 1?
2. Stormwater detention ordinance applies to this property. Show the proposed
location for stormwater detention facilities on the plan.
3. If disturbed area is 1 or more acres, obtain a NPDES stormwater permit from the
Arkansas Department of Environmental Quality prior to the start of construction.
4. A special Grading Permit for Flood Hazard Areas will be required per Section 8-283
prior to construction.
5. The minimum Finish Floor elevation of at least 1 foot above the base flood elevation
of Building 6 and 7 should be shown on grading plans.
6. In accordance with Section 31-176, floodway areas must be shown as floodway
easements or be dedicated to the public. In addition, a 25 foot wide drainage and
access easement is required adjacent to the floodway boundary.
7. Alteration of the water course will require approval from the Little Rock District of the
US Army Corps of Engineers prior to start of work.
8. Prior to construction of retaining walls, an engineer's certification of design and plans
must be submitted to Public Works for approval. After construction, an as -built
certification is required for construction of the retaining wall.
9. The owner and/or manager of each multi -family residence of 100 or more dwelling
units shall provide recycling and encourage participation by the tenants, renters, or
owners of each unit. Contact Melinda Glasgow at 501.371.4646
mglaSgowCcr_littlerock.orq for more information. Show the trash and recycling
locations on the site plan.
10. Provide a Sketch Grading and Drainage Plan per Section 29-186 (e).
11. Bowman Road is classified on the Master Street Plan as a minor arterial. A
dedication of right-of-way 45 feet from centerline will be required.
12. With site development, provide the design of street conforming to the Master Street
Plan. Construct one-half street improvement to Bowman Road including 5-foot
sidewalks with the planned development. The new back of curb should be located
29.5 feet from centerline. A left turn lane should be provided for all driveways.
13. Submit a Traffic Impact Study for the proposed project. Study should address trip
generation and trip distribution for the development and also should take into
account existing and projected traffic growth. Study should include: Roadway Level
of Service Analysis for 2-lane sections of Bowman Road. (Existing and projected),
and signal warrant analysis for Bowman at Cherry Side and Brodie Creek.
14.If the north driveway will be used for more than secondary emergency access,
provide a letter prepared by a registered engineer certifying the sight distance at the
intersection(s) comply with 2004 AASHTO Green Book standards.
15.If the driveway will be used other than secondary emergency access, the driveway
should be paved with asphalt, curb and gutter.
16. Show the proposed driveways or access locations to the proposed residential and
proposed non-residential use areas.
Utilities and Fire Department/County Planning:
Wastewater: Sewer main extension required with easements if new sewer service is
required for this project. Capacity fee analysis required. Contact Little Rock
Wastewater Utility for additional information.
Entergy: Entergy does not object to this proposal. A three phase power line exists
along the east side of Bowman Road on the east side of this property. Another 3 phase
line exists to the north of the property. There do not appear to be any conflicts with
existing Entergy facilities. Contact Entergy in advance regarding future service
requirements to the development and future facilities locations as this project proceeds.
CenterPoint Energy: No comment received.
AT & T: No comment received.
Central Arkansas Water:
1. All Central Arkansas Water requirements in effect at the time of request for water
service must be met.
2. The Little Rock Fire Department needs to evaluate this site to determine whether
additional public and/or private fire hydrant(s) will be required. If additional fire
hydrant(s) are required, they will be installed at the Developer's expense.
3. Please submit plans for water facilities and/or fire protection system to Central
Arkansas Water for review. Plan revisions may be required after additional review.
Contact Central Arkansas Water regarding procedures for installation of water
facilities and/or fire service. Approval of plans by the Arkansas Department of
Health Engineering Division and the Little Rock Fire Department is required.
4. A Capital Investment Charge based on the size of meter connection(s) will apply to
this project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
5. If there are facilities that need to be adjusted and/or relocated, contact Central
Arkansas Water. That work would be done at the expense of the developer.
6. Contact Central Arkansas Water regarding the size and location of water meter.
7. Due to the nature of this facility, installation of an approved reduced pressure zone
backflow preventer assembly (RPZA) is required on the domestic water service.
This assembly must be installed prior to the first point of use. Central Arkansas
Water requires that upon installation of the RPZA, successful tests of the assembly
must be completed by a Certified Assembly Tester licensed by the State of Arkansas
and approved by Central Arkansas Water. The test results must be sent to Central
Arkansas Water's Cross Connection Section within ten days of installation and
annually thereafter. Contact the Cross Connection Section at 501.377.1226 if you
would like to discuss backflow prevention requirements for this project.
8. The facilities on -site will be private. When meters are planned off private lines,
private facilities shall be installed to Central Arkansas Water's materials and
construction specifications and installation will be inspected by an engineer, licensed
to practice in the State of Arkansas. Execution of a Customer Owned Line
Agreement is required.
9. Fire sprinkler systems which do not contain additives such as antifreeze shall be
isolated with a double detector check valve assembly. If additives area used, a
reduced pressure zone back flow preventer shall be required.
10. This development will have minor impact on the existing water distribution system.
Proposed water facilities will be sized to provide adequate pressure and fire
protection.
Fire Department:
Maintain Access:
Fire Hydrants. Maintain fire apparatus access roads at fire hydrant locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access
road width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Grade. Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas
Fire Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall
not exceed 10 percent in grade except as approved by the fire chief.
Loading. Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading. Facilities,
buildings or portions of buildings hereafter constructed shall be accessible to fire
department apparatus by way of an approved fire apparatus access road with an
asphalt, concrete or other approved driving surface capable of supporting the imposed
load of fire apparatus weighing at least 75,000 pounds.
30' Tall Buildings - Maintain aerial fire apparatus access roads as per Appendix D
of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D105.1 — D105.4
D105.1 Where Required. Where the vertical distance between the grade plane
and the highest roof surface exceed 30', approved aerial fire apparatus access roads
shall be provided. For the purposes of this section the highest roof surfaces shall be
determined by measurement to the eave of a pitched roof, the intersection of a roof to
the exterior wall, or the top of the parapet walls, whichever is greater.
D105.2 Width. Aerial fire apparatus access roads shall have a minimum
unobstructed with of 26', exclusive of shoulders, in the immediate vicinity of the building
or portion thereof.
D105.3 Proximity to building. At least one of the required access routes
meeting this condition shall be located within a minimum of 15 feet and a maximum of
30 feet from the building, and shall be positioned parallel to one entire side of the
building. The side of the building on which the aerial fire apparatus access road is
positioned shall be approved by the fire code official.
D105.4 Obstructions. Overhead utility and power lines shall not be located over
the aerial fire apparatus access road or between the aerial fire apparatus road and the
building. Other obstructions shall be permitted to be places with the approval of the fire
code official.
Dead Ends. Maintain fire apparatus access roads at dead end locations as per
Appendix D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4
Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
Gates. Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access road
gates. Gates securing the fire apparatus access roads shall comply with all of the
following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times and
replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices shall
be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or when
a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with UL
325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
Multi -Family, Residential Developments. As per Appendix D, Section D106.1 of
the 2012 Arkansas Fire Prevention Code Vol. 1. Projects having more than 100
dwelling units. Multiple -family residential projects having more than 100 dwelling units
shall be equipped throughout with two separate and approved fire apparatus access
roads.
Exception: Projects having up to 200 dwelling units may have a single
approved fire apparatus access road when all building, including nonresidential
occupancies are equipped throughout with approved automatic sprinkler systems
installed in accordance with Section 903.3.1.1 or 903.3.1.2
As per Appendix D, Section D106.2 of the 2012 Arkansas Fire prevention Code
Vol. 1. Projects having more than 200 dwelling units. Multiple -family residential
projects having more than 200 dwelling units shall be provided with two separate and
approved fire apparatus access roads regardless of whether they are equipped with an
approved automatic sprinkler system.
Fire Hydrants. Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas Water
(Jason Lowder 501.377.1245) and the Little Rock Fire Marshal's Office (Captain Tony
Rhodes 501.918.3757 or Capt. John Hogue 501-918-3754). Number and Distribution of
Fire Hydrants as per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment.
Rock Region Metro: The area is not currently served by METRO. We would like to
emphasize maintaining the sidewalk connections to the neighborhood for transit rider access to
jobs and shopping. The area is part of our future plans for the West Little Rock express and
community shuttlefflex service. METRO has plans to continue to serve near the area on Route 9
and plans to provide service enhancements.
Building Code: Project is subject to full commercial plan review and approval prior to
issuance of a building permit. For information on submittal requirements and the review
process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; crichev@littlerock.o[g or
Mark Alderfer at 501.371.4875; malderferCaD-littlerock.org.
Planning Division: This request is located in the Ellis Mountain Planning District. The
Land Use Plan shows Residential Low Density (RL) and Residential Medium Density
(RM) for this property. Residential Low Density allows for single family homes at
densities not to exceed 6 dwelling units per acre. Such residential development is
typically characterized by conventional single family homes, but may also include patio
or garden homes and cluster homes, provided that the density remain less than 6 units
per acre. Residential Medium Density accommodates a broad range of housing types
including single family attached, single family detached, duplex, town homes, multi-
family and patio or garden homes. Any combination of these and possibly other housing
types may fall in this category provided that the density is between six (6) and twelve
(12) dwelling units per acre. The applicant has applied for a rezoning from R-2 (Single
Family District) to PDR (Planned District Residential) to allow the construction of an
apartment development at 17.4 units per acre, 27 acres of single family at an
undetermined density and 11.5 acres of unknown non-residential uses on the site.
Master Street Plan: Bowman Road is a Minor Arterial on the Master Street Plan. A
Minor Arterial provides connections to and through an urban area and their primary
function is to provide short distance travel within the urbanized area. Entrances and
exits should be limited to minimize negative effects of traffic and pedestrians on
Bowman Road. This street may require dedication of right-of-way and may require
street improvements for entrances and exits to the site.
Bicycle Plan: A Class II Bike Lane is shown along Bowman Road. Bike Lanes provide a
portion of the pavement for the sole use of bicycles.
Landscape:
1. Site plan must comply with the City's landscape and buffer ordinance requirements.
2. The north, south, and east properties are zoned R-2. As a component of all land use
buffer requirements, opaque screening, whether a fence or other device, a minimum
of six (6) feet in height shall be required along these perimeters of the site.
3. Eight percent (8%) of the vehicular use area must be designated for green space;
this green space needs to be evenly distributed throughout the parking area(s). For
developments with more than one hundred fifty (150) parking spaces the minimum
size of an interior landscape area shall be three hundred (300) square feet. Interior
islands must be a minimum of seven and one half (7 1/2) feet in width. Trees shall
be included in the interior landscape areas at the rate of one (1) tree for every twelve
(12) parking spaces.
4. An automatic irrigation system to water landscaped areas shall be required for
developments of one (1) acre or larger.
5. The development of two (2) acres or more requires the landscape plan to be
stamped with the seal of a Registered Landscape Architect.
6. The City Beautiful Commission recommends preserving as many existing trees as
feasible on this site. Credit toward fulfilling Landscape Ordinance requirements can
be given when preserving trees of six (6) inch caliper or larger.
Revised plat/plan: Submit four (4) copies of a revised preliminary plat/plan (to include