HomeMy WebLinkAboutZ-9443 Staff AnalysisLE NO.: Z-9443
NAME: Freshly Renewed Short -form PID
LOCATION: 8404 Baseline Road
DEVELOPER:
Terrell Newton
Freshly Renewed Faith -Based Transitional
8404 Baseline Road
Little Rock, AR 72209
501-944-1406
OWNER/AUTHORIZED AGENT. -
Karen and John Hartnack/Owner
Terrell Newton/Agent
SURVEYOR/ENGINEER:
Hope Consulting Engineers-Surveyors/Surveyor
AREA: 0.81 acres
WARD: 7
CURRENT ZONING
ALLOWED USES:
NUMBER OF LOTS: 1
PLANNING DISTRICT: 15
1-2 Light Industrial
1-2 Light Industrial
FT. NEW STREET: 0 LF
CENSUS TRACT: 41.03
PROPOSED ZONING: PID
PROPOSED USE: Residential addiction treatment and transitional housing
with 1-2 uses.
VARIANCE/WAIVERS: None
FILE NO.: Z-9443 (Cont.
BACKGROUND:
The property at 8404 Baseline Road has been used as commercial and industrial -type
uses for a number of years. A proposal to allow a church and light industrial uses at the
site was submitted and withdrawn in 2008.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
Freshly Renewed is a faith -based nonprofit organization in operation since
November 2016, licensed with Peer Specialist, Counselors in Training supervised
by a drug and alcohol counselor licensed by the state. Freshly Renewed offers a
structured living facility for men and women who battle addiction providing a safe
environment to live sober and learn to be productive members of society.
Currently, Freshly Renewed has three locations in Little Rock. Approval of this
request consolidate two sites to 8404 Baseline Road. This larger facility would
allow for the organization to grow and offer more service to their clients.
8404 Baseline would be a treatment facility for men. Staff having offices there
would include a Licensed Therapist (LCSW), licensed counselors, peer specialist,
and managers. Living quarters for men suffering from drug, alcohol, and mental
illness would also be provided. Facility managers will reside at the location at all
times. The facility intends to accept clients from the VA, detox facilities such as
Bridgeway, Baptist, and St. Vincent, as well as the Department of Corrections.
The proposal seeks up to 40 beds available for clients during treatment. The
building would also have showers, toilets, and sinks for residents and a commercial
kitchen.
B. EXISTING CONDITIONS:
C
The property contains a 5600 square foot industrial building. Parking is located in
the front of the building and in the rear.
Situated on the edge of a commercial/industrial area located north of Baseline
Road, directly across Baseline Road is an apartment complex. Additional office
and commercial uses buffer the single-family neighborhood to the south.
NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comments from area property owners
or neighborhood associations. Notice of the public hearing was sent to all owners
of properties located within 200 feet of the site, as well as the West Baseline and
Southwest Little Rock United for Progress neighborhoods.
2
FILE NO.: Z-9443 (Cont.)
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Baseline Road is classified on the Master Street Plan as a principal arterial with
special design standard. Dedication of right-of-way to 45 feet from centerline
will be required.
2. The rear parking lot driveway should be constructed with a concrete driveway
apron on Distribution Drive.
3. A shared access easement must be obtained from the neighboring property
owner if the gravel driveway is on the neighbor's property or if both properties
will take access.
E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation AuthorifY: Sewer available to this site. Capacity
Fee Analysis required.
Enter : No comment received.
CenterPoint Ene[gy: No comment.
AT & T: No comment received.
Central Arkansas Water:
All Central Arkansas Water requirements in effect at the time of request for water
service must be met. The Little Rock Fire Department needs to evaluate this site
to determine whether additional public and/or private fire hydrant(s) will be
required. If additional fire hydrant(s) are required, they will be installed at the
Developer's expense. Please submit plans for water facilities and/or fire protection
system to Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures for
installation of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and Little Rock Fire Department is
required. Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZ) is required on the domestic
water service. This assembly must be installed prior to the first point of use.
Central Arkansas Water (CAW) requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by CAW. The test results
must be sent to CAW's Cross Connection Section within ten days of installation
and annually thereafter. Contact the Cross Connection Section at 377-1226 if you
would like to discuss backflow prevention requirements for this project. A Capital
Investment Charge based on the size of meter connection(s) will apply to this
3
FILE NO.: Z-9443
project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
Fire Department:
Full Plan Review
Maintain Access:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per Appendix D
of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road
width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall
not exceed 10 percent in grade except as approved by the fire chief.
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading.
Facilities, buildings or portions of buildings hereafter constructed shall be
accessible to fire department apparatus by way of an approved fire apparatus
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least 75,000 pounds.
Commercial and Industrial Developments — 2 means of access. - Maintain fire
apparatus access roads as per Appendix D of the 2012 Arkansas Fire Prevention
Code Vol. 1
Section D104.1 Buildings exceeding three stories or 30 feet in height. Building
or facilities exceeding 30 feet or three stories in height shall have at least two
means of fire apparatus access for each structure.
Section D104.2 Building exceeding 62,000 square feet in area. Buildings or
facilities having a gross building area of more than 62,000 square feet shall be
provide with two separate and approved fire apparatus access roads.
Exception: Projects having a gross building area of up to 124,000 square
feet that have a single approved fire apparatus access road when all
building are equipped throughout with approved automatic sprinkler
systems.
D104.3 Remoteness. Where two fire apparatus access roads are required, they
shall be placed a distance apart equal to not less than one half of the length of the
maximum overall diagonal dimension of the lot or area to be served, measured in
a straight line between accesses.
4
FILE NO.: Z-9443 (Cont.
Dead Ends.
Maintain fire apparatus access roads at dead end locations as per Appendix
D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead
Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
Gates
Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access
road gates. Gates securing the fire apparatus access roads shall comply with
all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times and
replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices
shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or
when a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with UL
325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
Fire Hydrants
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas
Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal's Office
(Capt. Tony Rhodes 501-918-3757). Number and Distribution of Fire Hydrants as
per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment received.
5
FILE NO.: Z-9443 (Cont.
F. BUILDING CODESILANDSCAPE:
Building Code:
Project is a change in occupancy and is therefore subject to current building code
requirements. Review and approval is required by Building Codes Division before
occupancy takes place. For information on submittal requirements and the review
process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; criche littierock.or or
Steve Crain at 501-371-4875I strain Iittlerock. ov
NOTE: This will most likely be classified as an Institutional
Occupancy and Institutional Occupancies are required to
have Fire Sprinkler and Fire Alarm Installations.
Landscape:
1. Any new site development must comply with the City's minimal landscape and
buffer ordinance requirements.
2. Any existing vehicular use area that does not meet current code requirements
may continue as nonconforming until such time a building permit is issued to
rehabilitate a structure on the property exceeding fifty (50) percent of the
current replacement cost of the structure. At such time fifty (50) percent of the
existing vehicular use area shall be brought into compliance with current code
and shall continue to full compliance on a graduated scale based upon the
percentage of rehabilitation cost.
3. The City Beautiful Commission recommends preserving as many existing trees
as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. TRANSPORTATION/PLAN NING:
Rock Region Metro: Include sidewalk from building to Baseline Road.
Planning Division: This request is located in Geyer Springs West Planning District.
The Land Use Plan shows Light Industrial (LI) for this property. This category
provides for light warehouse, distribution or storage uses, and/or other industrial
uses that are developed in a well -designed "park like" setting. The applicant has
applied for a rezoning from 1-2 (Light Industrial District) to PID (Planned Industrial
Development District) to allow a residential treatment facility in the existing building
while maintaining the 1-2 uses for the property.
A
FILE NO.: Z-9443 (Cont.
Master Street Plan: To the south of the property is Baseline Road Street and it is
a Principal Arterial on the Master Street Plan. A Principal Arterial is to serve
through traffic and to connect major traffic generators or activity centers within the
urbanized area. Entrances and exits should be limited to minimize negative effects
of traffic and pedestrians on Baseline Road since it is a Principal Arterial. This
street may require dedication of right-of-way and may require street improvements
for entrances and exits to the site.
Bicvcle Plan: There is a Class II Bike Path shown on Baseline Road. This Bike
Lane provides a portion of the pavement for the sole use of bicycles.
H. SUBDIVISION COMMITTEE COMMENT: JAugust 7, 2019)
The applicant was present. Staff presented the item to the committee and
requested information about any proposed signage or fences on the property. The
Public Works comment regarding the access to Distribution Drive was also
discussed. Other review comments were noted. Responses are to be received
by August 14, 2019. The committee forwarded the item to the full commission.
ANALYSIS:
The applicant has worked with the property owner to secure a preliminary access
easement along the rear of the property to Distribution Drive. This would be
formalized should this request be approved. Any signage would reface existing
signs on the property. The current plans for fencing would be to upgrade the
chain -link fence in the rear; however, there is no intention to install any fencing in
the front of the property or to have a fence surrounding the property.
The need for treatment facilities is established. Staff supports the proposed use
at this location, as it is located on a primary transportation corridor with two bus
routes and has some separation from residential neighborhoods.
STAFF RECOMMENDATION:
Staff recommends approval of the request to rezone the property to the PID subject
to compliance with the comments and conditions outlined in paragraphs D, E, and
F and the staff analysis in the agenda staff report.
PLANNING COMMISSION ACTION: (AUGUST 29, 2019)
The applicant was present. There were no registered objectors present. Staff presented
the item and a recommendation of approval as outlined in the "staff recommendation"
above. There was no further discussion. The item was placed on the consent agenda
and approved as recommended by staff, including all staff comments and conditions. The
vote was 8 ayes, 0 noes, 2 absent, and 1 open position.
7
August 29, 2019
ITEM NO.: 10
NAME: Freshly Renewed Short -form PID
LOCATION: 8404 Baseline Road
DEVELOPER:
Terrell Newton
Freshly Renewed Faith -Based Transitional
8404 Baseline Road
Little Rock, AR 72209
501-944-1406
OWNER/AUTHORIZED AGENT:
Karen and John Hartnack/Owner
Terrell Newton/Agent
SURVEYOR/ENGINEER:
Hope Consulting Engineers-Surveyors/Surveyor
AREA: 0.81 acres
WARD: 7
CURRENT ZONING
ALLOWED USES
PROPOSED ZONING
NUMBER OF LOTS: 1
PLANNING DISTRICT: 15
1-2 Light Industrial
1-2 Light Industrial
.N
NO.: Z-9443
FT. NEW STREET: 0 LF
CENSUS TRACT: 41.03
PROPOSED USE: Residential addiction treatment and transitional housing
with 1-2 uses.
VARIANCE/WAIVERS: None
August 29, 2019
SUBDIVISION
ITEM NO.: 10 [Cant.
BACKGROUND:
ILE NO.: Z-9443
The property at 8404 Baseline Road has been used as commercial and industrial -type
uses for a number of years. A proposal to allow a church and light industrial uses at the
site was submitted and withdrawn in 2008.
A. PROPOSAL/REQUEST/APPLICANT'S STATEMENT:
Freshly Renewed is a faith -based nonprofit organization in operation since
November 2016, licensed with Peer Specialist, Counselors in Training supervised
by a drug and alcohol counselor licensed by the state. Freshly Renewed offers a
structured living facility for men and women who battle addiction providing a safe
environment to live sober and learn to be productive members of society.
Currently, Freshly Renewed has three locations in Little Rock. Approval of this
request consolidate two sites to 8404 Baseline Road. This larger facility would
allow for the organization to grow and offer more service to their clients.
8404 Baseline would be a treatment facility for men. Staff having offices there
would include a Licensed Therapist (LCSW), licensed counselors, peer specialist,
and managers. Living quarters for men suffering from drug, alcohol, and mental
illness would also be provided. Facility managers will reside at the location at all
times. The facility intends to accept clients from the VA, detox facilities such as
Bridgeway, Baptist, and St. Vincent, as well as the Department of Corrections.
The proposal seeks up to 40 beds available for clients during treatment. The
building would also have showers, toilets, and sinks for residents and a commercial
kitchen.
B. EXISTING CONDITIONS:
The property contains a 5600 square foot industrial building. Parking is located in
the front of the building and in the rear.
Situated on the edge of a commercial/industrial area located north of Baseline
Road, directly across Baseline Road is an apartment complex. Additional office
and commercial uses buffer the single-family neighborhood to the south.
C. NEIGHBORHOOD COMMENTS:
As of this writing, staff has not received any comments from area property owners
or neighborhood associations. Notice of the public hearing was sent to all owners
of properties located within 200 feet of the site, as well as the West Baseline and
Southwest Little Rock United for Progress neighborhoods.
2
August 29, 2019
SUBDIVISION
ITEM NO.: 10 (Cont.) FILE
D. ENGINEERING COMMENTS:
PUBLIC WORKS CONDITIONS:
1. Baseline Road is classified on the Master Street Plan as a principal arterial with
special design standard. Dedication of right-of-way to 45 feet from centerline
will be required.
2. The rear parking lot driveway should be constructed with a concrete driveway
apron on Distribution Drive.
3. A shared access easement must be obtained from the neighboring property
owner if the gravel driveway is on the neighbor's property or if both properties
will take access.
E. UTILITIES/FIRE DEPARTMENT/PARKS/COUNTY PLANNING:
Little Rock Water Reclamation Authority: Sewer available to this site. Capacity
Fee Analysis required.
Entergy: No comment received.
CenterPoint Enerav: No comment.
AT & T: No comment received.
Central Arkansas Water:
All Central Arkansas Water requirements in effect at the time of request for water
service must be met. The Little Rock Fire Department needs to evaluate this site
to determine whether additional public and/or private fire hydrant(s) will be
required. If additional fire hydrant(s) are required, they will be installed at the
Developer's expense. Please submit plans for water facilities and/or fire protection
system to Central Arkansas Water for review. Plan revisions may be required after
additional review. Contact Central Arkansas Water regarding procedures for
installation of water facilities and/or fire service. Approval of plans by the Arkansas
Department of Health Engineering Division and Little Rock Fire Department is
required. Due to the nature of this facility, installation of an approved reduced
pressure zone backflow preventer assembly (RPZ) is required on the domestic
water service. This assembly must be installed prior to the first point of use.
Central Arkansas Water (CAW) requires that upon installation of the RPZA,
successful tests of the assembly must be completed by a Certified Assembly
Tester licensed by the State of Arkansas and approved by CAW. The test results
must be sent to CAW's Cross Connection Section within ten days of installation
3
August 29, 2019
SUBDIVISION
ITEM NO.: 10 (Cont.
FILE NO.: Z-9443
and annually thereafter. Contact the Cross Connection Section at 377-1226 if you
would like to discuss backflow prevention requirements for this project. A Capital
Investment Charge based on the size of meter connection(s) will apply to this
project in addition to normal charges. This fee will apply to all connections
including metered connections off the private fire system.
Fire Department:
Full Plan Review
Maintain Access:
Fire Hydrants.
Maintain fire apparatus access roads at fire hydrant locations as per Appendix D
of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.1 Access road
width with a hydrant. Where a fire hydrant is located on a fire apparatus access
road, the minimum road width shall be 26 feet, exclusive of shoulders.
Grade
Maintain fire apparatus access roads as per Appendix D of the 2012 Arkansas Fire
Prevention Code Vol. 1 Section D103.2 Grade. Fire apparatus access roads shall
not exceed 10 percent in grade except as approved by the fire chief.
Loading
Maintain fire apparatus access road design as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D102.1 Access and loading.
Facilities, buildings or portions of buildings hereafter constructed shall be
accessible to fire department apparatus by way of an approved fire apparatus
access road with an asphalt, concrete or other approved driving surface capable
of supporting the imposed load of fire apparatus weighing at least 75,000 pounds.
Commercial and Industrial Developments — 2 means of access. - Maintain fire
apparatus access roads as per Appendix D of the 2012 Arkansas Fire Prevention
Code Vol. 1
Section D104.1 Buildings exceeding three stories or 30 feet in height. Building
or facilities exceeding 30 feet or three stories in height shall have at least two
means of fire apparatus access for each structure.
Section D104.2 Building exceeding 62,000 square feet in area. Buildings or
facilities having a gross building area of more than 62,000 square feet shall be
provide with two separate and approved fire apparatus access roads.
Exception: Projects having a gross building area of up to 124,000 square
feet that have a single approved fire apparatus access road when all
0
August 29, 2019
SUBDIVISION
ITEM NO.: 1
FILE NO.: Z-9443
building are equipped throughout with approved automatic sprinkler
systems.
D104.3 Remoteness. Where two fire apparatus access roads are required, they
shall be placed a distance apart equal to not less than one half of the length of the
maximum overall diagonal dimension of the lot or area to be served, measured in
a straight line between accesses.
nPad Fnrls_
Maintain fire apparatus access roads at dead end locations as per Appendix
D of the 2012 Arkansas Fire Prevention Code Vol. 1 Section D103.4 Dead
Ends. Dead-end fire apparatus access roads in excess of 150 feet shall be
provided with width and turnaround provisions in accordance with Table D103.4.
Requirements for Dead-end fire apparatus access roads.
Gates
Maintain fire apparatus access road gates as per Appendix D of the 2012
Arkansas Fire Prevention Code Vol. 1 Section D103.5 Fire apparatus access
road gates. Gates securing the fire apparatus access roads shall comply with
all of the following criteria:
1. Minimum gate width shall be 20 feet.
2. Gates shall be of swinging or sliding type.
3. Construction of gates shall be of material that allow manual operation by one
person.
4. Gate components shall be maintained in an operable condition at all times and
replaces or repaired when defective.
5. Electric gates shall be equipped with a means of opening the gate by fire
department personnel for emergency access. Emergency opening devices
shall be approved by the fire code official.
6. Manual opening gates shall not be locked with a padlock or chain and padlock
unless they are capable of being opened by means of forcible entry tools or
when a key box containing the keys to the lock is installed at the gate location.
7. Locking device specifications shall be submitted for approval \by the fire code
official
8. Electric gate operators, where provided, shall be listed in accordance with UL
325.
9. Gates, intended for automatic operation shall be designed, constructed and
installed to comply with requirements of ASTM F 2200.
5
August 29, 2019
SUBDIVISION
ITEM NO.: 10 (Cont.
Fire Hydrants
FILE NO.: Z-9443
Locate Fire Hydrants as per Appendix C of the 2012 Arkansas Fire
Prevention Code. Section C101 — C105, in conjunction with Central Arkansas
Water (Daniel Tull 501-377-1245) and the Little Rock Fire Marshal's Office
(Capt. Tony Rhodes 501-918-3757). Number and Distribution of Fire Hydrants as
per Table C105.1.
Parks and Recreation: No comment received.
County Planning: No comment received.
F. BUILDING CODES/LANDSCAPE:
Building Code:
Project is a change in occupancy and is therefore subject to current building code
requirements. Review and approval is required by Building Codes Division before
occupancy takes place. For information on submittal requirements and the review
process, contact a commercial plans examiner:
Curtis Richey at 501.371.4724; crichelittlerock.orq or
Steve Crain at 501-371-4875, scrainQlittlerock.gov
NOTE: This will most likely be classified as an Institutional
Occupancy and Institutional Occupancies are required to
have Fire Sprinkler and Fire Alarm Installations.
Landscape:
Any new site development must comply with the City's minimal landscape and
buffer ordinance requirements.
2. Any existing vehicular use area that does not meet current code requirements
may continue as nonconforming until such time a building permit is issued to
rehabilitate a structure on the property exceeding fifty (50) percent of the
current replacement cost of the structure. At such time fifty (50) percent of the
existing vehicular use area shall be brought into compliance with current code
and shall continue to full compliance on a graduated scale based upon the
percentage of rehabilitation cost.
0
August 29, 2019
SUBDIVISION
ITEM NO.: 10
FILE NO.: Z-9443
3. The City Beautiful Commission recommends preserving as many existing trees
as feasible on this site. Credit toward fulfilling Landscape Ordinance
requirements can be given when preserving trees of six (6) inch caliper or
larger.
G. TRANSPORTATION/PLANNING-
Rock Region Metro: Include sidewalk from building to Baseline Road.
Planning Division: This request is located in Geyer Springs West Planning District.
The Land Use Plan shows Light Industrial (LI) for this property. This category
provides for light warehouse, distribution or storage uses, and/or other industrial
uses that are developed in a well -designed "park like" setting. The applicant has
applied for a rezoning from 1-2 (Light Industrial District) to PID (Planned Industrial
Development District) to allow a residential treatment facility in the existing building
while maintaining the 1-2 uses for the property.
Master Street Plan: To the south of the property is Baseline Road Street and it is
a Principal Arterial on the Master Street Plan. A Principal Arterial is to serve
through traffic and to connect major traffic generators or activity centers within the
urbanized area. Entrances and exits should be limited to minimize negative effects
of traffic and pedestrians on Baseline Road since it is a Principal Arterial. This
street may require dedication of right-of-way and may require street improvements
for entrances and exits to the site.
Bicycle Plan: There is a Class II Bike Path shown on Baseline Road. This Bike
Lane provides a portion of the pavement for the sole use of bicycles.
H. SUBDIVISION COMMITTEE COMMENT: (August 7, 2019)
The applicant was present. Staff presented the item to the committee and
requested information about any proposed signage or fences on the property. The
Public Works comment regarding the access to Distribution Drive was also
discussed. Other review comments were noted. Responses are to be received
by August 14, 2019. The committee forwarded the item to the full commission.
ANALYSIS:
The applicant has worked with the property owner to secure a preliminary access
easement along the rear of the property to Distribution Drive. This would be
formalized should this request be approved. Any signage would reface existing
signs on the property. The current plans for fencing would be to upgrade the
rl
August 29, 2019
SUBDIVISION
ITEM NO.: 10 (Cont.
FILE NO.: Z-9443
chain -link fence in the rear; however, there is no intention to install any fencing in
the front of the property or to have a fence surrounding the property.
The need for treatment facilities is established. Staff supports the proposed use
at this location, as it is located on a primary transportation corridor with two bus
routes and has some separation from residential neighborhoods.
S STAFF RECOMMENDATIO
Staff recommends approval of the request to rezone the property to the PID subject
to compliance with the comments and conditions outlined in paragraphs D, E, and
F and the staff analysis in the agenda staff report.
PLANNING COMMISSION ACTION: (AUGUST 29, 2019)
The applicant was present. There were no registered objectors present. Staff presented
the item and a recommendation of approval as outlined in the "staff recommendation"
above. There was no further discussion. The item was placed on the consent agenda
and approved as recommended by staff, including all staff comments and conditions. The
vote was 8 ayes, 0 noes, 2 absent, and 1 open position.
E:3