HomeMy WebLinkAboutZ-9430 Map 10GAST STONE GAP
DRIP EDGE
1 1-2 II
� II
� �I-4
4
SECTION E=LEVATION
PREGAST GAP
1/2" RADIUS DRIP LINE
METAL FRAME BORDER
BETWEEN STONE VENEER
STUGGO SION PANEL
PREGAST GAP WITH DRIP
EDGE; COLOR TO MATCH
PINEAPPLE GROVE
GOASTAL IVORY
STONE VENEER TO MATCH
MAIN MONUMENT SIGNS
STUGGO SION PANEL
HADDONSTONE STANDARD
PIER GAP ON PIER
HADDONSTONE CONTOUR
TYPE PIER - J 110
HAND -RUBBED GAST IN PLAGE
PGONGRETE SION BASE
GRADE
RE I NFORGED GONGRETE
FOOTING, DESIGNED
BY TENANT
STONE VENEER TO
MATCH MAIN
MONUMENT SIGNS
BLAGK POWDERGOATED
METAL FRAME
ORNAMENTAL METAL
SCROLL
STUGGO SIGN PANEL
NOTE:
I. TENANT S�
SHOP DRAM
LANDLORD
PLAN
VARIES PER
LOCATION
101_o11
ELEVATION
MONUMENT SION
GODS a
STRUGTURE
DESIGN
PREGAST GAP WITH DRIP EDGE;
COLOR TO MATCH PINEAPPLE
GROVE GOASTAL IVORY
HAND -RUBBED GAST IN
PLAGE GONGRETE SIGN BASE
HADDONSTONE STANDARD
PIER GAP ON PIER
BLAGK POWDER-GOATED
METAL FRAME, WITH ORNAMENTAL
METAL SCROLL AROUND EDGES
OF STUGGO SIGN PANEL.
PREGAST GAP WITH DRIP EDGE;
DOLOR TO NIATGH PINEAPPLE
GROVE COASTAL IVORY
PIN -MOUNTED, GUT ALUMINUM,
REVERSE GHANNEL HALO -LIT
TENANT LOGO $ TEXT PER
PER TENANT GRITERIA
MANUAL STANDARDS
STUGGO
GHT OGREAM GOLOi:�
STONE VENEER TO MATCH
MAIN MONUMENT SIGNS
HADDONSTONE STANDARD
PIER GAP ON PIER
HADDONSTONE CONTOUR
TYPE PIER - J110
HAND -RUBBED GAST IN
PLAGE GONGRETE SION BASE
ORADE-VARIES PER
LOCATION; TENANT TO
DESIGN. EXPOSED FOOTING
SHALL BE GONGRETE STAINED
TO MATCH SIGN PREGAST
STONE. LANDSGAPE TO
SGREEN AS MUCH EXPOSED
GONGRETE FOOTING AS
POSSIBLE.
RE I NFORGED GONGRETE
FOOTING, DESIGNED
BY TENANT
NOTE:
I. TENANT SHALL SUBMIT
SHOP DRAWINGS FOR
REVIEW AND APPROVAL OF
ALL MATERIALS, COLORS,
SIZES, AND LOGO � TEXT.
2. LOCATION OF PAD SION
SHALL BE APPROVED BY
DEVELOPER.