Loading...
HomeMy WebLinkAboutZ-9430 Map 10GAST STONE GAP DRIP EDGE 1 1-2 II � II � �I-4 4 SECTION E=LEVATION PREGAST GAP 1/2" RADIUS DRIP LINE METAL FRAME BORDER BETWEEN STONE VENEER STUGGO SION PANEL PREGAST GAP WITH DRIP EDGE; COLOR TO MATCH PINEAPPLE GROVE GOASTAL IVORY STONE VENEER TO MATCH MAIN MONUMENT SIGNS STUGGO SION PANEL HADDONSTONE STANDARD PIER GAP ON PIER HADDONSTONE CONTOUR TYPE PIER - J 110 HAND -RUBBED GAST IN PLAGE PGONGRETE SION BASE GRADE RE I NFORGED GONGRETE FOOTING, DESIGNED BY TENANT STONE VENEER TO MATCH MAIN MONUMENT SIGNS BLAGK POWDERGOATED METAL FRAME ORNAMENTAL METAL SCROLL STUGGO SIGN PANEL NOTE: I. TENANT S� SHOP DRAM LANDLORD PLAN VARIES PER LOCATION 101_o11 ELEVATION MONUMENT SION GODS a STRUGTURE DESIGN PREGAST GAP WITH DRIP EDGE; COLOR TO MATCH PINEAPPLE GROVE GOASTAL IVORY HAND -RUBBED GAST IN PLAGE GONGRETE SIGN BASE HADDONSTONE STANDARD PIER GAP ON PIER BLAGK POWDER-GOATED METAL FRAME, WITH ORNAMENTAL METAL SCROLL AROUND EDGES OF STUGGO SIGN PANEL. PREGAST GAP WITH DRIP EDGE; DOLOR TO NIATGH PINEAPPLE GROVE COASTAL IVORY PIN -MOUNTED, GUT ALUMINUM, REVERSE GHANNEL HALO -LIT TENANT LOGO $ TEXT PER PER TENANT GRITERIA MANUAL STANDARDS STUGGO GHT OGREAM GOLOi:� STONE VENEER TO MATCH MAIN MONUMENT SIGNS HADDONSTONE STANDARD PIER GAP ON PIER HADDONSTONE CONTOUR TYPE PIER - J110 HAND -RUBBED GAST IN PLAGE GONGRETE SION BASE ORADE-VARIES PER LOCATION; TENANT TO DESIGN. EXPOSED FOOTING SHALL BE GONGRETE STAINED TO MATCH SIGN PREGAST STONE. LANDSGAPE TO SGREEN AS MUCH EXPOSED GONGRETE FOOTING AS POSSIBLE. RE I NFORGED GONGRETE FOOTING, DESIGNED BY TENANT NOTE: I. TENANT SHALL SUBMIT SHOP DRAWINGS FOR REVIEW AND APPROVAL OF ALL MATERIALS, COLORS, SIZES, AND LOGO � TEXT. 2. LOCATION OF PAD SION SHALL BE APPROVED BY DEVELOPER.